.'YANKEEA TOMIC ELECTRIC COMPANY
""$&"',1 "jo'[g*;"l" w% o N
- h
)
580 Main Street, Bolton, Massachusetts 01740-1398
.YAN KEE,/
March 25,1993 BYR 93-022 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attention:
Mr. Morton Fairtile Senior Project Manager l
Non-Power Re.ictors and Decommissioning Project Directorate Division of Operating Reactor Support i
References:
(a)
License No. DPR-3 (Docket No.50-029)
(b) letter, H. Tracy, Yankee Atomic Electric Company to M. Fairtile, U.S. Nuclear Regulatory Commission, dated March 5,1993
Subject:
USE OF DECOMMISSIONING FUNDS
Dear Mr. Fairtile:
In Reference (b), Yankee Atomic Electric Company (YAEC) requested that the Nuclear Regulatory Commission (NRC) approve YAEC's use of decommissioning funds for the planned removal of the steam generators, pressurizer, and reactor internals. In subsequent conversations with the NRC, the Staff indicated that additional information was required regarding the 53 million cost estimate for returning the Yankee Nuclear Power Station (YNPS) to a SAFSTOR condition during the planned component removal project.
In response to the Staff's need for additional information, we are providing the attached table which identifies the scenario used to determine the maximum estimated cost of returning YNPS to a SAFSTOR condition during the planned component removal project and the estimated cost for each step of the scenario.
l' As stated in Reference (b) and as indicated in the attached table, the estimated cost for placing YNPS into a SAFSTOR condition is $3 million, including a 50% contingency. The YNPS decommissioning trust fund balance is 574.6 million (as of the end of February 1993).
We anticipate that at no time during the planned component removal project will the_
balance of the trust fund be less than that amount.
1 930331'0i6 930325 k, I DR ADOCK 05000029 v
i 1
U.S. Nuclear Regulatory Commission Page 2 i
i trust that the information provided satisfies your needs for review and approval of our March 5,1992 request. It is critical to the project that NRC approval be granted by April 16,1993, as substantial payments to the Southeast Compact and contractors must be l
made at that time. YAEC's goal continues to he to conduct the planned component i
removal project in a safe and economical manner. To that end, it is important that decommissioning trust funds, rather than operating and maintenance monies be used for these legitimate decommissioning activities. Therefore,if you should have any questions regarding the information provided, please call me immediately at 508-779-6711.
?
Sincerely, YANKEE ATOMIC ELECTRIC COMPANY L
Mr i
[.
j I1. T. Tracy, Jr.
Vice President, Treasurer, and 2
Chief Fmancial Officer j
I L
Attachment f
i c:
R. Dudley, NRC, NRR E. Kelly, NRC Region 1 l
COMMONWEALTil OF MASSACllUSE'ITS) l
)ss l
WORCESTER COUNTY
)
4 j
Then personally appeared before me, II. T. Tracy, Jr., who, being duly sworn, did' i
state that he is a Vice President, Treasurer, and Chief Financial Officer of Yankee Atomic Electric Company, that he is duly authorized to execute and file the foregoing document in the name and on behalf of Yankee Atomic Electric Company and that the statements j
therein are true to the best of his knowledge and belief.
La 2 n ta ri(LVA
?,9& ctg lielen D. Sammarco Notary Public i
l My Commission Expires October 16,1998
a t
1 i
i NITACHMENT l
Cost Estimate to Return YNPS to SAFSTOR.
1 i
3 Activity Description Estimated Cost, kS l
Return steam generators and pressurizer to YNPS from Barnwell, SC 980
.E Construct onsite storage facility for steam generators and pressurizer 600 Return one cask containing reactor internal components to YNPS from 90 Barnwell, SC and demobilize reactor internal component work effort i
Radiation protection support 130 Engineering support 200 Subtotal 2,000 Contingency (50%)
1,000 Total 3,000 Note:
The cost estimate presented above are in addition to costs included in the component removal project cost estimate.