Notification of 930407 Meeting W/Task Force IEEE STD.765 in Rockville,Md to Discuss Interpretation of Requirements of GDC-17 of App a to 10CFR50.Meeting Agenda Encl
ML20035B390
Person / Time
Issue date: 03/19/1993
From: Trehan N
Office of Nuclear Reactor Regulation
To: Berlinger C
Office of Nuclear Reactor Regulation
References
NUDOCS 9304010277
Download: ML20035B390 (4)


Text

.

p'^ "5G%

3*

UNITED STATES n

i NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20556

/

March 19, 1993 MEMORANDUM FOR:

Carl H. Berlinger, Chief Electrical Engineering Branch Division of Engineering Nuclear Reactor Regulation FROM:

Narinder K. Trehan, Engineer Electrical Engineering Branch Division of Engineering Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH TASK FORCE IEEE STD. 765 ON THE INTERPRETATION OF GDC-17 DATE AND TIME:

April 7, 1993 (10 a.m. - 3 p.m.)

LOCATION:

Room No. 6B13, White Flint Bldg.

PURPOSE:

Interpretation of the requirements of GDC-17 of Appendix A to 10 CFR Part 50.

PARTICIPANTS *:

NRC TASK FORCE IEEE STD. 765 C. H. Berlinger R. V. Rebbapragada P. Gill R. Wernoick E. Weiss et al.

D. Thatcher

0. Chopra J. Lazevnick J. Knox N. Trehan i

ow Narinder K. Trehan, Engineer Electrical Engineering Branch Division of Engineering Nuclear Reactor Regulation

Enclosures:

Meeting Agenda i

/

- }

</

._,a cc w/ enclosures:

See next page 7, ~

\\

y'

,_ _., -,) /' / < O O b llN b

']

  • ]nnn 9304010277 930319

'~ PDR ORG NRRD

k a cc: Mr. R. V. Rebbapragada Floor No. 89 Ebasco Services Inc 2 World Trade Center New York, NY 10048 1 1 t h a . I 9 h I i l I v

4 Enclosure r AGENM

SUBJECT:

Interpretation of GDC-17 DATE: April, 7, 1993 PLACE: Room No. 6B13 White Flint Building US NRC TOPICS FOR DISCUSSION: Presentation by the IEEE Working Group on the results of survey performed on the preferred power supply design of Select Nuclear Power Plants. Presentation by NRC on clarification given to licensees / applicants regarding interpretation of GDC-17: - Pre 10 CFR 50 Appendix A licensed plants - Post 10 CFR 50 Appendix A licensed plants - Proposed ALWR/ELWR plants; ABWR, CE80 - Proposed Passive plants; AP-600, SBWR, Pius Clarification on " loss of all onsite ac power sources" with regards to GDC-17. To quantify the time period during which a licensee / applicant should i enable a delayed access source. NUMARC guidelines on station blackout (SBO) coping analyses with f respect to independence of preferred power supply. Does it apply to the delayed access source within the context of GDC-17. Sizing criteria for delayed access _ power source. LOCA loads of one i train only or LOCA loads of two trains. Generator MOD switch. Open discussion Summation and Conclusions. h

March 19, 1993 t

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners,'intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 20858, June 28,.1978. Members of the public who wish to attend should contact me at (301) 504-2777.

h } DISTRIBUTION: Central File. WRussell EWeiss 0Chopra PDR JERichardson DThatcher JLazevnick l EJordon, MNBB 3701 BDLiaw PGill JKnox g B g Room CHBerlinger NTrehan DE R/F M r ) I i i i / EELB/DE BC NTrehaM CHBerli er 3/19/1993 3/ /1993 i . -.}}