Forwards First Quarter FY93 Update of Generic Issue Mgt Control Sys,Reflecting Following of Major Activities That Occurred During Reporting Period
ML20035D206
Person / Time
Issue date: 03/30/1993
From: Beckjord E
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20035D207 List:
References
REF-GTECI-149, REF-GTECI-MI, REF-GTECI-NI, REF-GTECI-SC, TASK-149, TASK-OR NUDOCS 9304120255
Download: ML20035D206 (2)


Text

.

e

/p* "cuq%

0'

' 'e UNITED STATES i

i NUCLEAR REGULATORY COMMISSION WASHINGTON. D C. 2D586 I

o

\\

'+,

I t

MAR 3 01933 MEMORANDUM FOR:

James M. Taylor Executive Diretter for Operations FROM:

Eric S. Beckjerd. Director Office of Nuclear Regulatory Research

SUBJECT:

GENERIC ISSUE MANAGEMENT CONTROL SYSTEM - FIRST l

QUARTER FY-93 UPDATE Enclosed is the First Quarter FY-93 update of the Generic' Issue Management i

Control System (GIMCS) for your information. This report reflects the following major activities that occurred during the reporting period.

(I)

One GSI was prioritized:

149 (LOW)

Adequacy of Fire Barriers (2)

Two new issues were identified.

Twenty-five GSIs remain to be resolved including one that is scheduled for resolution in the Second Quarter of FY-93. Of the 13 issues that remain to be prioritized, 5 are scheduled for completion during the Second Quarter of u

FY-93.

I will continue to keep you informed of progress in resolving these 8

issues as well as any major problems that might surface during the course of their resolution.

j l

c-7

_ ).

I Eric S. Beckjord, Di ector Office of Nuclear ulatory Research

Enclosure:

GIMCS First Quarter FY-93 Update l

06005S 9304120255 930330 fi PDR GTECI GNI!49

/V. Y; PDR I

v

i f

cc: w/ enclosure l

NRR RES C. Ader, NLS-324 G. Barber, 12E4 R. Baer, NLS-217A S. Bajwa, 11H22 R. Bosnak, NLS-007 R. Borchardt, 13E4

+

F. Cherny, NLS-217A P. Cota, 12D20 F. Coffman, NLN-316A F. Gillespie, 12G18 T. King, NLS-007 W. Long, 13H15

[

i K. Kniel, NLS-314 T. Murley, 12G18 G. Marino, NLS-007 J. Richardson, BH3 i

G. Mazetis, NLS-314 A. Gautam, 9Al W. Minners, NLS-007 T. Boyce, 11H3 J. Murphy, NLS-372 J. Wilson, llH3 A. Murphy, NLS-302 C. Miller, 11H3 P. Norian, NLS-314 M. Malloy, llH3 J. Persensky, NLN-316 NMSS J. Heltemes, NLS-007 T. Ryan, NLN-316 R. Bernero, 6A4 C. Serpan, NLS-217C R. Bangart, SE4 l

L. Shao, NLS-007 AEOD B. Sheron, NLS-007 L. Shotkin, NLN-353 E. Jordan, 3302 e

T. Speis, NLS-007 H. Bailey, 5211 i

R. Kornasiewicz, NLS-260 T. Novak, 3701 l

L. Soffer, NLS-324 C. Trottier, NLS-139 P. Kadambi, NLS-302 REGIONS H. VanderMolen, NLS-372 T. Martin, Region I M. Cunningham, NLS-372 S. Ebneter, Region II R. Emrit, NLS-169 A. Davis, Region III OTHERS J. Milhoan, Region IV M. Taylor, EDO,17G21 J. Martin, Region V D. Adams, ACRS, P-315 S. Duraiswamy, ACRS (6), P-315 J. Kopeck, 2G5 E. Heumann, 10204 H. Schecter, IP, 3H5 W. Usilton, P-612 PDR DCS i

J 1

1 w

a m

-~e-Am-L A

A A

l t

u ENCLOSURE E

f i

GENERIC ISSUE MANAGEMENT CONTROL SYSTEM FIRST QUARTER FY-93 UPDATE l

I t

i i

l l

OFFICE OF NUCLEAR REGULATORY RESEARCH FEBRUARY 1993 i

W 3

i 8

4 k

b o

J I

{

,d f

1 i

I l

.i 1,

I L

ii TABLE OF CONTENTS (a)

Generic Issue Management Control System (1)

Description (2)

Abbreviations j

I (b)

Table I -

Generic Safety Issues Scheduled for Resolution, I

Issues Resolved, and Issues Integrated (c)

Table 1A - Summary of Generic Safety Issues Scheduled for Resolution, Issues Resolved, and Issues Integrated l

l l

(d)

Table 2 -

Number of Generic Safety Issues Resolved and Scheduled for Resolution (Through 1st Quarter FY-93)

(e)

Table 3 -

Generic Safety Issues Resolved by Fiscal Year (f)

Table 4 -

Generic Safety Issues Scheduled for Resolution (by Fiscal Year)

(g)

Table AA - Generic Safety Issues Scheduled for Resolution (by Priority)

(h)

Table 5 -

Number of Generic Issues Prioritized from FY-83 l

through the First Quarter of FY-93 (i)

Table 6 -

Generic Issues Prioritized as of Ist Quarter FY-93 (j)

Table 7 -

Generic Issues to be Pricritized (k)

Table 8 -

Generic Issues to be Reprioritized I

(1)

Table 9 -

Regulatory Impact Issues Scheduled for Resolution l

l (m)

Table 10 - Licensing Issues Scheduled for Resolution (n)

Work Scope & Schedules for each Approved Generic Issue i

Ol