Text
70-/37 b
e l
=./
ggggggpgg INGELH ARD C ORPOR ATION e
4 ENGINELRID M AllR!Als GROUP '
i ROUTE 152 Pt ANVRLE. M A% ACHU5fil5 0r62 (5M6 657811 Tl LI h 92-76W t
March 11, 1993 Mr. Jack Parrott USNRC One White Flint North 11555 Rockville Pike Rockville, Md 20852
Dear Mr. Parrott:
In our meeting in January, Engelhard mentioned it's intent to submit draft plans for decontamination of the interior of the buildings and characterization of the site to the NRC in 4-6 i
weeks.
However, additional time is required to complete the drafting of these plans.
Therefore, it is Engelhard's intention s
to submit these plans for your review by the end of the week of
arch 2 9.
If you have any questions, please contact me at (508) 695-7811 ext. 390.
Yours truly, 774Yh kJ Donald P.
Chabot Senior Environmental Engineer cc:
R.
Brackett, EPA J.
Chormann, MA DEP i
9303260038 930311 DR ADOCKlO7000139 I
\\) D /
u