ML20035A568
| ML20035A568 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 03/23/1993 |
| From: | Anderson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9303290032 | |
| Download: ML20035A568 (2) | |
Text
.-
IARR 2 3 933 8-U. S. NUCLEAR REGULATORY COMMISSION 93-37 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Philadelphia Electric Company j
Facility:
Peach Bottom Units 2 and 3 Limerick Units I and 2 Docket Nos:
50-277 and 50-278
[
50-352 and 50-353 t
Date and Time:
March 30,1993 at 1:00 p.m.
Location:
U.S. Nuclear Regulatory Commission Region I Office l
DRP Conference Room i
Purpose:
Meeting to Discuss Recent Licensee Nuclear Group Senior Management Changes Resulting From the Implementation of the Nuclear Effectiveness and Efficiency Design Study (NEEDS).
NRC Attendees:
T. Martin, Regional Administrator W. Lanning, Acting Deputy Division Director, Division of Reactor Projects (DRP)
W. Hodges, Division Director, Division of Reactor Safety (DRS)
R. Cooper, Division Director, Division of Radiation Safety and Safeguards (DRSS)
)
E. Wenzinger, Chief, Reactor Projects Branch No. 2, DRP J. Durr, Chief, Engineering Branch, DRS l
C. Anderson, Chief, Reactor Projects Section 2B, DRP
.j J. Lyash, Senior Resident Inspector, Peach Bottom N. Perry, Senior Resident Inspector, Limerick l
C. Miller, Project Director, Office of Nuclear Reactor Regulation (NRR) l J. Shea, Acting Project Manager, NRR a
Licensee Attendees: D. Smith, Senior vice President-Nuclear
[
D. Miller, Vice President, Peach Bottom Atomic Power Station j
D. Helwig, Vice President, Limerick Generating Station j
l G. Rainey, Vice President, Nuclear Senices Department Note: This meeting is open to the public. Attendance bv NRC personnel at this meeting should be made known by 4:00 p.m., March 29,1993, via telephone call to Cliff Anderson, Region I, at FTS S-215-337-5227. Handicapped persons requiring assistance to attend or participate in l
the meeting shall make their requests known to Cliff Anderson, Chief, Reactor Projects Section, j
U. S. Nuclear Regulatory Commission, Region I,475 Allendale Road, King of Prussia, PA.,
j 19406, (215) 337-5227 no later than five buisness days prior to the meeting.
066 nt52 M W g[2 OON
$$o$$n Clifford J. Anderson, Chief RPS 2B P
PDR l
I D l
a
a x
..s
.-..s-
-e s
z.._-...a
~..
=
.,a-a
..y n
g k. 3; i
j z,4 2
Distribution: (Via E-Mail)
J.M. Taylor, Executive Director for Operations (EDO) i J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
)
T. E. Murley, Director, Office of Nuclear Reactor Regulation j
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
J. Lieberman, Director, Office of Enforcement l
B. Grimes, Director, Division of Operating Reactor Suppon, NRR C. Rossi, Director, Reactor Inspection & Licensee Performance, NRR W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR
- 3. Partlow, Associate Director for Projects, NRR S. S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR l
V. McCree, Regional Coordinator. OEDO i
N. Green, Jr., Policy Development and Technical Support Branch l
S. Bajwa, RPEB, NRR i
S. Lewis, Office of the General Counsel (OGC)
=
C. Miller, Director, Project Directorate I-2, NRR J. Shea, Project Manager, Peach Bottom, PD I-2, NRR J. Lyash, SRI l
SRI, Limerick
(
Region I Branch Chiefs
' [
Region I Section Chiefs l
K. Abraham, Public Affairs Officer, RI l
l T. Fish, State Liaison Officer, RI i
y T. Darden, State Agreements Officer, RI K. Smith, Regional Attorney, RI l
4 D. Screnci, Field Public Affairs Officer, RI i
D. Holody, Enforcement Officer, RI j
B. Letts, Office of Investigations, Region I Field Office j
J. Lanning, DRP, RI j
i Computer Assistant, DRMA, RI
~
Distribution:
I Public Document Room (PDR)
. I j
local Public Document Room (LPDR) f s
j D.M. Smith, PECo l
State of Pennsyhania j
RA Secretary, RI j
DRP Division Secretary, RI i
DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No. I, Secretary, RI
. t Re ion I Receptionist C
(L
'RI DRP i
R DRP CAnderson
$W5nzinger
]j 3/3V93 3/j^'H93 OFFICIAL RECORD COPY j
s
-. -