Advises of Change in Commitment Associated W/Exercise Weaknesses Noted in Insp Rept 50-482/91-19.Field Team Monitoring Guidelines in EPP 01-0.1, Wolf Creek Generating Station Organization Enhanced to Provide More Detail
ML20035D109
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/08/1993
From: Hagan R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-93-0095, NA-93-95, NUDOCS 9304120150
Download: ML20035D109 (2)


Text

.

o WeLF CREEK 1

~

NUCLEAR OPERATING CORPORATION

)

Robert C. Hagan A M18 1993 Nk93-0095 vce Prewoent Nuclear Anurance U.

S. Nuclear Regulatory Commission i

ATTH:

Document Control Desk Mail Station P1-137 i

Washington, D.

C.

20555 i

4 i

1

Reference:

1) Letter dated September 19, 1991 from A.

Bill. Beach, NRC, to B.

D. Withers, WCNOC I

2) Letter WM 91-0145 dated October 30, 1991 from B.

D. Withers, WCNOC, to NRC I

Subject:

Docket No. 50-482:

Change in Commitment Associated to Exercise Weakness 482/9119-04 i

Gentlemen:

l This letter provides notification of a change in commitment made by Wolf treek N ucl ea r Operating Corporation (WCNOC).

This corimitment was made in response to Exercise Weakness 482/9119-04 documented in Reference 1.

1 1

Exercise Weakness 482/9119-04 concerned examples of poor coordination and control cf field monitoring teams.

This weakness was the result of only one l

of four field teams making contact with - the plume during a 2-hour period following the onset of-the release.

This situation, compounded by problems 4

with subsequent control of the team during sampling efforts, resulted in high 1

exposures to the team.

Part of the weakness was also attributed to a lack of i

equipment, in particular self contained breathing apparatus (SCBA).

1 In the response provided to the weakness (Reference 2),

the cause of the weakness was attributed to a lack of procedural guidance.

The associated a

procedures were revised to provide additional guidance.

Additionally, WCNOC f

committed to require field monitoring teams to take ' SCBAs with them when deployed.

t A re-evaluation of this response has determined that the requirement to take SCBAs when deployed is unnecessary and therefore has been deleted.

However,

'i to minimize personnel exposure, the field team monitoring guidelines in procedures, EPP 01-1.1, "WCGS Organization," EPP 01-1.2,

" Emergency Operation Facility Emergency Organization," and EPP 01-8.2, "Offsite Radiological Monitoring," are being further enhanced to provide for more detailed guidance i

on definition, timing and location of plume monitoring.

These enhancements j

also include exposure considerations, exposure limits and guidelines, environmental precautions (such as travel detours due to the reservoir and 1

cooling lake), and precautions on the need for and coordination of SCBA use i

when conditions warrant them.

Procedure EPP 01-8.1, "Onsite Radiological Monitoring,"

is also being enhanced to emphasize exposure control and personnel protection.

With these procedural enhancements. the requirement to I

take SCBAs upon field monitoring team deployment will not be necessary.

g Procedure EPP 01-8.3 which was originally revi sed in response to this weakness, has been subsequently incorporated into procedures EPP 01-8.1 and g

EPP 01-8.2.

120123 t@b 4

PO Box 411/ Burkngton. KS ff>B39 / Phone (316) 364-8831

/ g DR AD CK O O

2 l'

PDR

NA 93-0095 Page 2 of 2 1

Due to the additional procedural enhancements it has been determined this does

.l i

not constitute a reduction in a commitment nor a decrease to the ef fectiveness l

of the Radiological Emergency Response Plan.

This commitment change. was discussed with Dr.

D.

B.

Spitzberg of Region IV, NRC.

If you have any questions concerning this change in commitment, please' contact me at (316) 364-8831 extension 4553 or Mr. Kevin J. Moles at extension 4565.

l 4

Very truly yours, i

b f

h f(

,/ /

W

./

C.

Hagan d'

jRobert Vice President Nuclear Assurance RCH/jad cc: