Text
'
.
i
l
.
APR 011993
l
Docket No. 50 333
License No. DPR-59
l
Mr. Harry P. Salmon, Jr.
Resident Manager
!
New York Power Authority
James A. FitzPatrick Power Plant
Post Office Box 41
l
Lycoming, New York 13093
i
SUBJECT:
(NRC REGION I INSPECTION REPORT NO. 50-333/93-04)
This refers to the inspection conducted by Messrs. W. Cook and J. Tappert of this office
from January 24,1993 to March 6,1993. The inspection included a review of activities
l
authorized for your James A. FitzPatrick facility. At the conclusion of the inspection, the
findings were discussed with you and members of your staff.
s y
l
Areas examined during the inspection are identified in the report. Within these areas, the
j
inspection consisted of observation of activities, interviews with personnel, and document
reviews. The purpose of the inspection was to determine whether activities authorized by the
l
license were conducted safely and in accordance with NRC requirements.
Based on the results of this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation (Notice). During this
i
inspection period, we reviewed the actions and circumstances surrounding the operator
initiated scram of February 25,1993. While operator performance was generally acceptable,
the reactor mode switch was found out of the shutdown position after two procedurally
required verifications failed to identify it. We also noted that your post-trip review did not
identify this procedural noncompliance.
You are required to respond to this letter and
l
should follow the instructions specified in the enclosed Notice when preparing your response.
You are required to respond to this letter and should follow the instructions specified in the
l
enclosed Notice when preparing your response. In your response, you should document the
~
specific actions taken and any additional actions you plan to prevent recurrence.
Additionally, we ask that you address those measures which you plan to take to strengthen
your post-trip review process. After reviewing your response to this Notice, including your
proposed corrective actions and the results of future inspections, the NRC will determine
whether further NRC enforcement action is necessary to ensure compliance with NRC
regulatory requirements.
9304120077 930401
l
gpICIAL RECORD COPY
l
gDR
ADOCK G500
3
I
!
I
y
--
_
_
'
.
~
APR 011993
Mr. IIarry P. Salmon
2
-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
l
The responses directed by this letter and the enclosed Notice are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, Pub. L. No. 96.511.
l
Sincerely,
l
ORIGINAL SIGNED BY:
l
Curtis J. Cowgill, Chief
'
Projects Branch No.1
Division of Reactor Projects
Enclosures:
1. Appendix A, Notice of Violation
'
2. NRC Region I Inspection Report Number 50-333/93-04
'
~
cc w/ encl:
J. Brons, President
R. Beedle, Executive Vice President
J. Gray, Director, Nuclear Licensing - BWR
G. Goldstein, Assistant General Counsel
Supervisor, Town of Scriba
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
4
'
Director, Power Division, Department of Public Service, State of New York
i
Public Document Room (PDR)
l
Local Public Document Room (LPDR)
{
Nuclear Safety Information Center (NSIC)
i
NRC Resident Inspector
l
State of New York, SLO Designee
K. Abraham, PAO-RI (2)
OFFICIAL RECORD COPY
a:IR9304
-.
-
-.
.
-__
..- .
--
-
. ._..
,
1
.
. . .'
.
'
APR 011993
'
i
Mr. Harry P. Salmon
3
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
C. Cowgill, DRP
R. Urban, DRP
P. Eselgroth, DRP
G. Tracy, SRI-IP3
V. McCree, OEDO
i
B. McCabe, NRR
R. Capra, NRR
l
bec w/ Report Cover Letter and Executive Summary only
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
W. Lanning, DRS
J. Durr, DRS
L. Bettenhausen, DRS
S. Shankman, DRSS
R. Cooper, DRSS
J. Joyner, DRSS
l
l 3 ff 0
WCook\\
PEse roth
11
2
{ll163
'3/2995
7
OFFICIAI, RECORD COPY
a:IR9304
,
,w
- - - .
-*p.--
- - -
y-
w
.
%m-
-e
w
w