Forwards Electrical Distribution Sys Followup Insp Repts 50-295/93-07 & 50-304/93-07 on 930329-0402.No Violations Noted
ML20035E607
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/13/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20035E608 List:
References
NUDOCS 9304190032
Download: ML20035E607 (2)


See also: IR 05000295/1993007

Text

.

-

DtQtCo

UWIT E D ST AT E S

p

fg

NUCLEAR REGULATORY COMMisslON

3

v9

p,

ntcson m

E

^f

799 ROOSEVELT RO AD

$

g

GLEN ELLYN. ILLINOIS 60137

Y

4' . . . . . *d

g;; i e 1933

i

Docket No. 50-295

j

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. L. O. De1 George

Vice President

Nuclear Oversight and

l

Regulatory Services

Executive Towers West III

1400 Opus Place - Suite 300

Downers Grove, IL 60515

Dear Mr. De1 George:

1

This refers to the special electrical distribution system followup inspection

conducted by Messrs. Z. Falevits and R. Mendez of this office on March 29

through April 2, 1993. This followup inspection included a review of

activities authorized for your Zion Nuclear Power Station, Units 1 and 2.

We

discussed our inspection findings with Mr. D. Wazniak and others of your staff

at the conclusion of the inspection on April 2, 1993.

The inspection reviewed issues identified during the 1992 EDSF1, and selected

j

design changes and modifications. Areas examined during the inspection are

identified in the report. The inspection consisted of a selective examination

of procedures and representative records, field walkdowns and interviews.

The

inspection concluded that progress was being made in resolving the EDSFI

issues. No significant findings were identified in the design change or

modification areas; however, the inspectors noted that loose terminations (hot

spots) identified during the performance of thermography were not promptly

corrected.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

l

,

i

l

l

16006G

<

g i

9304190032 930413

\\

PDR

ADOCK 05000295

l

G

PDR

-

64/c-fEo /

_

.

._

_.

_

__

___

_

_ _ . _ .

_

_

_

_.

_ _ . . .

l

!

'

.

1

.

-

Comonwealth Edison Company

2

APR 101993

J

We will gladly discuss any questions you have concerling this inspection.

Sincerely,

1

x. . .,;

G. C. Wright,

e,

l

Engineering Branch

1

!

Enclosure: Inspection Reports

l

No. 50-295/93007(DRS);

j

No. 50-304/93007(DRS)

!

!

cc w/ enclosure:

)

R. Tuetken, Site Vice

i

President

.

1

T. Joyce, Station Manager

.;

S. . Kapl an, - Regul atory

i

Assurance Supervisor.

J

D. Farrar, Nuclear Regulatory

<

Services Manager

]

OC/LFDCB

!

Resident Inspectors - Byron,

!

.

Braidwood, Zion

Richard Hubbard

Mayor, City of Zion

!

J. W. McCaffrey, Chief.

l

Pubilic Utilities Division

LPM, NRR

Robert Newmann, Office of t'ublic

l

Counsel, State of Illinois

'

Robert M. Thompson, Administrator

Wisconsin Division.of Emergency

Government

State Liaison Officer

l

Chairman, Illinois Commerce Commission

!

l

1

, -

.

. .

-

. - . .

-

= , . . - - . .

. . .

. . ,

- . - . . . . - - . . - . . . .

- . .

., . - . . . A