I UNITED STATES j
g NUCLEAR REGULATORY COM. MISSION r,
- y WASHING 10N, D. C. 20$55 l
\\
/
- .++
March 23, 1993 Project No. 683 l
ORGANIZATION: Babcock and Wilcox Owners Group (BWOG) l PROJECT:
BWOG Generic License Renewal Program
SUBJECT:
SUMMARY
0F MEETING BETWEEN U.S. NUCLEAR REGULATORY COMMISSION
{
STAFF AND BWOG REPRESENTATIVES TO DISCUSS BWOG GENERIC LICENSE-RENEWAL PROGRAM STATUS AND THE BWOG SYSTEM / STRUCTURE-SCREENING l
METHODOLOGY REPORT (MARCH 16,1993)
On March 16, 1993, representatives of the U. S. Nuclear Regulatory Commission (NRC) and representatives from the Babcock and Wilcox Owners Group (BWOG) i Generic License Renewal Program met in Rockville, Maryland, to discuss the-status of the BWOG Generic License Renewal Program and discuss the recent BWOG i
submittal concerning their proposed system / structure screening methodology.
Enclosure I contains a list of meeting attendees. contains copies j
of presentation material discussed at the meeting.
j 1
Ms. Staudinger, the Program Coordinator for the BWOG Generic License Renewal
-l Program (GLRP), presented an executive overview on the status of the GLRP.
t She indicated that the BWOG expected to submit several more reports to the NRC staff for its re' view in 1993. The next series of submittals would likely concern component screening methodology and provide-examples of screening l
results. Ms. Staudinger discussed a draft of the BWOG GLRP. process flowchart for conducting an integrated plant assessment.
The staff was particularly interested in the proposed use of risk significance and the use of the aging mechanism evaluations. The staff expressed l
significant reservations about the use of risk significance as depicted _in the process flowchart. BWOG representatives indicated that this proposed process was still preliminary and that the use of risk significance was not intended to eliminate any systems, structures, or components from consideration. BWOG representatives emphasized that they expected the majority of systems, structures, and components will be dispositioned in the license renewal i
assessment process through an effective program evaluation.
j t
The NRC staff and BWOG representatives discussed the BWOG's recent submittal i
['
entitled, " Integrated Plant Assessment -- System / Structure Screening 5
Methodology."
In general, the' staff indicated that more detail would be
-l required to make a substantive conclusion regarding.the submittal. 'The NRC staff and BWOG representatives agreed that additional discussions would be
{
appropriate after the staff reviews the BWOG component. screening methodology and the results from the several plant-specific screenings.
l i
260128 RETURN "O KLAIDRY CBN. ES 4f"gMi u
1
~
9303310019 930323
.I i
6'
1 The NRC staff stated that they anticipated sending comments and questions on the BWOG system / structure screening methodology to the BWOG by the first week of April 1993. The next meeting to discuss the status of the BWOG GLRP has been tentatively scheduled for April 13, 1993.
Origiml sigmd by; l
Thomas G. Hiltz, Senior Project Manager License Renewal And Environmental Review Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosures:
i 1.
Meeting Attendees 2.
Presentation Material DISTRIBUTION:
Docket File PDR PDLR R/F TMurley/FMiraglia, 12G18 JPartlow,12G18 WTravers, 11H21 SNewberry,11F23 FAkstulewicz, llF23 LLuther, 11F23 THiltz, llF23 EJordan, MNBB3701 OGC NRC Participants ACRS (10)
JHopkins, 13E21 H
GGrant, 17G21 SDroggitis, 3D23 JVora, NLS217B
/
PDLR:SC((b PDLRi PDLR:LA PDLR:SPM LLuther g THilt h FAkst M h SNebberry 3/pd 93 3/71/93 3/)9/93 3/9/93 V6 0FFICIAL DOCUMENT COPY:
HILTZ MEETING SUM 3.16 t
i f
?
I
]
Project No. 683 i
NRC/BWOG Meeting l
Generic License Renewal Program US Nuclear Regulatory Commission l
One White Flint North Room 2-F-17/2-F-21 Rockville, Maryland j
March 16, 1993
-i List of Attendees Name Title and Affiliation 1
Frank Akstulewicz Section Chief, NRR/PDLR j
Raj Anand Project Manager, NRR/PDLR i
Samuel F. Armour Project Manager, DOE-Idaho Kamal Bandyopadhyay Brookhaven National Laboratory Robert Borsum BWNS l
Fred R. Burke BWNS Jim Christensen Pacific Northwest Laboratories Lynn Connor Southern Technical Services
- Leo J. Defferding Manager, Pacific' Northwest Laboratories Eve Foutopoulos SERCH Licensing, Bechtel Donald N. Fultonberg Project Engineer, BWOG/GPUN -
l Nigel S. Goulding Lead Systems Engineer, BWNS Tricia Herouy Electric Power Research Institute
}
Thomas Hiltz Senior Project Manager, NRR/PDLR Steve Hoffman Senior Project Manager, NRR/PDLR l
Jon Hopkins Senior Project Manager, NRR/DRPW Debr. rah A. Jackson Mechanical Engineer, NRR/PDLR
' I P.T. Kuo Section Chief, NRR/PDLR Chang Lewe NUS Corporation Charles E. Meyer License Renewal Program Coordinator, WOG John Moulton Project Manager, NRR/PDLR Thomas Murley Director, NRR' Rebecca Nease Senior Project Manager, NRR/PDLR Scott Newberry Director,NRR/PDLR
. William T. O' Conner Project Engineer, BWOG/ Toledo Edison Ron Parkhill Senior Mechanical Engineer, NRR/PDLR i
Mark A. Rinckel BWOG Gregory D. Robison Senior Engineer, BWOG/ Duke Power Vincent R. Roppel Project Engineer, BWOG/ Florida Power Corp.
. Jeff Sharkey Senior Operations: Engineer, NRR/PDLR Deborah K. Staudinger BWOG David Tang NRR/PDLR William Travers Deputy Associate Director, NRR/ADAR
.4 Jit Vora Section Leader, RES/EMEB j
Doug Waters NUMARC j
Philip Wheatley Manager, Idaho National Engineering. Laboratory.
i 1
ENCLOSURE 1-w ma m
e%
n
,e y
y
i i-GLRP REPORT SCHEDULE i.
DRAFT TO pes TO NRC 1
- System Screening Methodology Complete 3/4/93 i
- Component Screening Methodology 3/25/93
- Example System Screening Results 6/1/93 l
- ARDM Report 5/15/93
- Component Evaluation Methodology 6/15/93 I
(includes Effective Program and I&C Effective Program Methodology)
- Component Evaluations To Test Methodology
-- Commodity-4 inch 7/15/93 Manual Gate Valves
-- DHR Cooler 7/15/93
- Other Technical Reports 1993
-- RC Pump
-- Batteries
-- Structure (Auxiliary Bldg)
-- Reactor Vessel
-- Pressurizer Heaters
-- RCP Motor ENCLOSURE 2
- - t
1 I
i BWOG/GLRP PROCESS FLOWCHART FOR IPA i
/
/
i
/,, _,,,, f
\\
\\
i t
- !EJIs*IwD
" "'"s$.*i
't',*,*
p
~
k x..._. \\
=,
l l
4 M2tprpe@
r I
N -..
\\
=,
l 4
i tc= l
{.
(
)
1 A_
v i
.A
'*F 085W bel hh
%9 WIvede g,en en==.m
. i
"<=.*:.
m=D TEy'l
'- nD
'-- a :' -
4 i
e
=v !
x._-\\
i I
i
-