ML20035C286

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-352/93-08 & 50-353/93-08 on 930222-26. Informs That in General,Activities Were Found to Be Conducted Safely
ML20035C286
Person / Time
Site: Limerick  
Issue date: 03/29/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20035C287 List:
References
NUDOCS 9304070006
Download: ML20035C286 (3)


See also: IR 05000352/1993008

Text

a

/

.

..

t

-

t

MAR 2 91993

Docket Nos. 50-352

50-353

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-352/93-08 AND 50-353/93-08

'

This letter transmits the results of the Maintenance Inspection by Messrs. N. Perry,

W. Baunack, M. Buckley, T. Easlick and T. Kenny, from February 22 - 26,1993, at the

Limerick Generating Station, Limerick, Pennsylvania. The inspection focused on the -

observation of activities important to ensuring the public health and safety. Reviews of

documents and interviews of plant personnel were also performed.

i

In general, activities were found to be conducted safely. Programs for the control of

maintenance activities were found adequate, and weaknesses identified are being properly

addressed. In particular, the controls for planned, preventive maintenance on systems

requiring entry into an LCO, were found to be commensurate with NRC guidance. We will

continue to monitor these maintentcc activities to ensure that they result in improved safety.

Results of the inspection are described in the enclosed report and were discussed witn Mr. D.

Helwig, and other members of your staff at the conclusion of the inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

We appreciate your cooperation.

Sincerely,

ORIGli:AL SIGNED cy

EDWARD C. WENZitiGER

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

9304070006 930329

PDR

ADOCK 05000352

/1

I

G

PDR

//

l

,

_

i-

'

MAR 2 01993

.,

a+

Philadelphia Electric Company

2

Enclosures:

1.

NRC Region I Inspection Report 50-352/93-08 & 50-353/93-08

2.

Attachment A Februszy 22,1993 Meeting Handout

3.

Attachment B February 25,-1993 Meeting Handout

cc w/encls:

. J. Doering, Chairman, Nuclear Review Board

D. Helwig, Vice President - Limerick Generating Station

G. A. Hunger, Jr., Manager - Licensing Section

G. J. Madsen, Regulatory Engineer - Limerick Generating Station

Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Insp. Rpts.

NRC Resident Inspector, Limerick

Commonwealth of Pennsylvania

L

. ,

.

MARf 2 D 1993.

!

.c..

.

f

Philadelphia Electric Company

3

l

l

bec w/encis:

.l

!

. Region I Docket Room (with concurrences)

bec w/encls via E-Mail:

'

E. Wenzinger, DRP

C. Anderson, DRP

W. Baunack, DRS

,

J. Carrasco, DRS/EB SALP Coordinator

-i

Frank Rinaldi, NRR

V. McCree, OEDO

W. Hehl, DRP

W. Hodges, DRS

j

'

- R. Cooper, DRSS

i

J. Joyner, DRSS

B. Norris, DRP

T. Fish, SLO

l

'

J. Lyash, SRI-Peach Bottom

C. Miller, PDI-2, .NRR

,

D. Holody, EO

,

l

!

e

9

.

RI:]

RI:DRP

(}q

()Q

t

NPerry

CAnderson

EWenzinger

0

3F493

3/2993

-34[93

I

OFFICIAL RECORD COPY

!

,