Forwards Insp Rept 50-461/93-05 on Stated Date.No Violations Noted.Requests That Licensee Provide within 30 Days Brief Description of Plans for Upgrading Labeling for EOP Related Components
ML20035E007
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/09/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20035E012 List:
References
NUDOCS 9304140176
Download: ML20035E007 (2)


See also: IR 05000461/1993005

Text

-.

-.

. .

-

.

-

. .--

-.

.

!

I

.

..

\\

-

!

.

,

'

APR - S 1933

'

a

Docket No. 50-461

Illinois Power Company

ATTN:

J. S. Perry

i

Senior Vice President

!

Clinton Power Station

Mail Code V-275

l

P. O. Box 678

l

Clinton, IL 61727

!

Dear Mr. Perry:

SUBJECT: EMERGENCY OPERATING PROCEDURES FOLLOWUP INSPECTION,

!

NRC INSPECTION REPORT NO. 50-461/93005{DRS)

(

!

This refers to the inspection conducted by Messrs. R. Langstaff and

!

l

R. Doornbos of this office and J. DeBor of Science and Engineering Associates

l

l

on March 15 through March 24, 1993. The inspection included a review of

l

i

authorized activities for your Clinton Power Station. At the conclusion of

1

l

the inspection the findings were discussed with those members of your staff

j

identified in the enclosed report.

'

Areas examined during the inspection are identified in the report.

The

,

inspection focused on your emergency operating procedures (EOPs) and your

program for maintaining their quality.

,

No violations of NRC requirements were identified during the course of this

l

inspection. The quality of your E0P program has improved, especially in the

l

area of E0P support procedures.

The plant labeling for your Clinton facility was adequate. Although

l

components were labeled, the labels were difficult to read. Consequently,

t

'

delays in performing E0P related tasks could result from difficulty in

identifying components. We understand that an upgrade to plant labeling is

i

planned. We request that within 30 days of this letter you provide us with a

l

brief description of your plans, your schedule for upgrading the labeling for

'

l

E0P related components, and a description of any priorities which have been

l

established for upgrading plant labeling.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosed inspection report, and your response to this letter

will be placed in the NRC Public Document Room.

140061

}'

9304140176 930409

PDR

ADOCK 05000461

/1 ({

l

G

PDR

!

_

,

,.

_

-

. ... . .

. -.

_

.

..

.

Illinois Power Company

2

AER * 6 1333

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

oridnsT Signed by Mark L lanc

Mark A. Ring, Chief

Operations Branch

Enclosure:

Inspection Report

.

No. 50-461/93005(DRS)

cc w/ enclosure:

J. Cook, Vice President, Manager

Clinton Power Station

F. Spangenberg, III, Manager -

Licensing and Safety

OC/LFDCB

i

Resident Inspector, RIII

D. V. Pickett, LPM, NRR

J. McCaffrey, Chief, Public

Utilities Division

S. Zabel, Esquire, Schiff, Hardin,

& Waite

K. K. Berry, Licensing Services Manager

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

Nuclear Safety

Robert Newmann, Office of Public

Counsel, State of Illinois Center

Perry SRI

State Liaison Officer

Chairman, Illinois Commerce

Commission

J. Arildsen, HHFB, NRR

J. DeBor (SEA)

bcc:

PUBLIC - IE01

N

RI,IJ

RII f

RII j

RJ e

RII]

Kdx

/

B.l Burgess /~f

f)WL

M

ffague

lting

Langstaff/cg

Doo nbos

04/g/93

04/ F/93

04/g/93

04/ 5?j/93

04/j/93