Submits Addendum to 930218 Response to NRC SE Re Util 120- Day Response to Suppl 1 to GL 87-02 W/Respect to Wording Used in Paragraph I of Subj Response.Util Commits to Entire GIP-2,per Addendum
ML20035E775
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/16/1993
From: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-02, GL-87-2, NUDOCS 9304190230
Download: ML20035E775 (2)


Text

.

i

?

9

@, Consumers l

i power Patrick M Donnelly

[

Plant Manager i

90WERN06 i

AEKN0GAN5 PROGRESS l

e., noa e nt Nuclear Pisnt.10269 US 31 North, Charlewom. MI 49720 April 16, 1993 i

a Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 1

DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

i ADDENDUN TO A RESPONSE TO A NRC SAFETY EVALUATION CONCERNING CONSUMERS POWER COMPANY'S 120 DAY RESPONSE TO SUPPLEMENT 1 TO GENERIC LETTER 87-02 DATED FEBRUARY 18, 1993 On April 13, 1993, a teleconference was arranged between the Office of Nuclear.

Reactor Regulation (NRR) and Big Rock Point Licensing Staff. An NRR reviewer from the Mechanical Engineering Branch explained that the wording used in I

paragraph I. of the February 18, 1993 response needed clarification to satisfy e

NRC legal concerns.

(NOTE: The wording in question was recommended by the Seismic Qualification Utility Group-(SQUG), and a generic NRC concern exists with the statement. All utilities that used this statement will be subject to offering the NRC a clarification of their intentions).

The segment of the statement that is not acceptable to the NRC reads "With i

regard to this concern, Consumers Power Company's actions will be in accordance with Part I, Section 1.3 of the GIP. Rev 2 (corrected February 14, 1992), herein referred to as the GIP-2, which was accepted by the Staff in its SSER No. 2 on the GIP, dated May 22, 1992."

The NRC does not interpret this as a commitment to the entire GIP-2, which the Staff reviewed and accepted in SSER No. 2.

Therefore, per this addendum, Consumers Power Company commits to the entire GIP-2, i.e., the SQUG commitments and implementation guidance portions of Part II. This issue is currently being managed by inclusion in:

The " Plan for the Big Rock Point Integrated Assessment", which is part of i

the Facility Operating Licensing.

(The Plan provides a means for requirements to be accommodated taking into account schedule and resource constraints, as well as the importance of implementing requirements); and The facilities End-of-License strategy, which is being designed to achieve end of licensed life May 31, 2000.

e ffh I,.0 l 9304190230 930416 PDR ADOCK 05000155 p,

PDR A C45ENERGYCOMPANY i

NUCLEAR REGULATORY COMMISSION 2

BIG ROCK POINT PLANT ADDENDUM TO RESPONSE TO GENERIC LETTER 87-02 (SQUG)

April 16, 1993 i

Consimers Power Company understands that the process for deviation will still be a accordance with Part I, Section 1.3 of the GIP-2.

j

/ /?? & <&wteD Patrick M Donnelly Plant Manager CC: Administrator, Region 111, USNRC NRC Resident luspector - Big Rock Point l