Text
a
/
.
..
t
-
t
MAR 2 91993
Docket Nos. 50-352
50-353
Mr. D. M. Smith
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Correspondence Control Desk
P.O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT: COMBINED INSPECTION REPORT NOS. 50-352/93-08 AND 50-353/93-08
'
This letter transmits the results of the Maintenance Inspection by Messrs. N. Perry,
W. Baunack, M. Buckley, T. Easlick and T. Kenny, from February 22 - 26,1993, at the
Limerick Generating Station, Limerick, Pennsylvania. The inspection focused on the -
observation of activities important to ensuring the public health and safety. Reviews of
documents and interviews of plant personnel were also performed.
i
In general, activities were found to be conducted safely. Programs for the control of
maintenance activities were found adequate, and weaknesses identified are being properly
addressed. In particular, the controls for planned, preventive maintenance on systems
requiring entry into an LCO, were found to be commensurate with NRC guidance. We will
continue to monitor these maintentcc activities to ensure that they result in improved safety.
Results of the inspection are described in the enclosed report and were discussed witn Mr. D.
Helwig, and other members of your staff at the conclusion of the inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
We appreciate your cooperation.
Sincerely,
ORIGli:AL SIGNED cy
EDWARD C. WENZitiGER
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
9304070006 930329
ADOCK 05000352
/1
I
G
//
l
,
_
i-
'
MAR 2 01993
.,
a+
Philadelphia Electric Company
2
Enclosures:
1.
NRC Region I Inspection Report 50-352/93-08 & 50-353/93-08
2.
Attachment A Februszy 22,1993 Meeting Handout
3.
Attachment B February 25,-1993 Meeting Handout
cc w/encls:
. J. Doering, Chairman, Nuclear Review Board
D. Helwig, Vice President - Limerick Generating Station
G. A. Hunger, Jr., Manager - Licensing Section
G. J. Madsen, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) Insp. Rpts.
NRC Resident Inspector, Limerick
Commonwealth of Pennsylvania
L
. ,
.
MARf 2 D 1993.
!
.c..
.
f
Philadelphia Electric Company
3
l
l
bec w/encis:
.l
!
. Region I Docket Room (with concurrences)
bec w/encls via E-Mail:
'
E. Wenzinger, DRP
C. Anderson, DRP
W. Baunack, DRS
,
J. Carrasco, DRS/EB SALP Coordinator
-i
Frank Rinaldi, NRR
V. McCree, OEDO
W. Hehl, DRP
W. Hodges, DRS
j
'
- R. Cooper, DRSS
i
J. Joyner, DRSS
B. Norris, DRP
T. Fish, SLO
l
'
J. Lyash, SRI-Peach Bottom
C. Miller, PDI-2, .NRR
,
D. Holody, EO
,
l
!
e
9
.
RI:]
RI:DRP
(}q
()Q
t
NPerry
CAnderson
EWenzinger
0
3F493
3/2993
-34[93
I
OFFICIAL RECORD COPY
!
,