ML20035C246

From kanterella
Jump to navigation Jump to search
Forwards Listing of Nuclear Property Insurance Coverage in Effect at Facility as of 930401,detailing Present Level of Insurance & Sources of Insurance Applicable to Facility
ML20035C246
Person / Time
Site: Callaway 
Issue date: 04/01/1993
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2785, NUDOCS 9304060386
Download: ML20035C246 (4)


Text

1931 Chowcau Avenue Post Othee Bcx 149 St Lcua, IJsr.Du,i 63166 314 554-765D -

UNION Donald F. Schnell Etscruic se,so, ns e,es&,,t.

wa~,

33 April 1, 1993 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station P1-137 Washington, D.C.

20555 ULNRC-2785 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE REPORTING P

In accordance with established federal.

nuclear property insurance reporting requirements (10CFR50. 54 (w) ), the attached report provides the present level of insurance and the sources of the insurance which are applicable to the Callaway Plant.

Very truly yours, t

/

h i

Donald F. Schnell JMC/ dis Attachment 1

A K

O

r l.

h 1

F

+

1 cc:

T. _ A. Baxter, Esq..

i Shaw, Pittman, Potts & Trowbridge 2300 N.

Street, N.W.

Washington, D.C.

20037 I

i Dr. J.

O.

Cermak CFA, Inc.

18225-A Flower Hill Way Gaithersburg, MD 20879-5334 L. Robert Greger Chief, Reactor Project Branch 1

~I U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137' Bruce Bartlett Callaway Resident Office U.S. Nuclear Regulatory Commission RR#1 1

Steedman, Missouri 65077 L.

R. Wharton (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager,-Electric Department Missouri Public Service Commission P.O.

Box 360 Jefferson City, MO 65102' t

ll l

0 t

E

-a :

1 i

i l

bec::D. Shafer/A160.761 1

/QA Record (CA-758)

{

Nuclear Date E210.01-I DFS/ Chrono D..- F. Schnell J.

E. Birk

-J.

V.

Laux

~!

M. A. Stiller i

G.~L. Randolph R. J. Irwin P.-Barrett C. D. Naslund-l W.

R. Campbell A.

C. Passwater

+

D.

E. Shafer i

W. E. Kahl

.(

S. Wideman (WCNOC) j M. D. Archdeacon (Bechtel)

S.

E. Sampson I

NSRB (Sandra Dale) f i

i I

.j q

i ti

..i l

t I

i I

t t

'i h

6 I

l i

, - + -.

i o

1 e

UNION ELECTRIC COMPANY - CALLAWAY PLANT s

NUCLEAR PROPERTY INSURANCE - APRIL 1,1993 10 CFR 50.54(W) REPORTING REOUIREMENTS

{

b: accordance with established federal nuclear property insurance reporting requirements 110 CFR 50.54(W)], this is to advise that as of today, Union Electric Company has in force the

[

below listed coverages which are applicable to its Callaway Nuclear Plant.'

[

1.

Primary Nuclear Property Insurance a.

American Nuclear Insurers (ANI)

$ 365,000,000

b. Mutual Atomic Energy Liability '

135,000,000 l

i Underwriters (MAELU)

$ 500,000,000 i

2.

Excess Nuclear Property Insurance a.

Nuclear Electric Insurance, Ltd.

l (NEIL ID 51,325,000,000

b. ANI and MAELU 800,000,000 i

i

$2,125,000,000 Grand Total

$2,625,000,000 i

)-

K. A. Mollet Assistant Secretary

' l I

Dated: April 1,1993 I

KAM/bjl

-i i

-a

.