Forwards License Change Application 232 to License NPF-1, Relocating RETS from TS to ODCM & Pcp,Per GL 89-01.Revised ODCM, Including PCP Containing Relocated RETS Also Encl
ML20035B859
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/01/1993
From: Cross J, Walt T
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20035B860 List:
References
GL-89-01, GL-89-1, NUDOCS 9304050207
Download: ML20035B859 (2)


Text

ep t--

3

~ - -

M 1

k m

M M

FM M M COrttparty James E. Cross Vice President and Chief. Nuclear Officer n

April 1, 1993 Trojan Nuclear Plant C

Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear-Sirs:

License Change Application (LCA) 232 -

Relocation of. Radiological Effluent Technical Spec 1Lications.(RETS lin_AccDIdance with Generic _letler._B9-Q1 Attached is LCA 232 requer+ing amendment of Operating License NPF-1.

This LCA proposes to remove the RETS from the Trojan Technical Specifications and-relocate them to the Offsite Dose Calculation Manual and Process Control Program. This action is proposed in accordance with the guidance provided in. Generic Letter 89-01, " Implementation of Programmatic Controls for Radiological Effluent Technical Specifications in the Administrative Controls Section of the Technical Specifications and Relocation of Procedural Details of RETS to the Offsite Dose Calculation-Manual or Process Control Program".

In conjunction with relocating the RETS, this LCA also proposes to change the required frequency for submittal of the Radioactive Effluent Release Report from semiannually to annually. This change is consistent with an amendment to the requirements of Title 10 to the Code of Federal Regulations, Part 50.36a (10 CFR 50.36a) made in 1992 to reduce.the i

regulatory burden on licensees (57 FR 39353, August 31, 1992).

Attachment I provides a description of the changes, reason for the changes, and the no significant hazards consideration determination.

Attachment II is a copy of the current Technical Specification pages with the proposed changes annotated.

Attaci: ment III is a copy of the -revised Offsite Dose Calculation Manual 7

~

(including the Trojan Process Control Program) that contains the L

relocatei RETS.' The revised Offsite Dose Calculation Manual has been approved oy the Plant Review Board and Plant General Manager and will be

.rea,y for' implementation within 30 days of receipt of the proposed r

Technical Specification amendraent.

9304050207 930401

~

's r

-PDR ADOCK 05000344

)

{

P-PDR y

l 121 SW Salmon Street, Portland, OR 97204 i

'503/464-8897-

i t

i Document Control Desk April 1, 1993 Page_2 i

It should be noted that Portland General Electric Company (PGE) has ceased operation of the Trojan Nuclear Plant and the reactor has been-defueled. An LCA has been~ submitted to amend the Trojan Operat.'.ng License to a Possession Only License. After Nuclear Regulatory Commission approval, PGE will revise the Offsite Dose Calculation Manual to reflect the permanently defueled status of the Plant, r

Also attached is one signed copy of a Certificate of Service for LCA 232 to the Chief Executive of the County in which the facility is located and to the Director of the State of Oregon, Department of Energy.

I Sincerely,

{

O T. D. Walt-i for J. E. Cross

{

r Attachments i

c:

Mr. John B. Martin.

i Regional Administrator, Region V l

U.S. Nuclear Regulatory Commission

{

Mr. David Stewart-Smith

[

State of Oregon l

Department of Energy Mr. Kenno; Johnston NRC Senior Resident Inspector

[

Trojan Nuclear Plant j

+

l

[

?

E l

.