Text
--
l l
Northem States Power Company I
414 f4icollet Mall fAnneapohs, Minnesota 55401-1927 Telephone (612) 330-5500 August 12, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PIMr Docket No. 50-263 License No. DPR-22 Monthly Operating Report March. 1993 l
i l
Attached is the Monthly Operating Report for March,1993 for the Monticello l
Nuclear Generating Plant.
b kpxd M[%~
Roger O Anderson Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Rris Sanda l
Attachment l
t 9304150122 930331
'/
ADOCK0500g3
\\
PDR R
?
OPERATING DATA REPORT l
DOCKET NO.
50-263
(
DATE 4-1-93 l
COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
March
]
]
- 3. Licensed Thermal Power (MNt):
1670
]
]
1
- 4. Nameplate Rating (Gross MWe):
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe): __564
]
]
- 7. Maximum Dependable Capacity (Net MWe):
536
]
]
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
l l
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A I
f THIS MONTH YR.-TO-DATE CUMULATIVE j
- 11. Hours In Reporting Period 744 2160 190681 i
- 12. Number Of Hours Reactor Was Critical 195.1 823.0 152807.7 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 l
- 14. Hours Generator On-Line 147.8 772.8 150049.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thernal Energy Generated (2003) 225322 992523 230385936
- 17. Gross Electrical Energy Generated (MWH) 76386 329314 77860114 j
l
- 18. Net Electrical Energy Generated (MWH) 70712 309569 74465456 l
- 19. Unit Service Factor 19.9%
35.8%
78.7%
I
- 20. Unit Availability Factor 19.9%
35.8%
78.7%
- 21. Unit Capacity Factor (Using MDC Net) 17.7%
26.7%
72.9%
l
- 22. Unit Capacity Factor (Using DER Net) 17.4%
26.3%
71.6%
1
- 23. Unit Forced Outage Rate 29.2%
7.3%
3.7%
l
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
)
.None i
- 25. If Shut Down At End Of Report Period, Estinated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION l
l.
I i'
\\
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello__
l DATE 4-1-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 I
i MONTH OF March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Ifde-Net )
(MWe-Net) i 1
-3.
17
-5.
2
-3.
18
-5 3
-3.
19
-7.
4
_ -3.
20
-6.
i 5
-3.
21
-7.
6
-3.
22
-9.
7
-4.
23
-10.
8
-4.
24
-8.
9
-4.
25 11.
10
-4.
26 292.
I 11
-3.
27 550.
l F
12
-3.
28 548.
t t
13
-3.
29 551.
l 14
-3.
30 551.
15
-2.
'31
'553.
l 16
-5.
l I
l INSTRUCTIONS l
On this format, list the average daily unit power level in Ifde-Net for each -
day in the reporting month.
Compute to the nearest whole megawatt.
..m....
,--,,r.
j NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE j
l i
DOCKET NO.
50-263 1
DATE 4-1-93 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 i
MONTH MAR i
3-1-93 to Plant shut down for 1993 Refueling Outage.
I 3-21-93 3-21-93 Reactor physics testing in progress.
3-22-93 Reactor critical in A2R3 control rod sequence for Cycle 16 startup.
3-23-93 Reactor scram during turbine valve testing for Cycle 16 startup.
I 3-24-93 Reactor critical.
Shutdown required to repair leaking Safety Relief Valves.
i 3-25-93 Reactor critical.
Generator on-line.
3-26-93 Generator briefly off-line for turbine overspeed test.
to Generator back on-line.
Power operation.
3-31-93 l
i
?
l 1
l i
i i
Note: Power operation defined as essentially-100% of rated power except for weekend load drops for specified surveillance testing.
1
- l. WIT SIRITDOVNS AND POVER REDUCTIONS DOCKET NO.
50-263 UNIT NAME MonticG110 DATE 04-01-93 COMPLETED BY H. H. Paustian-REPORT MONTH March TELEPHONE [612/295-5151 No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to Duration Reason Method LER System Comp.
Cause & Corrective 1)
Shutdown (4)
(5)
Prevent Recurrence (3) 1 03-01-93 S
535.4 C
1 N/A Plant shutdown for 1993 (E0C15) refueling outage 2
03-23-93 F
27.5 G
3 93-006 JI PCV Automatic scram during turbine stop valve leak test caused by procedural change.
3 03-24-93 F
33.3 A
2 N/A SB RV Shutdown required to repair leaking Safety Relief Valves.
1 2
3 4
F: Forced Reason:
Method:
Draf t IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEFE Standard 803A-1983 E-Operator Training & License Examination P-Administrative G-Operational Error (Explain)
H-Other (Explain)
..