ML20035E607
| ML20035E607 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 04/13/1993 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20035E608 | List: |
| References | |
| NUDOCS 9304190032 | |
| Download: ML20035E607 (2) | |
See also: IR 05000295/1993007
Text
.
-
DtQtCo
UWIT E D ST AT E S
p
fg
NUCLEAR REGULATORY COMMisslON
3
v9
p,
ntcson m
E
^f
$
g
GLEN ELLYN. ILLINOIS 60137
Y
4' . . . . . *d
g;; i e 1933
i
Docket No. 50-295
j
Docket No. 50-304
Commonwealth Edison Company
ATTN: Mr. L. O. De1 George
Vice President
Nuclear Oversight and
l
Regulatory Services
Executive Towers West III
1400 Opus Place - Suite 300
Downers Grove, IL 60515
Dear Mr. De1 George:
1
This refers to the special electrical distribution system followup inspection
conducted by Messrs. Z. Falevits and R. Mendez of this office on March 29
through April 2, 1993. This followup inspection included a review of
activities authorized for your Zion Nuclear Power Station, Units 1 and 2.
We
discussed our inspection findings with Mr. D. Wazniak and others of your staff
at the conclusion of the inspection on April 2, 1993.
The inspection reviewed issues identified during the 1992 EDSF1, and selected
j
design changes and modifications. Areas examined during the inspection are
identified in the report. The inspection consisted of a selective examination
of procedures and representative records, field walkdowns and interviews.
The
inspection concluded that progress was being made in resolving the EDSFI
issues. No significant findings were identified in the design change or
modification areas; however, the inspectors noted that loose terminations (hot
spots) identified during the performance of thermography were not promptly
corrected.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
l
,
i
l
l
16006G
<
g i
9304190032 930413
\\
ADOCK 05000295
l
G
-
64/c-fEo /
_
.
._
_.
_
__
___
_
_ _ . _ .
_
_
_
_.
_ _ . . .
l
!
'
.
1
.
-
Comonwealth Edison Company
2
APR 101993
J
We will gladly discuss any questions you have concerling this inspection.
Sincerely,
1
x. . .,;
G. C. Wright,
e,
l
Engineering Branch
1
!
Enclosure: Inspection Reports
l
No. 50-295/93007(DRS);
j
No. 50-304/93007(DRS)
!
!
cc w/ enclosure:
)
R. Tuetken, Site Vice
i
President
.
1
T. Joyce, Station Manager
.;
S. . Kapl an, - Regul atory
i
Assurance Supervisor.
J
D. Farrar, Nuclear Regulatory
<
Services Manager
]
OC/LFDCB
!
Resident Inspectors - Byron,
!
.
Braidwood, Zion
Richard Hubbard
Mayor, City of Zion
!
J. W. McCaffrey, Chief.
l
Pubilic Utilities Division
LPM, NRR
Robert Newmann, Office of t'ublic
l
Counsel, State of Illinois
'
Robert M. Thompson, Administrator
Wisconsin Division.of Emergency
Government
State Liaison Officer
l
Chairman, Illinois Commerce Commission
!
l
1
, -
.
. .
-
. - . .
-
= , . . - - . .
. . .
. . ,
- . - . . . . - - . . - . . . .
- . .
., . - . . . A