ML20035A849
| ML20035A849 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck, Millstone File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 03/24/1993 |
| From: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| RTR-REGGD-1.012, TASK-DG-1015, TASK-DG-1016, TASK-DG-1017, TASK-DG-1018, TASK-RE B14418, NUDOCS 9303300045 | |
| Download: ML20035A849 (2) | |
Text
T
.4 4'
i I
N t#TILITIES cenerei Oitices. seioen street, serun, connecticut l
- r 5 a P.O. BOX 270 i
"'^"" * " " " *'
HARTFORD, CONNECTICUT 06141-0270 i
k J NE$[12,cC, (203) 665-5000 l
i March 24, 1993 i
Docket Nos. 50-213 i
50-245 50-336 50-423 B14418 Regulatory Publications Branch l
Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos.1, 2, and 3 Comments on Draft Regulatory Guide DG-1015, DG-1016, DG-1017, DG-1018, 10CFR Part 100, Proposed Appendix B and i
Draft Standard Review Plan 2.5.2 j
The _ purpose of this letter is to provide the NRC with Connecticut Yankee i
Atomic Power Company (CYAPCO) and Northeast-Nuclear Energy Company (NNECO) t comments' on draft Regulatory Guides DG-1015,
" Identification and i
Characterization of Seismic Sources, Deterministic Source Earthquakes, and Ground Motion;"
DG-1016,
" Nuclear Power Plant Instrumentation for Earthquakes;" DG-1017, " Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Postearthquake Actions;" DG-1018, " Restart of a Nuclear Power Plant Shut Down by a Seismic Event;" 10 CFR Part 100, Proposed Appendix B,-
'i
" Criteria for Seismic and Geologic Siting of Nuclear Power. Plants;" and draft Standard Review Plan, section 2.5.2, " Vibratory Ground Motion."
On behalf of the Haddam Neck Plant' and Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3, CYAPC0 and NNEC0 have reviewed these documents and together l
with Yankee Atomic Electric Company (YAEC), have' developed comments on these drafts. CYAPCO, NNEC0, and YAEC collaborated to develop detailed comments and '
corresponding alternate proposals for these draft documents'. CYAPC0 and NNECO firmly support the comments which have been transmitted by YAEC under separate cover on these issues and believe that these proposals will better serve 'the nuclear industry relative to seismic issues.
3 d
-i i
290081-j 9303300045 930324 PM ADOCK 05000213 i
P pg Jool os m u v. u a Il o.
-d U.S. Nuclear Regulatory Commission B14418/Page 2 March 24, 1993
[
We appreciate the opportunity to participate in the comment process.
If you should have any comments, please contact my staff.
Very truly yours, i
CONNECTICUT YANKEE ATOMIC POWER COMPANY NORTHEAST NUCLEAR ENERGY COMPANY 0iA c
J. F. Opekaw U
Executive Vice President cc:
T. T. Martin, Region I Administrator A. B. Wang, NRC Project Manager, Haddam Neck Plant J. W. Andersen, NRC Acting Project Manager, Millstone Unit No.1 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 D. H. Jaffe, NRC Project Manager, Millstone Station W. J. Raymond, Senior Resident Inspector, Haddam Neck Plant P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 U.S. Nuclear Regulatory Commission Attn: