Responds to NRC Re Violations Noted in Insp Rept 70-1257/93-01.Corrective Actions:Health Physics & Radiological Safety Procedure Entitled Operation & QC for Tennelec Surface Barrier Counters, Addresses Efficiency
ML20035D230
Person / Time
Site: Framatome ANP Richland
Issue date: 04/08/1993
From: Edgar J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9304120302
Download: ML20035D230 (2)


Text

_..

i SIEMENS April 8,1993 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

i i

Re: Letter, J. W. Reese to B. N. Femreite, "NRC Inspection Report No. 70-1257/93-01," dated March 10,1993.

Enclosed is Siemens P3wer Corporation's reply to the Notice of Violation contained in j

referenced letter. If you have any questions regarding this reply, please contact me at 509-375-8663.

Very truly yours,

. 6.

ames R Edgar Staff Engineer, Ucensing JBE:pm cc:

John B. Martin Region V Administrator J20073 9304120302 9304M PDR ADOCK 07001257 PDR C

l Siemens Power Corporation

,[ j Nuclear Dnns:on Engneenng and Manufactonna FacMy

}

2101 Horn Rapds Road, PO Box 130 Rchland. WA 99352 0130 Tel (509) 375 8100 Far (509) 375-8402

Reply to Notice of Violation dated March 10,1993 Violation A Section 2.5, " Instrument and Equipment," Chapter 2 " Radiological Protection Standards," of the Safety Manual EMF-30, states in part:

"All radiation detection and dose rate instruments shall be inspected and calibrated per R gulatory Guide 8.24 at least semiannually."

Contrary to the above, all surface barrier detectors (5) in service at the time of the inspection had not been calibrated at least semiannually. The detectors, used by plant radiological safety for counJng routine and special air samples, had been in service since August 22, 1985.

i This is a severity level IV violation (Supplement IV).

SNP Repiv Reason for Violation - The violation was the result of an assumption that the daily source checks, in conjunction with chi-square testing of those detectors which fail the daily checks, constituted an acceptable calibration procedure.

Immediate Corrective Steps - An energy spectrum calibration was performed on February 16, 1992 for each of the surface barrier detectors.

Corrective Steps to Avoid Further Violations - Three procedures have been written regarding the calibration of the Tennelec surface barriers. Two Maintenance Instrument procedures, Calibration Procedures No.155 Rev. 2, effective March 9,1993 and No.156 Rev.1 effective February 22,1993 address energy calibration for the UO Building detectors and SF Building 2

detectors, respectively. Health Physics and Radiological Safety Procedure EMF-1507,2.2 entitled " Operation and Quality Control For Tennelec Surface Barrier Counters", effective May 1,1993, addresses Chi-square statistics, efficiency, and control charting.

Date to be in Full Compliance - May 1,1993.