ML20035E650
| ML20035E650 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 04/12/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9304190058 | |
| Download: ML20035E650 (3) | |
Text
- -.. -
~_
j GENuclearEnergy s
cews fme >;w,,
r5Ces a a-
- u. c: -D25 i
l-
.1 April 12,1993 Docket No. STN 52-001 i
1 I
r Chet Poslusny, Senior Project Manager Standardization Project Directorate
-l Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation l
i
Subject:
Submittal Supporting Accelerated ABWR Review Schedule - DFSER Confirmatory Item 7.2.1-2 1
Dear Chet:
Enclosed is a markup of DFSER Confirmatory Item 7.2.1-2.
Please provide a copy of this transmittal to Jim Stewart.
i Sincerely, f
I 90 1
Jack Fox Advanced Reactor Programs cc: Fred Chao (GE)
Norman Fletcher (DOE) l l.
JI93-BB 1
l l-9304190058 930412 i~
.PDR. ADOCK 05200001 A-PDR
j
{
23A6100AC i
. Standard Plant nry c Table 1.8-22 EXPERIENCE INFORMATION APPLICABLE TO ABWR (Continued)
TYPE: IE BULLETINS Issue l
Esh Dalt.
Ill!c Comment i
col o p { \\' C * ^$+
=
l 88-07, 12/30/88 Power Oscillations in Boiling Water Reactors (BWRs)
Suppi i
90-01 03/09/90 Loss of Fill-Oil in Transmitters Manufactured by l
Rosemount i
90-02 03/20/90 Loss of Thermal Margin Caused by Channel Box Bow 91-01 10/18/91 Reporting less of Criticality Safety Controls l
i r
i t
l t
)
aggh ecd ws 11 imp k wM de. B W R. O Cs sol d on
+ COL o E \\n s b(ls og em Opgp gjshh, Amendment 20 1 & 73
-. _. -