ML20035D612

From kanterella
Jump to navigation Jump to search
Forwards Sequoyah Nuclear Plant Unit 2 Cycle 5 Insp,Apr 1992,SG Tubing Insp Results. Five Tubes Plugged in SG 1,19 Tubes Plugged in SG 2,12 Tubes Plugged in SG 3 & 2 Tubes Plugged in SG 4
ML20035D612
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/31/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20035D613 List:
References
NUDOCS 9304130325
Download: ML20035D612 (2)


Text

_,

0 A

Tennessee Valiev AJthonty. Post Offce Box 2000, Soddy-Daisy. Tennessoa 37379 2000 Robert A.Fenech vice FSemdent snauoyan Nuciear Plant March 31, 1993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk

.f Washington, D.C. 20555 l

t i

Gentlemen:

?

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

l SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 - INSERVICE INSPECTION (ISI) 0F f

UNIT 2 STEAM GENERATOR (S/G) TUBES (UNIT 2 CYCLE 5 REFUELING OUTAGE)

{

As required by SQN Technical Specification (TS) Surveillance Requirement (SR) 4.4.5.5.b, enclosed are the results of the S/G tube ISI completed

.i for Unit.2 during the Unit 2 Cycle 5 refueling outage. The subject ISI i

was completed on April 19, 1992.

l The initial inspection samples in all four S/Gs were classified as Category C-2 (categories are defined in SR 4.4.5.2).

In S/Gs 1 and 4, the first expansion sample was classified as Category C-2.

In S/Gs 2 and

+

3, the first expansion sample was classified as Category C-2, while the second expansion sample (all remaining tubes) was classified as

'l Category C-1.

Table 6 in the enclosed report summarizes service-induced vall-lors indications, sample classification, and S/G inspection scope l

for the SQN Unit 2 Cycle 5 ISI.

TVA performed eddy current examinations such that the following total i

percentages of tubes were examined with bobbin coil probes full length, rotating pancake coil (RPC) at the hot-leg top-of-tubesheet (HTS), and RPC at the first hot-leg support plate (H01):

i Full Length SLG

__Embhin_.___

HTS RPC H01 RPC lop { Q l 51 percent 54 percent 9 percent 2

57 percent 100 percent 9 percent 3

42 percent 100 percent 6 percent 4

39 percent 42 percent 6 percent Vl 93o41g[

G

4

.l U.S. Nuclear Regulatory Commission

]

Page 2 l

March 31.-1993 All Row 2 tube U-bends in each S/G were examined by RPC-(Row 1 tubes have.

~

been preventively plugged).

I As a result of these examinations, five tubes were plugged In S/G 1, nineteen tubes were plugged in S/G 2, twelve tubes in S/G 3, and two' tubes in S/G 4.

No commitments are contained in this submittal. Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

j Sincerely, d

Wb Robert A. Fenech Enclosure

.i cc (Enclosure).

Mr. D. E. LaBarge, Project Manager U.S. Nuc. lear Regulatory Commission One White Flint, North 11555 Rockville Pike

.Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 r

U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-0199 P

1 l

I t

-