ML20035D609

From kanterella
Jump to navigation Jump to search
Provides Info Re Number of Tubes Plugged in Each Sg,Per TS 4.4.5.5 Re Completion of ISI of SG Tubes
ML20035D609
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/07/1993
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-93-0072, WO-93-72, NUDOCS 9304130322
Download: ML20035D609 (1)


Text

.

J Q R P W+ IT / 7

%ym[,h-Qu m

'BP IQ sh

~q a

w g M

h.

' NUCLEAR OPERATING CORPORATION April 7, 1993 OMo L Maynard w e nn.sdem Pan: om a:" '

WO 93-0072 U.

S.

fiuclear Eegulatory Commission AT.N:

Document Control Desk Mail Station PI-137 Washington, D.

C.

20555

Subject:

Pocket No. 50-4B2:

Special Report 93-002 - Steam Generator Tube Plugging Report Gentlemen:

This letter provides information regarding the nurber of tubes plugged in each steam generator as required by Wolf Creek Generating Station Technical Specifications (T/S).

Technical Specification 4.4.5.5 states:

..within 15 days f ol l owi ng the completion of each inservice inspection of steam generator tubes, the nunber of tubes plugged in each steam generator shall be reported to the Commission.."

The fitth steam generator (S/G) inservice inspection which began March 23, 1993, was completed for S/G "B"

on March 29, 1993.

This inservice inspection included removal of all Inconel 600 mechanical tube plugs and their replacement with Inconel 690 mechanical tube plugs.

This was done to three plugs during this inspection and completes the replacement of Inconel 600 mechanical tube plugs as required by NBC Bulletin No.

89-01,

" Failure of Westinghouse Steam Generator Tube Mechanical Plugs," for S/G "B".

Fi ve tubes were mechanically plugged because of indications found during the inservice inspection and four " bare holes" were plugged.

" Bare holes" are hcles in the S/G tubesheet which were capped internally by the manufacturer prior to delivery and installation but are not tested during regular inservice i nspe ct i ons.

These bare holes are plugged to preclude the possibility of leakage from hole locations which are not tested as part of the inservice inspection program.

The ccmplete results cf the steam generator inservice inspection shall be reported as required S 4.4.5.5 by March 28, 1994.

If you have any ques.

- concerning this matter, please centact me at (316) 364-8831 e >: t e n s i o n 4450 or Mr. Kevin J.

Moles at extensicn 4565.

Very truly yours,

/

if l'j,' l /),/( 'M

//

f/,. L U e

Ctto L.

Maynard '

Vice President Flant Operations OLM/jad cc:

W.

D.

Johnson (NRC)

J.

L.

Milhoan (NPC)

G A.

Pick ( N EC )

W.

D.

Packley (NPC) t'/

l

.i

, 3m

-no-m m. m e. u m ss aan rr ~

'I l b :

s.

9304130322 930407

}. b, F PDR ADOCK 05000482

'" " ""

  • 5 "

G PDR