Notifies That NRC Completed Review of GE Topical Rept NEDC-31336, GE Instrument Setpoint Methodology, Dtd Oct 1986
ML20035C946
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/23/1993
From: Robert Stransky
Office of Nuclear Reactor Regulation
To: Stratman R
CLEVELAND ELECTRIC ILLUMINATING CO.
References
TAC-M86023, NUDOCS 9304090286
Download: ML20035C946 (3)


Text

... _ _

March 23, 1993 Docket No. 50-440 Distribution Docket File NRC& Local PDRs Mr. Robert A. Stratman, Vice President PDIII-3 r/f JRoe Nuclear - Perry JZwolinski OGC The Cleveland Electric Illuminating RStransky ACRS(10)

Company PKteutzer 10 Center Road EGreenman, RIII Perry, Ohio 44081 PDIII-3 Gray File I

SUBJECT:

INSTRUMENT SETPOINT METHODOLOGY (TAC NO. M Mce)

In November 1985, the NRC staff issued Supplement 7 to the Safety Evaluation Report (SER) for the Perry Nuclear Power Plant (NUREG-0887, Supp. 7).

In Section 7.2.2.8 of the Supplement, " Instrumentation Setpoints," the staff approved the interim use of the Perry setpoint methodology, pending NRC staff resolution of information presented by the Instrument Setpoint Methodology Group (ISMG).

On behalf of the ISMG, the General Electric Company (GE) submitted GE Topical Report NEDC-31336, " General Electric Instrument Setpoint Methodology," dated October 1986.

Your March 3, 1989, letter regarding FSAR Commitment No. 14, " Instrument Setpoint Methodology," stated that:

"Six months after a favorable NRC Safety Evaluation Report on GE Instrument Setpoint Methodology (NEDC-31336), and subject to any other stipulations therein, CEI shall provide for NRC staff review and approval, a detailed technical report documenting the basis and methodology for establishing protection system trip setpoints and allowable values, based on the Instrument Setpoint Methodology Group (ISMG) effort, as discussed in CEI letter dated October 17, 1985."

The purpose of this letter is to notify you that the NRC staff has completed its review of GE Topical Report NEDC-31336.

In accordance with your FSAR commitment, you will have six months from the date of receipt of this letter to provide the above-described report. A copy of the staff SE for NEDC-31336 is enclosed for your use.

If you have any questions regarding this matter, please contact me at (301) 504-1346, 4

Sincerely, Jon B. Hopkins/for Robert Stransky, Project Manager Project Directorate III-3 l

Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation omu LA:PDIII-3 PM:PDITI-3 D:PDIII-3 NAME PKreutZend PSNsY JHannonk

$ /; 3 ///3 g3/Q3

'3 /33 /f 3 DATE 0FFICIAL RECORD COPY FILENAME: C:\\ AUTOS \\WPDOCS\\PERIC.LTR pp y * ['El CN

,,ca 060000 t

9304090286 930323 60s PDR ADOCK 05000440

\\

I P

PDR

\\ D.

e-tr

g.

pa neo f

I UNITED STATES t

[

.j

- NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20666 0001 I

\\

l 4

March 23, 1993 DocYel.No. 50-440 I

Mr. Robert A. Stratman, Vice President i

Nuclear - Perry The Cleveland Electric Illuminating Company 10 Center Road Perry, Ohio 44081

SUBJECT:

INSTRUMENT SETPOINT METHODOLOGY (TAC NO. M86023)

In November 1985, the NRC staff issued Supplement 7 to the Safety Evaluation Report (SER) for the Perry' Nuclear Power Plant (NUREG-0887, Supp. 7).

In Section 7.2.2.8 of the Supplement, " Instrumentation Setpoints," the staff approved the interim use of the Perry setpoint methodology, pending NRC staff resolution of information presented by the Instrument Setpoint Methodology Group (ISMG). On behalf of the ISMG, the General Electric Company (GE) submitted GE Topical Report NEDC-31336, " General Electric Instrument Setpoint Methodology," dated October 1986.

Your March 3,1989, letter regarding FSAR Commitment No.14, " Instrument Setpoint Methodology," stated that:

"Six months after a favorable NRC Safety Evaluation Report on GE Instrument Setpoint Methodology (NEDC-31336), and subject to any other stipulations therein, CEI shall provide for NRC staff review and approval, a detailed technical report documenting the basis and i

methodology for establishing protection system trip setpoints and-allowable values, based on the Instrument Setpoint Methodology Group (ISMG) effort, as discussed in CEI letter dated October 17, 1985."

The purpose of this letter is to notify you that the NRC staff has completed l

its review of GE Topical Report NEDC-31336.

In accordance with your FSAR commitment, you will have six months from the date of receipt of this letter to provide the above-described report. A copy of the staff SE for NEDC-31336 is enclosed for your use.

If you have any questions regarding this matter, please contact me at (301) 504-1346.

Sincerely,

(

%)

f a

l Robert Stransky, Project Manager

/

Project Directorate III-3 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page i

)

1

t-o Mr. Robert A. Stratman Perry Nuclear Power Plant Cleveland Electric Illuminating Company Unit Nos. 1 and 2 cc:

Jay E. Silberg, Esq.

Mr. J3mes W. Harris, Director Shaw, Pittman, Potts & Trowbridge Division of Power Generation 2300 N Street, N.W.

Ohio Department of Industrial Relations Washington, D.C.

20037 P. O. Box 825 Columbus, Ohio 43216 Mary E. O'Reilly Centerior Energy Corporation The Honorable Lawrence Logan 300 Madison Avenue Mayor, Village of Perry Toledo, Ohio 43652 4203 Harper Street Perry, Ohio 44081 Resident Inspector's Office The Honorable Robert V. Orosz U.S. Nuclear Regulatory Commission Mayor, Village of North Perry Parmly at Center Road North Perry Village Hall Perry, Ohio 44081 4778 Lockwood Road North Perry Village, Ohio 44081 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Attorney General 799 Roosevelt Road Department of Attorney General Glen Ellyn, Illinois 60137 30 East Broad Street Columbus, Ohio 43216 Frank P. Weiss, Esq.

Assistant Prosecuting Attorney Radiological Health Program 105 Main Street Ohio Department of Health Lake County Administration Center Post Office Box 118 Painesville, Ohio 44077 Columbus, Ohio 43266-0118 Ms. Sue Hiatt Ohio Environmental Protection Agency OCRE Interim Representative DERR--Compliance Unit 8275 Munson ATTN: Zack A. Clayton Mentor, Ohio 44060 P. O. Box 1049 Columbus, Ohio 43266-0149 Terry J. Lodge, Esq.

618 N. Michigan Street, Suite 105 Mr. Phillip S. Haskell, Chairman Toledo, Ohio 43624 Perry Township Board of Trustees 4171 Main Street, Box 65 John G. Cardinal, Esq.

Perry, Ohio 44081 Prosecuting Attorney Ashtabula County Courthouse State of Ohio Jefferson, Ohio 44047 Public Utilities Commission East Broad Street Mr. Kevin P. Donovan Columbus, Ohio 43266-0573 Cleveland Electric Illuminating Company David P. Igyarto, General Manager Perry Nuclear Power Plant Cleveland Electric Illuminating Company P. O. Box 97, E-210 Perry Nuclear Power Plant herry, Ohio 44081 Post Office Box 97, SB306 Perry, Ohio 44081