ML20035B443

From kanterella
Jump to navigation Jump to search
Amend 192 to License DPR-49,revising TS by Changing Surveillance Interval for Source Range Monitor Functional Test
ML20035B443
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/29/1993
From: Pulsifer R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20035B444 List:
References
NUDOCS 9304010375
Download: ML20035B443 (4)


Text

- -

+ '

  1. ,p ur o,

UNITED $TATES NUCLEAR REGULATORY COMMISSION n

r, aj wasmucion. o. c.20sss

's

,o 3

J0WA ELECTRIC LIGHT AND POWER COMPANY CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET NO 50-331 i

DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE j

Amendment No. 192 License No. DPR-49 t

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Iowa Electric Light and Power Company, et al., dated January 29, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements-have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of facility Operating License No. DPR-49 is hereby amended to read as follows:

?

9304010375 9303257 DR ADOCK 0500 1

-2_

(2)

Technical Specifications The Technical Specifications contained in Appendix'A, as revised through Amendment No.192, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of the date of issuance and shall be 1

implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

Robert M.

ulsif, Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V i

Of fice of Nuclear Reactor Regulation t

Attachment:

-I Changes to the Technical Specifications l

Date of issuance: March 29, 1993 t

h i

I l

1

l ATTACHMENT TO LICENSE AMENDMENT NO. 192 l

l FACILITY OPERATING LICENSE No. DPR-49 DOCKET NO 50-331 Replace the following page of tb Appendix A Technical Specifications with the enclosed page. The revised aret3 are indicated by marginal lines.

Remove Insert 3.9-5 3.9-5

}

,/'

MFO B.

DAEC-1 6

1 During CORE M ILLANCE shall ALTERAT RE be OPERABLE ION B.

U2REMENTS core quadrant S

two SRMs control rods re fuel one in the f_gyr_q_ZpgniloliILg o

whe one in 1

\\

are being mo an ex The SRMs r

adjacent cept as S

specified

ved, tested shall 3.pecifications 3. 9.Bquadra t, and and we kly therprior to COREbe functio n

9.B.3 in e

considered Fo CORE OP n SRM 2ad r a n

satisfied:following condiERABLE, theto beALTERATIONSeafterALTERATIONS y

are as long tio underw y as ns shall f

a be a.

The SRMs no shall special movablrmal operating lbe inserted detectors du i evel.

to the ng COREe, dunking type in pla (Use r

of ce permi ssibl eof no detectors isALTERATION rm l detecto a

connectedas long as the S

rmal r is no SRM circuit b,

.)

to the The SRMs 3 eps shall ins with all have a erted minim 2

in therods fully um of Prio cor.

e r to

\\

SRMs spiral unloadin statedshall i

be prov

\\

howev in Spe ificati g, the er, during spir len OPERABLE c

i the as 2

co on unt rate s 3.9.B.1 The SRME

\\

eps a

remaining in thwhen the la t bmay drop below 3 unloading ;

neutro shall n

be s

surround fuelu loading andresponse priochecked n

undles

\\

e u loaded. the SRMs core that n

for Prio are being is in thedaily as lo gspiral r to

\\

3 core.

n i

fo r to 3

as ur fu l asspiral r loadin e

e I

in thepreviously ac semblies g,

which two to cumulated expos next reacto hav to r

e shall obtain theeach of the 4 be lo dedure

\\

these a

required SPE as loaded, the 3senblies have b3 cps.s to

\\

not een Until necessary. eps requireme t

\\

n is

\\

\\

\\

\\

\\

\\

\\

\\

\\

\\

2npMEnT 7E6.192 3 9-s p-