Monthly Operating Rept for Mar 1993 for Yankee Atomic Power Station
ML20035E562
Person / Time
Site: Maine Yankee
Issue date: 03/31/1993
From: Stewart Bailey, Hebert J
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JRH-93-70, MN-93-37, NUDOCS 9304160188
Download: ML20035E562 (6)


Text

-

MaineYankee

~

RELIABLE ELECTRICITY FOR MAINE SINCE 1972 l

l EDISON DFUVE. AUGUSTA. MAINE 04330 (207) 622 4868 I

I i

l April 8, 1993 MN-93-37 JRH-93-70 i

i UNITED STATES NUCLEAR REGULATORY COMMISSION.

l Attention: Document Control Desk Washington, DC 20555

References:

(a)

License No. DPR-36 (Docket No. 50-309)

(b) NUREG-0020, Licensed Operating Reactor Status Summary Report

Subject:

Maine Yankee Monthly Statistical Report - March 1993 l

Gentlemen:

l Enclosed please find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for March 1993.

Please contact me should you have-any further questions.

Very truly yours, M

W James R. Hebert, Manager Licensing & Engineering Support Department l

l SJB/ jag Enclosure c:

Mr. Thomes T. Martin Mr. Charles S. Marschall Mr. E. H. Trottier Mr. Patrick J. Dostie i

/[ I {

9304160188 930331 Li\\ow\\esu PDR M K O M 309 i

R PDR

~-

l l

l l

f i

I l

(

Maine yankee l

I i

n l

l h

Monthly Statistical Report For March 1993

)

a i

4 i

~

. OPERATING DATA REPORT Docket No.:

50-339 Date:

09/Apr/93 Completed By:

S.

J.

BAILEY Telephone 207-622-4868 1.

Unit Name.......................................

Maine Yankee 2.

Reporting Period................................

March 1993 3.

Licensed Thermal Power (MWt)....................

2700 4.

Nemeplate Rating (Gross MWe)....................

920 5.

Design Electrical Rating (Net MWe)..............

870

6. Maximum Dependable Capacity (Gross HWe).........

900 7.

Maximum Dependable Capacity (Net MWe)...........

860 8.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

_NO CHANGES 9.

Power Level to Which Restricted, if Any (Net MWe)

10. Reasons for Re=trictions, if Any:

THIS MONTH-YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 744.00 2,160.00
12. Number of Hours Reactor Was Critical...........

744.00 2.097.30 143.862.51

13. Roactor Reserve Shutdown Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

744.00 2.050.10 139.682.13 l 15. Unit Reserve Shutdown l

Hours..................

0.00 0.00 0.00

! 16. Gross Thermal Energy Generated (MWH)........

2.008.187.00 5.403.612.00 328,556,535.00

17. Gross Electrical Energy Generated (MWH)........

676,490.00 1,813.940.00 108,111.400.00 l18. Net Electrical Energy l

Generated (MWH)........

656.012.00 1,757,402.00 103.669.374.00

19. Unit Service Factor......

100.00 94.91 78.18

20. Unit Availabilty Factor.,

100.00 94.91 78.18

21. Unit Capacity Factor j

(Using MDC Net)........

102.53 94.61 72.22

22. Unit Capacity Factor (Using DER Net)........

101.35 93.52 70.62

23. Unit Forced Outage Rate..

0.00 5.09 7.43

24. Shutdowns Scheduled Over Next 6 Months:

Date Type Duration 7/31/93 Refuelino 8 weeks i

l25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A___

l t

i

l.

I t

Docket No:

50-309 Unit Name Maine Yankee Date:

94-01-93 Completed By:

S.J.

Bailey Telephone:

207-622-4868 t

Report Month: March, 1993 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES l

At the beginnina of the month, the unit was operating at 100% power.

I The unit remained at leet power for the entire month.

l e

i C

l s

i

AVERAGE DAILY UNIT POWER LEVEL FOR MARCH 1993 Docket No.

50-309

{

Unit:

Maine Yankee Date:

06/Apr/93 Completed By:

S-J. BAILEY l

Telephone:

207-622-4868 t

I 1

i i

i

, Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)

(MNe-Net) l l

1 882 16 881 l

t j.

2 880 17 882 l

l I

3 880

'18 881 b

4 882 19-881 5

880 20 882 l

6 881 21 882 i

l 7

881 22 881 8

882 23 883 9

882 24 882 l

10 883 25 880 l

t 11 880 26 883 i

I 12 880 27 883 13 880 28 883 14 882 29 884 15 882 30 884 1

31-884 l

i l

I I

I i

g

,m.,

UNIT.SHUTDONES AND PONER REDUCTIONS Decket No.:

53-309

' ~

FOR MARCH 1993 Unit Maina Ycnkoo Date:

04/ 09 /93 Completed By:

S. J.

BAILEY Telephone:

207-622-4868 Page:

1 of 1 Nu1ber Date l

i I

Type (1)

)l l

Duration (Hours)

Reason (2) 1 Method (3) l j

l l LER 8 l

System Code (4)

Cocponent Code (5)

Cause and Corrective Action

(

l l

1.

TYPE:

2. RFASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions for Preparation of Data l

(S)cheduled G-Operational Error

~,

Entry Sheets for H-Other (Explain) 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Hnintenance or Test 1-Manual C-Rofueling 2-Manual Scram 5.

COMPONENT CODE:

D-Rogulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Oparator Training &

4-Other (Explain) as above.

l License Examination