Forwards Insp Rept 50-333/93-04 on 930124-0306 & Notice of Violation
ML20035D049
Person / Time
Site: FitzPatrick 
Issue date: 04/01/1993
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harry Salmon
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20035D050 List:
References
NUDOCS 9304120077
Download: ML20035D049 (3)


See also: IR 05000333/1993004

Text

'

.

i

l

.

APR 011993

l

Docket No. 50 333

License No. DPR-59

l

Mr. Harry P. Salmon, Jr.

Resident Manager

!

New York Power Authority

James A. FitzPatrick Power Plant

Post Office Box 41

l

Lycoming, New York 13093

i

SUBJECT:

NOTICE OF VIOLATION

(NRC REGION I INSPECTION REPORT NO. 50-333/93-04)

This refers to the inspection conducted by Messrs. W. Cook and J. Tappert of this office

from January 24,1993 to March 6,1993. The inspection included a review of activities

l

authorized for your James A. FitzPatrick facility. At the conclusion of the inspection, the

findings were discussed with you and members of your staff.

s y

l

Areas examined during the inspection are identified in the report. Within these areas, the

j

inspection consisted of observation of activities, interviews with personnel, and document

reviews. The purpose of the inspection was to determine whether activities authorized by the

l

license were conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice of Violation (Notice). During this

i

inspection period, we reviewed the actions and circumstances surrounding the operator

initiated scram of February 25,1993. While operator performance was generally acceptable,

the reactor mode switch was found out of the shutdown position after two procedurally

required verifications failed to identify it. We also noted that your post-trip review did not

identify this procedural noncompliance.

You are required to respond to this letter and

l

should follow the instructions specified in the enclosed Notice when preparing your response.

You are required to respond to this letter and should follow the instructions specified in the

l

enclosed Notice when preparing your response. In your response, you should document the

~

specific actions taken and any additional actions you plan to prevent recurrence.

Additionally, we ask that you address those measures which you plan to take to strengthen

your post-trip review process. After reviewing your response to this Notice, including your

proposed corrective actions and the results of future inspections, the NRC will determine

whether further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

9304120077 930401

l

gpICIAL RECORD COPY

l

gDR

ADOCK G500

3

I

!

I

y

--

_

_

'

.

~

APR 011993

Mr. IIarry P. Salmon

2

-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

l

The responses directed by this letter and the enclosed Notice are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, Pub. L. No. 96.511.

l

Sincerely,

l

ORIGINAL SIGNED BY:

l

Curtis J. Cowgill, Chief

'

Projects Branch No.1

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

'

2. NRC Region I Inspection Report Number 50-333/93-04

'

~

cc w/ encl:

J. Brons, President

R. Beedle, Executive Vice President

J. Gray, Director, Nuclear Licensing - BWR

G. Goldstein, Assistant General Counsel

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

4

'

Director, Power Division, Department of Public Service, State of New York

i

Public Document Room (PDR)

l

Local Public Document Room (LPDR)

{

Nuclear Safety Information Center (NSIC)

i

NRC Resident Inspector

l

State of New York, SLO Designee

K. Abraham, PAO-RI (2)

OFFICIAL RECORD COPY

a:IR9304

-.

-

-.

.

-__

..- .

--

-

. ._..

,

1

.

. . .'

.

'

APR 011993

'

i

Mr. Harry P. Salmon

3

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

C. Cowgill, DRP

R. Urban, DRP

P. Eselgroth, DRP

G. Tracy, SRI-IP3

V. McCree, OEDO

i

B. McCabe, NRR

R. Capra, NRR

l

bec w/ Report Cover Letter and Executive Summary only

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

J. Durr, DRS

L. Bettenhausen, DRS

S. Shankman, DRSS

R. Cooper, DRSS

J. Joyner, DRSS

l

l 3 ff 0

WCook\\

PEse roth

CC

11

2

{ll163

'3/2995

7

OFFICIAI, RECORD COPY

a:IR9304

,

,w

- - - .

-*p.--

- - -

y-

w

.

%m-

-e

w

w