Informs That on 930326,approx 700,000 Gallons of Svc Water Discharged to Ground When 30-inch Diameter Pipe Burst. Engineering Analysis Will Be Conducted to Determine Cause of Break & Results Will Be Used to Prevent Recurrence
ML20035B770
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/31/1993
From: Stratman R
CENTERIOR ENERGY
To: Hall B
OHIO, STATE OF
References
NUDOCS 9304050094
Download: ML20035B770 (2)


Text

-GNTERE

~1 I

ENERGY

' PERRY NUCLEAR POWER PLANT Robert A. Strttruun uair Address:

- Pa BOX srt PERRY.CHIO 44081 VICE PRESIDENT

  • NUCLEAR ijojENTER RQDOM

-(216) 259-3737 March 31, 1993 PT-CEI/0 EPA-0176L Brian Hall Ohio EPA Northeast District Office 2110 E. Aurora Ed.

Twinsburg, Ohio 44087 Re: Perry Nuclear Power Plant OEPA Permit No. 3IB00016DD

Dear Mr. Hall,

In accordance with Part III, Section 12.C., this letter is serving as confirmation of a telephone report of a pipe break made to the State Essergency Response Commission on 3/26/93.

1.

The limitation which has been exceeded: No permit limitation has been-exceeded.~ This event is being reported under Part III, Section 12.A.1. -

"Any noncompliance which may endanger health or the environment'. Under

-normal conditions, the system involved in this event discharge ~s to outfall 3IB00016004, the plant discharge tunnel. 1: is monitored for water temperature, flow rate, and chlorine. Since the pipe break occurred upstream of any heat load'en the vater, there was no change in temperature.

from lake tenperature, which was 31.B'P.

The chlorination system did not operate during the time of the break. The flow rates at the break during.

the event vere estimated to range from approximately 100 rpm at 1315, to E

45,000 gpm at the time of the massive failure of the pine, at 1523.

2.

The extent of the exceedance: Approximately 700,000 gallons of service water vere discharged to the ~ ground.

3.

The cause of the event: A 30-inch diameter pipe carrying plant' service water from the pumphouse to the plant burst.

4.

The period of the event: Approximately 1315 to 1540 on 3/26/93.

5.'

If uncorrected, the anticipated time' the exceedance is arpected to continue: ' The service water system was shut off at 1540 on 3/26/93.

operenng carnoonies Ceverenc Electne tur,menng -

Totecc 6: son mmanka

.S.

k

.m

' s.

r

..I FY-CEI/0 EPA-0176 L j

OEPA' March 31, 1993 t

6.

Steps being taken to reduce,. eliminate and/or prevent recurrence of the exceedance: An engineering analysis vill be conducted to determine the cause of the break. The results of the analysis vill be used'to' prevent recurrence.

If you have questions or need more information, please contact Louise Barton at (216) 259-3737 ext. 5512.

i i

Sincerely,

?

i b

// /

/

Robert A. Stratman

- I RAS:LKB:ss cc: NRC Project Manager NRC Resident Inspector Office i

NRC Document Control Desk NRC Regiod III Bruce Miller - OEPA NEDO t

i 1

t t

I i

i 1

1 l

l m.,