Intervenor San Luis Obispo Mothers for Peace Motion for Leave to File Addl Discovery Re Okonite Cables W/Bonded Jackets.* San Luis Obispo Mothers for Peace Moves to File Maint & Surveillance Interrogatories.W/Certificate of Svc
ML20035E021
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/02/1993
From: Culver N
SAN LUIS OBISPO MOTHERS FOR PEACE
To:
Atomic Safety and Licensing Board Panel
References
CON-#293-13854 92-669-03-OLA-2, 92-669-3-OLA-2, IEIN-92-081, IEIN-92-81, OLA-2, NUDOCS 9304140187
Download: ML20035E021 (3)


Text

_

/

tr L. '

. M rx UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

'93 MT -7 P 4 :59 ATOMIC SAFETY AND LICENSING BOARD m

.w In the matter of

. ucF E um ? ~ g

'N Pacific Gas and Electric Company Docket Nos.iSOL275-OLA-2 Diablo Congon Nuclear Power Plant 50-323-OLA-2 Units 1 and 2 ASLBP No. 92-659-03-OLA-2 j

Focility Operating Licenses No. DPR-BO ond DPR-82 April 2, 1993 Intervenor Son Luis Obispo Mothers for Peace Motion for Leave to File Additionci Discovery Re:

Okonite Cables with Bonded Jockets The deadline for discovery requests in this cose was March 8,

1993, but the Licensing Board noted that it would entertain additianol discovery for good cause shown.

Memorandum and Order CDiscovery and Heoring Schedules 3CFebruary 9, 19933 at 3 and 4.

Son Luis Obispo Mothers for Peace

("SLOMFF"3 hereby moves to file additional maintenance and surveillance interrogatories.

SLOMFP hos good cause on the basis of recently received l

internal NRC documents.

These documents demonstrate that Pacific Gas and Electric Company ("PG&E"] is experiencing some maintenance problems at Diablo Canyon Nuclear Power Plant C"DCNPP"] involving the degrodotion of l

Okonite cables and possibly other cables with bonded jockets.

On March 25, 1993, Robert Pollard, o nuclear engineer at the Union of Concerned Scientists, forwarded to SLOMFP c set of internal NRC documents that he had received anonymously.

SLOMFP received the following documents:

i

1. NRC Memorandum for Commissioners Rogers, Curtiss, Remick and de Planque from James Toylor.

The subject was " Failures of Okonite Electrical Cables with Bonded Hypolon Jocket During Tests Performed by Sandia National Laboratories CDecember 10, 1992).

The memorondum notified the Commission 9304140187 930402 PDR ADOCK 05000275 gD)

C PDR

_~

^ /3 YS

.o

.t L

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

'93 ArR -7 P 4 :59 ATOMIC SAFETY AND LICENSING BOARD In the matter of

. a Pocific Gas and Electric Company Docket Nos.:SO-275-OLA-2 Diablo Congon Nuclear Power Plant 50-323-OLA-2 Units 1 and 2 ASLBP No. 92-ESS-03-OLA-2 Focility Operating Licenses No. DPR-80 and DPR-82 April 2, 1993 Intervenor Son Luis Obispo Mothers for Peace Motion for Leave to File Additianol Discovery Re:

Okonite Cables with Bonded Jockets The deadline for discovery requests in this cose was March 8,

1993, but the Licensing Board noted that it would entertain additional disccvery l

for good cause shown.

Memorandum and Order CDiscovery and Hearing Schedules][Februr.ry 9, 19933 at 3 and 4.

So-Luis Obispo Mothers for Peace l

C"SLOMFF"] hereby moves to file odditional maintenance and surveillance i

interrogatories.

SLOMFP hos good cause on the basis of recently received internal NRC documents.

These documents demonstrate that Pacific Gos and Electric Company C"PG&E"] is experiencing some maintenance problems at Diablo Congon Nuclear Power Plant C"DCNPP"] involving the degrodotion of Okonite cables and possibly other cobles with bonded jockets.

On March 25, 1993, Robert Pollord, o nuclear engineer at the Union of Concerned Scientists, forwarded to SLOMFP o set of internal NRC documents that he had received anonymously.

SLOMFP received the following documents:

l l

1. NRC Memorandum for Commissioners Rogers, Curtiss, Remick and de Planque from James Taylor.

The subject was "Fo11ures of Okonite Electrical Cables with Bonded Hypolon Jocket During Tests Performed by Sandia National Laboratories CDecember 10, 1992].

The memorandum notified the Commission 9304140187 930402 PDR ADOCK 05000275 s gg)

C PDR

-Q

4 i

of the potential deficiency in the environmental qualification of electrical cables with bonded jockets.

It reviewed test results and identified the variety of cables experiencing failures.

Also enclosed is a "Tosk Action Plan Outline for Bonded-Jocket Cables" CDecember 29, 1992).

2. NRC Information Notice 92-81:

Potential Deficiency of Electrical Cables with Bonded Hypolon Jockets CDecember 11, 1992).

All holders of operating licenses or construction permits for nuclear power reactors were clerted to the qualification test results which indicate that Okonite cable with bonded Hypolon jockets may be susceptible to failure.

Additianolly, other banded-jocket cables may be susceptible to the some type of failures.

3. Letter to William Rosin of NUMARC from William Russell, Office of Nuclear Reactor Regulation CDecember 22, 1992).

The NRC notifies NUMARC of i

l l

the deficiency in the environmental qualification of electrical cables with

{

banded jockets and inquires about their interest in being the focal point for industry in resolving this issue.

It notes that "much of the Sandio test dato that are the basis for the IN and the NRC concerns have not yet been published."

4. NRC Memorondum for Steven Vorgo, Jack Roe, William Trovers from Ashok Thodoni Call from NRR) on the subject of "Stoff Actions for the Resolution i

of a Potentici Deficiency in the Environmental Qualification of Bcnded-Jocket Cobles" CJonuary 27, 19933.

This memorondum informs the recipients j

l of recent developments regarding failures of Okonite and other bonded-i jocket electrical cables and odvises them that their assistance in formulating the Generic Letter may be required, i

I e

,,w

5. Region U Report: Circulating Water Pump Power Cable Degradotion - Update l

to Event Report Number 25029, MR Number 5-93-0010 CFebruary 17, 1993].

200 l

l Feet of the total 440 feet of cable showed signs of insulator and ground conductor degradotion.

The vender COkonite] indicates that the degradotion j

seen at DCNPP "is unprecedented and has not been seen by the industry previously."

The discovery of problems with the Okonite and other cables mentioned l

l in PG&E Onsite Safety Review Group C"OSRG"] meeting notes (November 1992 Monthly ReportJCottoched in separate document], relates to the adequacy of PG&E's maintenance and surveillance program.

Therefore, odditional discovery is needed to find out how their maintenance and surveillance l

l programs relate to the discovery of this cable and other cables that_moy be i

degraded.

i l

i Respectfully submitted, N

b Noney C er, President Son Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 1

1

t

'5.

l j

'93 "o -7 P A 55 Certificate of Service I hereby certify that copies cf the foregoing Intervenor Son Luis Obispo Mothers for Peace C"SLOMFF"3 Motion for Leave to File Additionci Discovery l

Re: Okonite Cables with Bonded Jockets; Intervenor SLOMFP Supplemental Interrogatories Related to SLOMFP First Set of Written Interrogatories and Requests for the Production of Documents to Pacific Gas and Electric Company; Intervenor SLOMFP Supplemental Interrogatories Related to SLOMFP First Set of Written Interrogatories and Requests for the Production of Documents to the NRC Staff Re: Okonite Cabl2s with Bonded Jockets; Letter dated 2/2/93 and ottochments from SLOMFP to the Atomic Sofety and Licensing Board have been served upon the following persons by U.S.

mail, first class.

l Office of Commission Appellote Administrative Judge Adjudication Charles Bechhoefer, Chairman U.S.

Nuclear Regulatory Commission Atomic Sofety and Licensing Board Washington, DC 20555 U.S.

Nuclear Regulatory Commission Washington, DC 20555 Administrative Judge Jerry Kline Administrative Judge Atomic Safety and Licensing Board Frederick J.

Shon l

U.S.

Nuclear Regulatory Commission Atomic Sofety and Licensing Board Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 Edward O'Neill Ann P. Hodgdon, Esq.

Peter Arth, Jr.

Office of the General Counsel Trumon Burns U.S.

Nuclear Regulatory Commission Robert Kinosion Ucshington, DC 20555 Peter G.

Fairchild, Esq.

California Public Utilities Commission Joseph B. Knotts, Jr.,

Esq.

505 Uon Ness Avenue Winston & Strcun Son Francisco, CA S9102 1900 L Street, N.W.

Washington, DC 20005 Adjudicatory File Secretary of the Commission U.S.

Nuclear Regulatory Commission Docketing and Service Bronch Washington, DC 20555 U.S.

Nuclear Regulatory Commission Washington, DC 20555 Robert R. Wellington, Esq.

Diablo Canyon Independent Sofety Committee 857 Coss Street, Suite D Monterey, CA S3S90 Christocher Warner, Esq.

Richard Locke, Esq.

Pacific Gas and Electric Co.

77 Beale Street Son Francisco, CA 99105 Cated April 2.

1993, Son Luis Obispo County, CA Jill ZomEk

})

o