DIW c ON1aACTnOCOOe vAncOn m
' AMENDMENT OF SOLICITATION / MODIFICATION OF CCNTRACT l
1 I
- 4. +<EGus58T ION /PUHCHASE HLQ. NO.
S. PHOJ LCT NO. gJf appag%
J. t.F F LCT av t Oa 10 NRR-89Mtd 2 /10 /01 MLN T /MousticAT SON ho.
i
- . Au t r
)
^ enwn m
' 7. ADMINebT E HLO BY (1/ other c'ien Jten 61 l
- 6. 455v00 uv U.S.. Nuclear Regulatory Ccmmission Division of Contracts & Property Management Wasnington, DC 20555
@,9A. AMENOMLNT OF SQLiCIT AT 40N NO.
I Naut. ANO AODNL55 OF CONT R ACT OH (Na street, county. a Law sad fif' Codes J
Paratacter, Inc.
so. OAT EO <sa ira n, 13380 Watertcwn Plank Road Elm Grove, Visconsin 53122 loa.
DiF 4 CATION OF CONT R ACT/ ORDER Principal Investigator / Technical X
NRC-03-89-029 Richard A. Lofy
Contact:
los. DATED (saira ne Telepnone No.
(414) 786-7580 9/29/89 lFACIUTY CODE 11.THIS 11tM ONLY APPLIESTO AMENOMENTSOF SOLICITATIONS coOE is cAsenos2 is ta ca.
The above numbered soiscitation is amenced as set fort *n in item 14. The hour and date specified fo'r receip h
Offers must acknowledge receipt of this amendment prior to the hour and d.te tenoxE (el By completing starris e and 15.and retumsic PECIFIED MAY RESU1.T suomrtind or (c) By separaw 6etter or te6egram weidt includes a reference to the wiscitetson and amendmmt pumoers.
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIFT OF OFFERS prior TO THE HOU d by telerams or IN fsEJECTION OF YOUR OFFER. If by wrtue of this
..-..es,t you cesere to change an offer streedy sabmitted, such change mey be ma e ser=r. ore ch wiev.= or setter maes re:a to trw sosicitsinon and this...smem.a
- 12. ACCOUN T4NG AND APPROPRIATION DAT A (1/ reemated)
OBLIGATE:
$ 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDER IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBE 0 IN ITEM 14.
(specftf assmontys THE CHANGES SCT FORTH IN ITEM 1e ARE MAOCIN T HE CON.
A. T His CH ANGE OROC A is #55UEO PUH5UANT TO:
g TR ACT ORDER NO. IN 8 TEM 10A.
E f
h r ses in payent OChet.
I
- 8. THE ABOVE NUMBERED CONT A ACT/082OER 15 MOOtFf ED TO REFLECT THE ADMIN R 43.103(c).
approprn.asose deer, esc.) SET FORTH IN ITEM 14.PUR5UANT TO THE AUTHORITY OF F A C. T His $UPPLLMENTAL AGREEMENT 45 ENT ERED $NTO PUR5UANT T O AUTHCHIT Y OFs
^
O. OT HeR < spec <tr rrpe et me.ura ao..no moneys X
Mutual Agreement of the Parties Contractor b is not, b is required to sign this doeurnent and return copies to the issuing of fice.
E. IMPORTANT:
t t snesgar sphere feess6es.J
- 14. DESCHW1 SON Of AMENOMENT/MOOiF 8 CAT 80N (Orgonued by (/Cf secaos acad4 ass. ancmaans sodicitehosucen (SEE NEXT PAGE)
I 9304000267 930309 h'
PDR CONTR I
PDR NRC-03-89-029 Sce Caw \\c& f 3 f 93 Jd in tui. so.c-E.-........ o
...n........ co.,e,uon, o, tn. docum.nt
..<...,,c...n...,,,, A o, i o A.,s,,,,.teto,. co.,,e
..,n.ms uncn.
e.
16A.NAME AND TIT LE OF CONTRACTING OFFICER (Type orpnasJ
..o.
IS A. N AM O tit to Or SioNeR < Type., nnri 3c ('.4 A. L. / %.
Mary Lyr.n Scott, Contracting Officer 16C. D A TE 54GF4 ED rx n
168. UN4100 5T ATES OF AME88CA A SC. DA TY. 51G N LD ISB. CON 19 Ac rf ROH 10 E fu Au 3
gy (bstierbar et Contractans Oftwert l
^
(57dneture of person eutdige fyasa eramar1 ARD FORM 30 (REY. 3-83)
-u 1
I r
l i
NRC-03-89-029 Modification No. 7 Page'2 of 4 The purpose of this modification is to delete contract clause H.10,
" Contract Security Requirements", and replace it with the following new clause H.10, " Contract Security Requirerents for Unescorted Access To Nuclear Power Plants". Accordingly, the contract is modified as follows:
Delete clause H.10, " Contract Security Requirements" and substitute the following therefore:
"H.10 Contract Security Requirements for Unescorted Access to Nuclear Power Plants Performance under this contract may involve unescorted access to protected and vital areas of nuclear power plants or access to unclassified Safeguards Information (SGI).
Individual contractors requiring access to protected and vital areas of nuclear power plants or access to unclassified SGI will be approved for' unescorted access in accordance with the following procedures.
H.10.1 Temporary Approval a.
The contractor shall submit the following information to the NRC Division of Security (SEC) through the NRC Project Officer within thirty (30) calendar days following contract award, modification,-or proposal of new personnel for contract tasks requiring unescorted access:
a completed Personnel Security Forms Packet, including an SF-86, " Questionnaire for Sensi:
Positions (For National Security);" copies of the contractor's five-, " employment and education history checks, including verification of hip cut degree obtained; a reference from at least one additional person not provided by the individual; results of a psychological evaluation; and a certification that the contractor has found all checks acceptable.
The results of a psychological examination, which uses a reliable written personality test or any other professionally accepted clinical evaluation procedure, shall be used to evaluate a subject's trustworthiness, reliability, and stability.
The contractor shall review all required information for accuracy, completeness, and legibility, except Part 2 of the SF-86 which is required to be completed in private and submitted by.the i
individual to the contractor in a sealed envelope.
4
t
'~
NRC-03-89-029 Modification No. 7 Page 3 of 4 Or, b.
The individual will arrange to be fingerprinted by the subject utility, and the contractor will submit to the utility's access authorization program.
In item H.10.la. above, SEC will conduct criminal history and credit checks and a security assurance interview with the individual.
Based on the result of these checks, SEC will determine the individual's eligibility for temporary access and provide an objection or no objection to the sponsoring Office pending completion of the required background investigation by OPM.
H.10.2 Final Approval l
a.
The required investigation on the individual has been completed, and is satisfactory, resulting in NRC's endorsement of the individual's unescorted access at all nuclear facilities for the life of the contract, or b.
The contractor has obtained unescorted access authorization (other than temporary access) at the specific facility through that utility's access authorization program, or 9
c.
The individual possesses a valid government issued clearance as verified by SEC.
A valid government-issued clearance is defined as a U.S.
Government-issued security clearance equivalent or higher than an NRC "L" clearance (e.g., Secret) based on a comparable investigation not more than five years old.
If an NRC contract is let to a foreign owned company employing foreign nationals, SEC will attempt to obtain a security assurance from the respective government that a comparable investigation has been conducted on the individual.
If an acceptable assurance is obtained, SEC will provide a NO SECURITY OBJECTION without further investigative checks.
The investigation in H.10.2.a. above may involve a National Agency Check with Inquiries and Credit (NACIC) or other investigation as deemed necessary by SEC in accordance with 10 CFR_ Part 10 and NRC Management Directive and Handbook 12.3.
Any questions regarding the individual's eligibility for unescorted access to protected or vital areas of nuclear power facilities will be resolved in accordance with the provisions specified in 10 CFR Part 10, which is incorporated into the contract by reference as though fully set forth herein.
I f
r NRC-03-89-029 Modification No. 7 Page 4 of 4 The contractor shall submit to SEC through the Project Of ficer for each contractor individual submitted / approved for access under the provisions of H.10.1.a. and H.10.2.a. above, a signed statement from the individual that he or she understands his or her responsibility to report to the NRC, Division of Security, Personnel Security Branch, any information bearing on his or her continued eligibility for access authorization as specified in 10 CFR Part 10, Section 10.11 " Criteria".
Access to unclassified power reactor Safeguards Information (SGI) not also involving unescorted access to protected and vital areas of nuclear power plants will require the submission of a completed Personnel Security Forms Packet to SEC through the Project Officer and may require a National Agency Check (NAC) or other investigation deemed necessary by the NRC in accordance with 10 CFR Part 10 and NRC Management Directive and Handbook 12.3.
Any questions regarding the individual's eligibility for access to nuclear power reactor SGI will be resolved in accordance with the provisions set forth in 10 CFR Part 10, which is incorporated into this contract by reference as though fully set forth herein.
Based on the review of the applicant's security forms by SEC and/or the receipt of adverse information by NPC, the individual may be denied access to nuclear power reactor SGI until a final determination of his or her eligibility for access is made under the provisions of 10 CFR Part 10.
During the processing by SEC of new individuals for access to nuclear power reactor SGI, access may be granted under licensee programs.
H.10.3 Fitness for Duty Pursuant to NRC policy, all contract individuals proposed for performance of task orders requiring unescorted access to nuclear power plants will be subject to the requirements of the licensee's Fitness-for-Duty program.
H.10.4 Basic Exposure Control and Personnel Dosimetry Training Requirements 4
The contractor shall certify that personnel utilized under the scope of work herein have completed basic exposure control and personnel dosimetry training sufficient to meet the requirements of commercial nuclear power plants for unescorted access.
Training will be provided on a one-time basis, upon issuance of the applicable task order (s), for those individual (s) for whom the contractor cannot certify as to having completed the above training within the past year.
Site specific training obtained i
at each site will still be required during the performance of individual task orders in addition to the basic training."
l All other terms and conditions of the contract remain the same.