Notifies of Enforcement Discretion for Facility TS 3.4.10 Re Structural Integrity of Svc Water Supply Line to 480 Volt Vital AC Switchgear Room
ML20035C290
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/26/1993
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9304070010
Download: ML20035C290 (3)


Text

y k

a hfAR 2 g ;gg3 i

Docket No. 50-336 Mr. John F. Opeka Executive Vice President - Nuclear i

Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270 i

Dear Mr. Opeka:

I

SUBJECT:

NOTICE OF ENFORCEMENT DISCRETION FOR MILLSIDNE UNIT 2 TECHNICAL SPECIFICATION 3.4.10 REGARDING THE STRUCTURAL INTEGRITY OF THE SERVICE WATER SUPPLY LINE TO THE 480 VOLT VITAL AC SWITCHGEAR ROOM This letter refers to your staff's March 25,1993, telephone conversation with the NRC and followup letter, dated March 26,1993, in which you requested relief from the required l

actions in Technical Specification 3.4.10 at Milt. stone Unit 2. Specifically, discussions between the NRC and your staff during the week of March 22,1993, indicated that Unit 2 would not be in compliance with this TS regarding structural integrity due to a minor leak on a new socket weld on the service water supply line to the 480 volt vital AC switchgear room.

l Your staff provided as justification for continued operation that this leak was very minor,.

that it existed only at the ASME required hydrostatic test pretsure of 110 psig versus the normal system operating pressure of 38 psig, and that the weld porosity defect which allowed this leak did not affect the structural integrity of this line. In addition, your staffis currently 7

designing, fabricating and installing an " engineered clamp" to provide added assurance that i

the structural integrity of this line is maintained. Also, your staff will regularly inspect the

)

weld and could isolate the line if the weld failed. Existing procedures specify compensatory measures upon loss of cooling to the room. The installation of this clamp is expected to require approx.imately seven days to complete, during which time the NRC was requested to exercise enforcement discretion in this matter. This clamp will remain in-place until a permanent repair to the noted weld can be made during a future plant outage of 10 days or more scheduled on or before the next scheduled refueling outage at Unit 2.

Based on our review of your justification for continued operation including the compensatory measures identified above, we concluded that plant safety will not be compromised and we f

are satisfied that such action is in the best interest of public health and safety. Therefore, j

Region I elected to exercise discretion not to enforce compliance with TS 3.4.10 in this matter, and so informed Mr. J. Keenan of your staff during a telephone conversation at i

5:36 p.m., March 25,1993. This enforcement discretion will continue until you complete installation of the compensatory measure described, but no later than 5:36 p.m., on l

April 1,1993.

j PDR ADOCK'05000336

- /)I l l

9304070010 930326 P

PDR

\\

v i

4 S

A!AR 2 61993 Northeast Nuclear 2

Energy Company This decision does not preclude the NRC from considering enforcement action for the conditions that led to the need for this Notice of Enforcement Discretion. Please notify me immediately if your understanding differs from that set forth above.

Sincerely, ORIGINAL OIGNED SY.

James T. Wiggins, Acting Director Division of Reactor Projects l

Attachment:

Millstone Unit 2 Request for Enforcement Discretion, dated March 26,1993 cc w/ encl:

i W. D. Romberg, Vice President - Nuclear, Operations Services S. E. Scace, Vice President, Millstone Station J. S. Keenan, Nuclear Unit Director R. M. Kacich, Director, Nuclear Licensing G. H. Bouchard, Director of Quality Sen> ices Gerald Garfield, Esquire Nicholas Reynolds, Esquire Public Document Room (PDR)

Imal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) l i

NRC Resident Inspector State of Connecticut SLO

{

i I

4

^

i

D inr3 2 G E93 Nonheast Nuclear 3

Energy Company F

bec w/ encl:

^

Region I Docket Room (with concurrences)

DRS/EB SALP Coordinator DRSS SALP Coordinator J. Joyner, DRSS l

R. Blough, DRP l

L. Doerflein, DRP W. Raymond, SRI, Haddam Neck P. Swetland, SRI, Millstone V. McCree, OEDO G. Vissing, PM, NkR R. Barkley, DRP RI:DRP RI:DRP RI:DRP B kl Doerflein Blough 3/26/93 3/26/93 3/26 3

/