Forwards Schedular Exemption from 10CFR50,app E,Section IV.F.2 Requirement for Annual Exercise of Plant Emergency Plan for 1992.Exemption Granted on Condition That Plant Does Not Resume Operation
ML20035C333
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/29/1993
From: Masnik M
Office of Nuclear Reactor Regulation
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20035A470 List:
References
TAC-M85826, NUDOCS 9304070070
Download: ML20035C333 (4)


Text

_ o u.

m g[g /

/h g["g / p UNITED STATES NUCLEAR REGULATORY COMMISSION

, g WASHINGTON. D. C. 20555

%[* cr4,/

March 29, 1993 l-Docket No. 50-344 Mr. James E. Cross Vice President Nuclear Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204

Dear Mr. Cross:

SUBJECT:

EXEMPTION FROM 10 CFR 50, APPENDIX E, SECTION IV.F.2., REGARDING THE REQUIREMENT FOR ANNUAL EMERGENCY PLAN EXERCISES (TAC M85826)

On December 29, 1992, the staff granted a schedular exemption from the 1992 annual exercise requirement, approving deferment of the 1992 exercise to the first quarter of calendar year 1993.

In your letter of February 15, 1993, you requested an exemption to the requirement for an annual exercise of the Trojan Nuclear Plant Emergency Plan for 1992 that was scheduled for the first quarter of 1993.

We have completed our review of your February 15, 1993, request for an exemption from 10 CFR 50, Appendix E, Section IV.F.2, for 1992 and find it appropriate to issue an exemption on the condition that the plant does not resume operation. Should you decide to restart Trojan, the exercise must be conducted before the plant resumes operation.

The exemption permits you to suspend the annual training exercise required by 10 CFR 50, Appendix E, Section IV.F.2, on a one time basis for 1992.

Our conclusion is based on the defueled non-operating status of the Trojan Nuclear Plant, and your commitment in a letter dated February 17, 1993, not to move fuel back into containment without prior NRC approval.

On March 8, 1993, the staff received a revised emergency plan for the Trojan Nuclear Plant, called the Permanently Defueled Emergency Plan.

You state that this plan is commensurate with the risk associated with the facility in its current defueled and non-operating condition. The staff has begun review of your revised plan. We understand that you plan to exercise your Permanently Defueled Emergency Plan during calendar year 1993.

ETIN #

9304070070 930329 rh~y,C43"(QLW3L PDR ADOCK 05000344 5,

ghi N'

P PDR u0f

o Mr. James E. Cross March 29, 1993 The Exemption is being forwarded to the Office of the Federal Register for publication. Copies of the related Safety Evaluation and the Environmental Assessment and finding of No Significant Impact are also enclosed.

Sincerely, Original signed by:

Michael T. Masnik, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation 1.

Exemption 2.

Safety Evaluation 3.

Environmental Assessment cc w/ enclosures:

See next page DISTRIBUTION:[TR0EP]

Docket Files BGrimes OGC PDRs SWeiss EJordan ONDD R/F EHylton GHill (2)

TMurley/FMiraglia MMasnik ACRS (10)

JPartlow RDudley OPA ERossi OC/LFDCB Region IV JLieberman SECY JMitchell,EDO

-l cc w/ enclosures:

p See next page gjY ONDD:PMld ONDD:S OGCM 0!

D D 'rhnes Of

. ton MMasnik:lb RDudley At/W1

~

SWeiss

/,d/93 3/2-)/93

_5 /g3/93 3/2J/93 y/y3/93

/p/93 t

l

~

o Mr. James E. Cross -

The Exemption is being forwarded to the Office of the Federal Register for publication. Copies of the related Safety Evaluation and the Environmental Assessment and Finding of No Significant Impact are also enclosed.

Sincerely.

hV C

i Michael T. Masnik, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation t

Enclosures:

1.

Exemption 2.

Safety Evaluation -

3.

Environmental Assessment cc w/ enclosures:

See next page k

e Mr. James E. Cross Trojan Nuclear Plant Portland General Electric Company Docket No. 50-344 a

cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant P. O. Box 250 Rainier, Oregon 9704B Mr. Michael J. Sykes, Chairman Board of County Commissioners i"

Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission l

1450 Maria Lane, Suite 210 Walnut Creek, California 94596 i

Mr. Tom Walt General Manager, Technical Functions Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 9704B Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, Oregon 97009 Mr. Jerry Wilson Do It Yourself Committee 570 N.E. 53rd Hillsboro, Oregon 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine BLilding 133 S.W. 2nd Avenue i

Portland, Oregon 97204

-r l

i i

.h

_