Text
.
f Y W) L.GHfBOBEEEEtEEM w-m-
e
()d{b.j ttmhi POS/S/N 3[Id3 y_
A p--
- i
)
a g.
April 2, 1993 Page 1 of 2 Document Control Desk
)
U.S.
Nuclear Regulatory Commission Washington, DC 20555
Subject:
Closure of 10 CFR 21 Report l
l Consolidated Power Supply (CPS) reported a deficiency by telephone on October 20, 1992, and followed with the written report dated November 19, 1992.
The deficiency was noted as the inability to trace a 24" SA182 F316L, 150# RF blind flange, heat #460066, to the starting piece of material as required for compliance to ASME Code upgrade requirements. The material was manufactured by Texas Metal l
Works, Houston, TX.
The flange was supplied by CPS to Connex Pipe Systems, who in turn supplied the flange to Public Service Electric
& Gas.
After completing an internal investigation relative to the initial concern, CPS notified the applicable customers that were determined to be affected.
All such customers were notified in writing no later than November 19, 1992.
Several conversations have taken place in attempting to determine the status of the indeterminate materials. Out of the five customers originally notified, only two j
have responded in a manner to allow disposition of the material supplied and closure relative to their facilities.
These two are Connex Pipe Systems, who had three orders affected, and TU Electric.
The other three licensees have apparently not completed their evaluations at this time, and have provided no written l
response to CPS.
These three customers have conveyed by telephone that in process activities had been initiated.
i The ASME performed an audit at CPS on March 29, 30 and 31, 1993, which primarily focused on CPS upgrading activities.
The activities relative to the Texas Metal Works concern that have been i
conducted by CPS as of March 29, 1993 were evaluated by the audit team.
Due to the lack of response by end users combined with the fact that CPS had not received back several pieces of the sNE indeterminate materials, it was agreed during the audit that CPS f$$
would revise all original certification documents supplied with the material.
This was performed by CPS with certified mail being
,g utilized to send the correspondence, including cover letters, to all customers noted as affected by the upgrading deficiency.
The h
CPS certification was revised to delete all references to the ASME w
0 80 0m' ',m,e w. eme, um 3sm. mos, oss.ss,s m
Mb -
gm pm w-nn
- - m a wn n
. l 1.
Consolidated w
Power Supply Letter to U.S. NRC Dated 4/2/93 Page 2 of 2 Code, including removal of the CPS ASME Quality System Certificate and expiration date.
The certification now reflects that the material was provided as commercial.
Please find enclosed a copy of the correspondence provided to the applicable customers, which includes a copy of the revised CPS certification documents.
- Also, find enclosed a copy of the CPS letter to ASME identifying what actions were taken as a result of the survey.
Once CPS receives acknowledgment from the certified mail system that all correspondence has been received, CPS will forward copics of such to ASME requesting closure of the finding.
Based on the above, CPS is closing the 10 CFR 21 report initiated on October 20, 1992.
We regret that all material has not been accounted for, however, four months should have been ample time for licensees to respond to our original request for assistance.
CPS management feels everything possible has been performed in an effort to address the original deficiency.
If there are any questions please contact the undersigned.
Sincerely,
,e' Steven W. Andrews Quality Assurance Manager Enclosura - ASME & Customer Correspondence, 22 pages cc:
H.
Kerr, President - CPS, w/o G.
Johnson, Gen. Mgr. - CPS, w/o CPS Part 21 QA File, w/o K. Welch, Mgr. QA - Connex Pipe Systems, w/o NCR 92-104, w/o US NRC Operations Center via telecopy on 4/2/93, w/o
_, _.. _ ~.
g Consolidated g
Power Eiiupply v
March 31, 1993 Page 1 of 2 1
l The American Society of Mechanical Engineers 345 East 47th Street New York, NY 10017 Attn: Mr. J. H. Karian, Secretary Subcommittee on Nuclear Accreditation
Subject:
Additional Corrective Actions and Current Status of the Open deficiency Relative to Texas Metal Works Materials
Reference:
ASME Letter Dated March 24, 1993 Reflecting Unacceptance of the Consolidated Power Supply Response Dated March 3, 1993
Dear Mr. Karian:
i Upon review of the referenced document, it is apparent that Consolidated Power Supply (CPS) has not utilized sufficient measures in order to address the open concern.
As a result, the affected customers that have not provided documentation to CPS to allow closure of the deficiency have been notified in writing of the additional measures now being implemented.
CPS has revised the certification documents originally provided i
with the indeterminate material deleting all references to qualification to the ASME Code.
This includes the deletion of the i
CPS Quality System Certificate number (515) and expiration date.
Please find enclosed copies of the revised certification, which are attached to the correspondence issued to each applicable customer.
The correspondence is being mailed today as certified mail, requiring acknowledgment by the recipient.
Once verification has been received by CPS that the letters were received by each customer, you will be notified immediately that all measures possible have been implemented by CPS and will request closure of this concern.
In addition, ASME audit now in progress combined with the above will hopefully reflect sufficient information to substantiate the fact that CPS does recognize the ASME Code upgrade requirements in their entirety.
In addition to the follow up activities for the Texas Metal Works concern, other areas are being addressed by the ASME Audit Team.
This should provide sufficient information to (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A Division of Consohdated Pve & Supply Co, inc Birmingham. AL
. - ~.. -
.'l
' Consolidated
'ap.
Power Supply CPS Letter to ASME Dated 3/31/93 Page 2 of 2 demonstrate that CPS does and will provide ASME Code materials in accordance with all applicable requirements.
If any additional information is required or additional measures need to be implemented, please contact me.
Sincerely, I
I e
Steven W. Andrews Quality Assurance Manager l
l Enclosures - CPS Letters to TVA, Martin Marietta, Duke Power, Keegan Enterprise, Connex Pipe Systems, and TU Electric cc:
H. Kerr, President - CPS G. Johnson, Gen. Mgr. - CPS CPS Part 21 File
.a
i H
Consolidated 4
Power iiupply s
1 March 31, 1993 Page 1 of 2 TU Electric Company Skyway Tower 400 N. Olive Street LB81 Dallas, TX 75201 1
Attn: Executive Vice President, Nuclear Engineering and Operations
Subject:
Status of Consolidated Power Supply 10 CFR 21 Evaluation for TU Electric Purchase Order 665-71784
Reference:
Consolidated Power Supply Letter Dated November 18, 1992 for Initial Notification of a deficiency As conveyed in the referenced correspondence your company was notified of a deviation from the requirements of NCA-3867.4 (e) of the ASME Code.
The material was supplied to the subject purchase order.
Consolidated Power Supply (CPS) has received a response from Mr.
F.
W.
Madden, Manager, Mechanical Engineering for the Comanche Peak Station dated February 11, 1993.
Based on that
}
response none of the material in question was installed in a safety l
related (or ASME Code) application.
j 4
To enable CPS to close this matter, a revised certification document is enclosed with this correspondence to replace the original document submitted with the material.
The revision deletes the reference to the ASME Code requirements, including
[
reference to the QSC/ 515.
This revised certification shall be utilized as the only certification applicable to the subject material.
By issuance and verification of your receipt of this letter, the 10 CFR 21 evaluation relative to your facility will be considered i
l closed.
Also, CPS will be notifying The American Society of Mechanical Engineers and the United States Nuclear Regulatory Commission of the status of the evaluation upon final closure of our internal paperwork, (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A Dwiston of Consolidated P:De & SuDpli Co, Inc Bnugham AL
Consolidated
, s.
-n
- '7-(
Power Supply Letter to TUE Licensing Dated 3/31/93 Page 2 of 2 Your response to the concern was appreciated.
Contact me if there are any questions or comments.
Sincerely, O'
Steven W. Andrews Quality Assurance Manager Enclosure - CPS Certification Document Dated 3/31/93 cc:
H. Kerr, President - CPS G. Johnson, Gen. Mgr. - CPS CPS Part 21 File CPS File for TUE PO 665-71784
Consolidated
~
~-
i Power Eiupply 2
CERTIFICATION
- REVISED 3-31-93 CUSTOMER: TU ELECTRIC COMPANY DATE: 6-28-89 DIRECTOR OF ENGINEERING CUSTOMER P.O. #: 665-71784 P.O. BOX 1001 GLEN ROSE, TX.
76042 j
SALES ORDER: 6555870 i
ATTN: QA RECEIPT INSPECTION 4
HEAT j
ITEM /
QTY MATERIAL DESCRIPTION MANUFACTURER CODE t
006 i
1 10 EA 12" 150/ RF WN FLG SA182 F304 TEXAS METAL 3
j
)
SCH 40
{
1 THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
]
1 i
i X
CPS QA PROGRAM REV. 1 DATED 6/01/87 X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
AS COMMERCIAL GRADE MATERIAL l
3_I $[$$[55$[I$I$5 dan: };}_;g}_
1 L. HOLLON i
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A D:viston of Consohda ed Ppe & Supply Co. Inc. Bemingnam. AL
~ t Consolidated 4
Power Eiiupply March 31, 1993 Page 1 of 2 Keegan Specialty Enterprise, Inc.
651-A Gellhorn Houston, TX 77029 Attn: Mr.
S. M. Hwang
Subject:
Notification of a Deficiency for Keegan/Daewoo Shipbuilding Purchase Order PF124490, Dated July 18, 1991
Dear Mr. Hwang:
Consolidated Power Supply (CPS) has conducted an evaluation for material supplied against the subject purchase order.
Three items were certified as meeting the requirements of NCA-3867.4(e) which have been determined to be deficient with regards to acceptable upgrading practices. The material is identified as manufactured by Texas Metal Works as follows:
1) 20 each - 14" 150/ RF WN flanges, SA182 F304L, heat code 6332 2) 2 each - 12" 300 / RF WN flanges, SA182 F304L, heat code 6332 3) 8 each - 14" 300# RF WN flanges, SA182 F304L, heat code 63~2 In order to address the current concern, CPS is implementing the actions necessary to close the open deficiency.
Please find 1
enclosed with _ this correspondence a revised CPS certification document for the above material.
The revision deletes the references to the ASME Code requirements, including the reference to QSC# 515.
These documents shall be utilized as a replacement
_l for the certification submitted with the original material on 10/30/91.
By issuance and verification of your receipt of this letter, the 10 CFR 21-evaluation relative to your purchase order will be considered closed.
It is your responsibility to forward the Birmingham, Alabama 35235 (205) 655-5515 3556 Mary Taylor Road
- %:t:an of Consohdated Pipe & So; ',- Co, Inc. Birmingham, AL
-. -. =.. -,. -...,.. -
- Consolidated
.ns.
7(
Power Supply Letter to Keegan Enterprise Dated 3/31/93 Page 2 of 2 enclosed document to the appropriate personnel.
Also, CPS will be notifying The American Society of Mechanical Engineers of the status of the evaluation upon final closure of our internal paperwork.
If there are any questions or comments please contact me.
Sincerely, teven W. Andrews Quality Assurance Manager Enclosure - CPS Certification Document for Daewoo PO PF124490 cc:
H. Kerr, President - CPS G. Johnson, Gen. Mgr. - CPS CPS Part 21 File CPS File for Daewoo PO PF124490 l
D Consolidated Power Eiiupply CERTIFICATION
- REVISED 3-31-93 CUSTOMER: DAEWOO SHIPBUILDING & HEAVY DATE: 10-30-91 MACHINERY LTD.
CUSTOMER P.O. #: PF124490 SALES ORDER: 6511042 HEAT ITEM /
QTY MATERIAL DESCRIPTION MANUFACTURER CODE o
20 EA 14" 150/ RF WN FLG SA182 F304L TEXAS METALS 6332 STD BORE CUT CODE:
CYI, CYF
CYG PFASADAAKK 8 EA 14" 300/ RF WN FLG SA182 F304L TEXAS METALS 6332 CUT CODE:
CYI, CYH THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM 2ND EDITION REV.0 DATED 9/14/90 X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
AS COMMERCIAL GRADE MATERIAL
_Y____--_____
L. HOLLON (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road
=
A Division of Consoftdated Ppe & Supply Co., Inc. Birmingham. AL
- - ~..
~
Consiolidated 4
Power Siupply March 31, 1993 Page 1 of 2 TVA, Office of Nuclear Power Nuclear Licensing and Regulatory Affairs 1101 Market Street Chattanooga, TN 37402-2801 Attn: Manager, Technical Licensing Services LP SN 156B
Subject:
Follow Up on the 10 CFR 21 Evaluation for TVA Purchase Order 89NJC-74962A-02
Reference:
Consolidated Power Supply Letter Dated November 18, 1992 for Notification of a 10 CFR 21 Evaluation As conveyed in the referenced correspondence your company was notified of a deviation from the requirements of NCA-3867.4(e) of the ASME Code in providing materials to the subject purchase order.
This rendered the material as inueterminate as the Code upgrade activities were not in compliance with all applicable requirements.
Multiple conversations have occurred with Mr. Bill Goins of your l
Sequoyah facility regarding the status and disposition of the material, which was specifically identified in the above referenced document.
It may be advisable to contact Mr. Goins in order to obtain the current status of the material.
As no final disposition has been conveyed by TVA at this time, Consolidated Power Supply (CPS) is implementing the actions necessary to initiate closure of the open deficiency.
Please find enclosed the revised CPS certification documents for the deficient material.
The revisions have deleted the references to the ASME Code requirements, including the reference to QSC# 515.
These documents shall be utilized as a replacement for the original certification that was provided for the subject material only.
By issuance and verification of your receipt of this letter, the 10 CFR 21 evaluation relative to your facility will be considered closed.
Also, CPS will be notifying The American Society of Mechanical Engineers and the United States Nuclear Regulatory (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A Dvsson cf Conso!. dated Pee & Suon Go, Inc. Birmingham AL
'. ?
Consolidated
\\-QcwQ Power Supply Letter to TVA Licensing Dated 3/31/93 Page 2 of 2 i
1 Commission of the status of the evaluation upon final closure of our internal paperwork.
Thank you in advance for your cooperation and assistance.
If there are any questions or comments concerning this correspondence please contact me at your convenience.
Sincerely, 64-Steven W. Andrews Quality Assurance Manager i
Enclosure - CPS Certification Documents Dated 3/31/93, 2 pages cc:
H. Kerr, President - CPS G. Johnson, Gen. Mgr. - CPS CPS Part 21 File CPS File for TVA PO 89NJC-74962A-02
i Consiolidated 1
4 Power 8siupply CERTIFICATION l
- REVISED 3-31-93 CUSTOMER: TENNESSEE VALLEY AUTHORITY DATE: 11-22-89 SEQUOYAH NUCLEAR PLANT POWER STORES UNIT CUSTOMER P.O. /: 89NJC 74962A-02 SODDY-DAISY, TN.
37379 SALES ORDER: 6557810 i
ATTN: G.A.
ROBERTS SUPRV HEAT j
ITEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE
_---_-__--_-------_-------_-------___-_--------------_----_--_-----_-5408 29 2 EA 24" 150/ WN RF FLANGE SA105 TEXAS METAL 209 30 9 EA 20" 150/ WN RF FLANGE SA105 TEXAS METAL 2095491 31 3 EA 18" 150/ WN RF FLANGE SA105 TEXAS METAL 207P794 THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM REV. 1 DATED 6/01/87 X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAN: SEEN SUPPLIED
AS COMMERCIAL GRADE MATERIAL l
SIGNED BY:
TITLE: Q A REPRESENTATIVE DATE: 3-31-93 L.
HOLLON (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A Dmsron of Consoncatec *Re ', 5xo) Co wc Bwifam AL
' ~ Consolidated 4
Power Eiiupply CERTIFICATION
- REVISED 3-31-93 CUSTOMER: TENNESSEE VALLEY AUTHORITY DATE: 11-22-89 SEQUOYAH NUCLEAR PLANT POWER STORES UNIT CUSTOMER P.O. #: 89NJC 74962A-02 SODDY-DAISY, TN.
37379 SALES ORDER: 6557810A ATTN:
G.A.
ROBERTS SUPRV HEAT ITEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE 32 13 EA 16" 150/ WN RF FLANGE SA105 TEXAS METAL TV 33 5 EA 12" 150/ WN RF FLANGE SA105 TEXAS METAL TV 36 3 EA 10" 150/ WN RF FLANGE SA105 TEXAS METAL TV 35 3 EA 16" 150# RF BLIND SA105 TEXAS METAL TV FLANGE THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM REV. 1 DATED 6/01/87 X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
AS COMMERCIAL GRADE MATERIAL TITLE: Q A REPRESENTA IVE DATE: 3-31-93 SIGNED BY:
]
L. HOLLON (205) 655 5515 Birmingham, Alabama 35235 3556 Mary Taylor Road
=
a t
p 3
'2 d.
E
)
J
t Consolidated 4
Power Eiupply March 31, 1993 Page 1 of 2 Duke Power Company 422 South Church Street (Mail Code EC090)
Charlotte, NC 28201 Attn: Mr. David Whitaker Nuclear Production Engineer
Subject:
Follow Up on the 10 CFR 21 Evaluation for Duke Power Company Purchase Order A38143-17
Reference:
Consolidated Power Supply Letter Dated November 18, 1992 for Notification of a 10 CFR 21 Evaluation
Dear Mr. Whitaker:
As you are aware, Duke Power Company was notified of a deviation from the requirements of NCA-3867.4(e) of the ASME Code in providing materials to the subject purchase order.
This rendered the material as indeterminate as the Code upgrade activities were not in compliance with all applicable requirements.
As no final disposition has been conveyed by Duke Power at this time, Consolidated Power Supply (CPS) is implementing the necessary actions to initiate closure of the open deficiency.
Please find enclosed a revised CPS certification document for the deficient material. The revision has deleted the references to the ASME Code requirements, including the reference to QSC/ 515.
The revised certification shall be utilized to replace the original certification that was provided with the material.
I By issuance and verification of your receipt of this letter, the 10 CFR 21 evaluation relative to your facility will be considered closed.
Also, CPS will be notifying The American Society of Mechanical Engineers and the United States Nuclear Regulatory Commission of the status of the evaluation upon final closure of our internal paperwork.
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road a
A Division of Consonaated Pre 5 Supr4 Co In: Ermmgham, AL
1
],nh.1, Consolidated l
?.
l Q
Power Supply l
l l
l Letter to Duke Power Company Dated 3/31/93 Page 2 of 2 If there Thank you in advance for your cooperation and assistance.
are any questions or comments concerning this correspondence please contact me at your convenience.
Sincerely,
(
S even W. Andrews Quality Assurance Manager Enclosure - CPS Certification Document Dated 3/31/93, 1 page cc:
H. Kerr, President - CPS G.
Johnson, Gen. Mgr. - CPS CPS Part 21 File CPS File for Duke PO A38143-17
o
--i a
4
--++o
,m.
.a.m=
e.
Consolidated 4
Power Siupply CERTIFICATION
- REVISED 3/31/93 CUSTOMER: DUKE POWER CO.
DATE: 11/15/91 SOUTHERN DIVISION CONST & MAINT. DEPT.
CUSTOMER P.O. #: A38143-17 S.C.
HIGHWAY 183
- SENECA, S.C.
29678 SALES ORDER: 6511097 ATTN: QA RECEIPT INSPECTION HEAT ITEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE j
3 16 10" 300# SO FLANGE SA182 TYPE F304-TEXAS METAL 5500 WORKS, INC.
HEAT /
465591 CUT CODE CYW 4
THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM 2ND EDITION REV.0 DATED 9-14-90.
y X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
i i
TITLE: Q A REPRESENTATIVE DATE: 03-31-93 SIGNED BY:
,[
R.M. STOCKTO JR.
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road
,m/.
- 9
= -.,,.. _,. - - -.
Consolidated A
Power iiupply s
March 31, 1993 Page 1 of 2 l
Martin Marietta Energy Systems, Inc.
Highway 58 Gallaher Road Oak Ridge, TN 37831 Trailer K1310E MS - 7222 i
Attn: Mr. B. L.
Carter Manager, Procurement Quality
Subject:
Follow Up on the 10 CFR 21 Evaluation for Martin Marietta Purchase Orders 72K-01811 and 72K-LT751V
Reference:
Consolidated Power Supply Letter Dated November 19, 1992 for Not4,fication of a 10 CFR 21 Evaluation i
Dear Mr. Carter:
As conveyed in the referenced correspondence your company was notified of a deviation from the requirements of NCA-3867.4(e) of
[
i the ASME Code in providing materialc to the subject purchase order.
This rendered the material as indeterminate as the Code upgrade l
activities were not in compliance with all applicable requirements.
l As no final disposition has been conveyed by Martin Marietta at i
this time, Consolidated Power Supply (CPS) is implementing the l
actions necessary to initiate closure of the open deficiency.
j Please find enclosed revised CPS certification documents for the deficient material.
The revisions have deleted the references to the ASME Code requirements, including the reference to QSC/ 515.
These documents shall be utilized as a replacement for the original i
certification that was provided for the subject material only.
By issuance and verification of your receipt of this letter, the 10 CFR 21 evaluation relative to your facility will be considered closed.
Also, CPS will be notifying The American Society of Mechanical Engineers and the United States Nuclear Regulatory 4
Commission of the status of the evaluation upon final closure of our internal paperwork.
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road a
A Divoon :' Cc+vd dated Pie !> Suppy Co Inc Beming%w AL
..------_-_,,.-,-_i
I 1
X',.' Consolidated
]y(,
Power-Supply l
i
]
Letter to Martin Marietta Dated 3/31/93 o
i Page 2 of 2 i
If there
[
J Thank you in advance for your cooperation and assistance.
are any questions or comments concerning this correspondence please r
l contact me at your convenience.
t I
i Sincerely, k
d4 n Steven W.
Andrews Quality Assurance Manager f
L i
i a
4 l
Enclosure - CPS Certification Documents Dated 3/31/93, 2 pages l
cc:
- n. Kerr, President - CPS 7
l G. Johnson, Gen. Mgr. - CPS l
3 CPS Part 21 File CPS File for MM PO's 72K-01811 & 72K-LT751V d
r i
i I
1 i
i mv.-,,,.,y-,...,,
g Consolidated 4
Power Supply CERTIFICATION
- REVISED 03/31/93 CUSTOMER: MARTIN MARIETTA DATE: 09-20-89 ENERGY SYSTEMS INC BLDG K-1001 MS 7154 CUSTOMER P.O. #: 72K-LT751V OAK RIDGE, TN. 37831 SALES ORDER: 6555110 ATTN: QA RECEIPT INSPECTION HEAT ITEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE 23 16EA 10" 150# RAISED FACE, BLIND SA182 304L TEXAS METALS 6071 STAINLESS STEEL FLANGES 18 13EA 10" RAISED FACE, WELD NECK, SA182 304L TEXAS METAL 6071 SCH 10 BORE STAINLESS STEEL 150# FLANGE 18 13EA 10" RAISED FACE, WELD NECK, SA182 304L TEXAS METAL 5422 SCH 10 BORE STAINLESS STEEL 150# FLANGE l
THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM REV.1 DATED 06-01-87.
l X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
s SIGNED BY:
TITLE: Q A REPRE ENTATIVE DATE: 03-31-93 R.M.
STOCKTON, JR.
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A D:vusion c' Consohda:Ed Pan ', SaDP) Co, Inc Bormingham. AL
Consolidated 4
Power Eiupply
{
I CERTIFICATION 4
- REVISED 3/31/93 1
CUSTOMER: MARTIN MARIETTA ENERGY SYSTEMS DATE: 07-30-90 BUILDING K-1001, MS 7154 OAK RIDGE, TN. 37831-7154 CUSTOMER P.O.
SALES ORDER: 6566079 i
ATTN:
B.L.
CARTER HEAT XTEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE 8
2 EA 8" 150 LB RAISED FACE, WELD SA182 F304L TEXAS METALS NECK, SCH 40 BORE STAINLESS HEAT /
98858 STEEL FLANGE HEAT CODE:.
6199 4
10 2 EA 8" 150 LB FAISED FACE, BLIND SA182 F304L TEXAS METALS STAINLESS STEEL FLANGE HEAT /
98858 HEAT CODE:
6199 1
i 1
11 7 EA 10" 150 LB RAISED FACE, BLIND SA182 F304L TEXAS METALS STAINLESS STEEL FLANGE HEAT /
98858 HEAT CODE: 6199 THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
X CPS QA PROGRAM REV.2 DATED 10-25-89.
l 2
X THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
1 SIGNED BY:
TITLE: Q A REPRESENTAT VE DATE: 03-31-93 R.M.
STOCKTO JR.
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road a
A Dwasion of Consolidated Pipe & Supply Co, Inc. Birmingham. AL
_ _. _ _ _.... _ _ _. _. _,....., _...... - _.... ~.. _.. _ _ - _.. -
Consolidated g
Power Siupply s
March 31, 1993 Page 1 of 2 Connex Pipe Systems 1115 Gilman Street Marietta, OH 45750 Attn: Mr. Kevin Welch Quality Assurance Manager
Subject:
Follow Up on the 10 CFR 21 Report for Connex Pipe Systems Purchase Order E4210-2
Dear Mr. Welch:
As we have discussed, the 24" blind flange supplied by Consolidated Power Supply (CPS) remains an open issue.
This is due to the indeterminate status of the one piece of material.
I have attempted to contact Mr. Dave Perkins, Public Service Electric &
Gas, relative to whether or not the flange has been removed from service, and if it was removed where the material is physically located.
l t
As there has been no conveyance from PSE&G to date regarding the definite status of the material, CPS is implementing the actions necessary to initiate closure of the open deficiency.
Please find enclosed with this correspondence a revised CPS certification document for the subject material.
The revision deleted the references to the ASME Code requirements, including the reference to QSC# 515.
The revised certification shall be utilized as a replacement for the original certification that was provided for i
the subject material.
By issuance and verification of your receipt of this letter, the 10 CFR 21 report relative to Connex Pipe Systems will be considered closed.
It is required that you forward the enclosed certification document to Mr. Perkins as PSE&G is the end user of the material.
Closure is also based on the return of all deficient material identified on Connex Pipe System Purchase Orders E4268-1 and E4268-2.
Also, CPS will be notifying The American Society of Mechanical Engineers and the United States Nuclear Regulatory Commission of (205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road i
l A Dension of Consohdated Pipe & Supply Co., Inc. Birmingham. AL
Consolidated
'y.
Power Supply Letter to Connex Pipe Systems Dated 3/31/93 Page 2 of 2 the status of the evaluation and report issued upon final closure of our internal paperwork.
Your efforts in this matter have been appreciated.
If there are any question or comments concerning this correspondence please l
contact me at your convenience.
l Sincerely, Steven W. Andrews Quality Assurance Manager l
l l
Enclosure - CPS Certification Document Dated 3/31/93 cc:
H. Kerr, President - CPS G. Johnson, Gen. Mgr. - CPS CPS Part 21 File CPS File for Connex PO's E4210-2, E4268-1, and E4268-2
/
Consolidated Power iiupply s
CERTIFICATION CUSTOMER: CONNEX PIPE SYSTEMS DATE: 9-16-92 1115 GILMAN STREET MARIETTA, OHIO 45750 CUSTOMER P.O.
- E4210-2 SALES ORDER: 6522883 ATTN: MR. H.A. MCCONKEY HEAT ITEM #
QTY MATERIAL DESCRIPTION MANUFACTURER CODE l
1 1 EA 24" 150/ RF BLIND SS SA182 F316L TEXAS METAL 6482 FLG (HT/ 460066)
CPS CUT CODE: FAS a
THIS SHALL CERTIFY THAT THE ABOVE MATERIAL WAS MANUFACTURED AND PROCESSED IN ACCORDANCE WITH SPECIFICATIONS WHICH MEET THE FOLLOWING REQUIREMENTS:
i X
CPS QA PROGRAM 2ND EDITION REV.0 DATED 9/14/90 l
1 X
THE ITEMS INDENTIFIED ON THIS CERTIFICATION HAVE BEEN SUPPLIED
AS COMMERCIAL GRADE MATERIAL 9
SIGNED BY:
TITLE: Q A REPRESENTA'I E
DATE: 3-31-93 L. HOLLON i
(205) 655-5515 Birmingham, Alabama 35235 3556 Mary Taylor Road A Division of Consohdated Pipe & Swply Co., Inc. Bemingham, AL