F-a MAR 3 01993 CONFIRMATORY ACTION LETTER Docket No. 50-440 License No. NPF-58 CAL No. RIII-93-004 Centerior Service Company ATTN: Mr. R. A. Stratman Vice President Nuclear - Perry c/o The Cleveland Electric Illuminating Company 10 Center Road Perry, OH 44081

Dear Mr. Stratman:

SUBJECT:

CONFIRMATORY ACTION LETTER Pursuant to a telephone conversation between Mr. T. O. Martin of my staff and you on March 30, 1993, related to the service water line rupture which occurred on March 26, 1993, it is our understanding that you will take the following actions:

1.

Conduct an investigation to determine the cause of the service water line failure and to evaluate the decision making and communications associated with the event.

2.

Maintain documentary evidence of your investigation effort and make this available to the Augmented Inspection Team.

3.

Evaluate the service water line rupture in light of past service water and circulating water line (fiber glass lines) failures to determine if additional actions are necessary.

4.

Provide within 30 days to NRC Region III a documented evaluation of the above issues including corrective actions you have taken or plan to take.

None of the actions specified herein should be construed to take precedence over actions which you feel necessary to ensure plant and personnel safety.

CONFIRMATORY ACTION LETTER 9304050053 930330

\\b PDR ADOCK 05000440 S

PDR

1 CONFIRMATORY ACTION LETTER i

l l

Centerior Service Company 2

l 1

1 l

Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, and 10 CFR 2.204, you are required to:

i 1.

Notify me immediately if your understanding differs froa that set forth l

above, 1

2.

Notify me if for any reason you cannot complete the actions within the l

specified schedule and advise me in writing of your modified schedule in l

advance of the change, and i

l 3.

Notify me in writing when you have completed the actions addressed in i

I this Confirmatory Action Letter.

I Issuance of this Confirmatory Action Letter does not preclude issuance of an order formalizing the above commitments or requiring other actions on the part l

of the licensee.

Nor does it preclude the NRC from taking enforcement action i

l for violations of HRC requirements that may have prompted the issuance of this I

letter.

In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.

l The responses directed by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork l

Reduction Act of 1980, Pub. L. No.96-511.

l In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of l

this letter and its enclosures will be placed in the NRC Public Document Room.

I Sincerely, t

ORIGIN!d. S!GNED BY A. BERT D.WIS A. Bert Davis i

Regional Administrator See Attached Distribution

. Yes h

.l RIII RII.I RIII RIII R

t-W U

V Wh Be]rson W

0]

Lanksbury Gr9ger Martin f

Df5 orGreenman

@f/fj k2SID I

DFayptte Uf/)3 RIII RIII'

[

hi Mi ler CONFIRMATORY ACTION LETTER Q

f

0g CONFIRMATORY ACTION LETTER I

Centerior Service Company 3

t 3

Distribution CC:

F. R. Stead, Director, Nuclear Support Department D. P. Igyarto, General Manager, Perry Nuclear Power Plant X. P. Donovan, Manager, Licensing and Compliance Section S. F. Kensicki, Director, Perry Nuclear Engineering Dept.

H. Ray Caldwell, General Superintendent Nuclear Operations DC/LFDCB Resident Inspector, RIII Terry J. Lodge, Esq.

James R. Williams, State of Ohio Robert E. Owen, Ohio Department of Health A. Grandjean, Ohio Public Utilities Commission State Liaison Officer J. M. Taylor, EDO J. H. Sniezek, DEDR H. L. Thompson, DEDS T. E. Murley, NRR J. G. Partlow, NRR J. W. Roe, NRR F. J. Miraglia, NRR J. A. Zwolinski, NRR E. L. Jordan, AE00 i

J. Lieberman, OE J. R. Goldberg, OGC J. N. Hannon, NRR i

G. Grant, EDO J. E. Richardson, NRR H. J. Miller, RIII R. J. Strasma, RIII L. R. Greger, RIII R. D. Lanksbury, RIII bcc:- PUBLIC CONFIRMATORY ACTION LETTER i

w i

--