Grants Relief from Required Actions in TS 3.1.4.2, Rod Control Sys to Allow Continuous Rod Withdrawal of Individual Rod to Original Notch Position After Rod Fully Inserted by Manual Scram,In Response to 930323 Request
ML20035B557
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/26/1993
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Graham P
GULF STATES UTILITIES CO.
References
NUDOCS 9304020147
Download: ML20035B557 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _

  1. MCo UNITED STATES g

NUCLEAR REGULATORY COMMISSION yq 3 iM E

R EGloN IV k h '(

E 611 RYAN PLAZA DRIVE, SUITE 400 e

AR LINGTON, TEXAS 76011-8064 gv j teR 261993 Docket:

50-458 License:

NPF-47 Gulf States Utilities ATTN:

P. D. Graham i

Vice President (RBNG) l P.O. Box 220 St. Francisville, Louisiana 70775 i

SUBJECT:

NOTICE OF ENFORCEMENT DISCRETION FOR GULF STATES UTILITIES REGARDING RIVER BEND STATION By letter dated March 23, 1993, you requested relief from the required actions in Technical Specification 3.1. 4.2, " Rod Pattern Control System," to allow for continuous rod withdrawal of an individual rod to its original notch position after the rod was fully inserted by a manual scram from a partially inserted position; and Technical Specifications 3.10.2, "Special Test Exceptions - Rod Pattern Control System," and 3.1.3.2, " Control Rod Maximum Scram Insertion Times," to allow a control rod to be scrammed from a partially inserted position.

The purpose of this relief request was to allow performance of testing to help locate a leaking fuel rod.

Your staff indicated that the testing will be performed at approximately I

65 percent reactor power and would consist of individually scramming a control I

rod and then continuously withdrawing the control rod to return it to its original position. The relief from Technical Specification requirements is necessary to allow scramming of control rods that are not fully withdrawn and to allow continuously withdrawing the control rod to return it to its pretest j

position.

The licensee determined that bypassing the Rod Pattern Control System, required by Technical Specification 3.1.4.2 for this testing, does not pose any significant hazard to the health and safety of the public and will minimize the nodal power transient caused by the withdrawal of the control rod. Your staff also provided justification that the performance of this testing will be more conservative than testing under Technical Specification 3.10.2, since the rod pattern control system bypassed control rod will not be withdrawn past its pretest position and, thus, is less severe than that assumed in the safety analysis for scram insertion time testing.

Based on our review of your request and subsequent telephone discussions with your staff, we have concluded that plant safety will not be unduly compromised and we are satisfied that such action is in the best interest of the public health and safety. Therefore, it is our intention to-exercise discretion not to enforce compliance with Technical Specifications 3.1.4.2, " Rod Pattern Control System," 3.10.2, "Special Test Exceptions - Rod Pattern Control System," and 3.1.3.2, " Control-Rod Maximum Scram Insertion Times," as I(

D 9304020147 930326 PDR ADOCK 05000458

)

p PDR

-_-____--____-_--________-___-__--_s

Gulf States Utilities.

i described in your request, for the purpose of conducting the testing. The relief is granted for a period of 7 consecutive days, beginning from the first use of the relief from these Technical Specification requirements, and in any case the relief is not granted beyond 8 p.m. on April 9, 1993.

This action is taken in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, dated i

March 17, 1993.

This decision does not preclude the NRC from considering i

enforcement action for the conditions that led to the need for this Notice of Enforcement Discretion.

Please notify me immediately if your understanding differs from that set forth I

above.

l Sincerely, L7/lk

$$%T'k$Milhoan l

legional Administrator l

L) cC' f

Gulf States Utilities ATIN:

J. E. Booker, Manager-Nuclear Industry Relations P.O. Box 2951 Beaumont, Texas 77704

)

Winston & Strawn ATTN: Mark J. Wetterhahn Esq.

l 1401 L Street, N.W.

l Washington, D.C.

20005-3502 l

Gulf States Utilities l

ATTN:

Les England, Director i

Nuclear Licensing P.O. Box 220 St. Francisville, Louisiana 70775 Mr. J. David McNeill, III l

William G. Davis, Esq.

Department of Justice j

Attorney General's Office P.O. Box 94095 Baton Rouge, Louisiana 70804-9095

w V

Gulf States Utilities H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West.Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Cajun Electric Power Coop. Inc.

. ATTN: Philip G. Harris-10719 Airline Highway P.O. Box 15540 Baton Rouge, Louisiana 70895 Hall Bohlinger, Administrator Radiation Protection Division P.O. Box 82135 L!

Baton Rouge, Louisiana 70884-2135 l

r f

a

?

f 5

-i I

.=

Gulf States Utilities MAR 2 61993 bcc to DMB (IE51) bcc distrib. by RIV:

J. L. Milhoan Resident inspector DRP Section Chief (DRP/C)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System ORSS-FIPS RSTS Operator RIV File Section Chief (DRP/TSS)

DRS Senior Resident inspector, Cooper r

k t

k h

AI 93-089E

, [/1 Pi D@ph

  • RIV:PE:DRP/C *C:DRP/C
  • AD:NRR RP D

Al h JMMg t overy Llilhoan EEcollins;df JEGagliardo MJVirgilio 3/ /93 3/ /93 3/ /93 3/lG/93 3j/(f93 3 4,(/93

  • previously concurred

1 f

l

/

/

Gulf States Utilities MAR 2 61993 bec td:DMB (IE51)..

bec distrib. by RIV:

J. L. Milhoan Resident Inspector r

DRP Section Chiei (DRP/C)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RSTS Operator RIV File Section Chief (DRP/TSS)

DRS Senior Resident Inspector, Cooper i

i 6

AI 93-089E

. -...'k DR.A... J[. y P'...

  • RIV:PE:DRP/C *C:DRP/,C
  • AD:NRR D

RP ce

.,,,...se

.