Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-336/92-26
ML20035A413
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/18/1993
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9303260028
Download: ML20035A413 (2)


See also: IR 05000336/1992026

Text

-

,

!

,,

,

.,

MAR 181993

s

i

L

i

!

Docket No. 50-336

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

i

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT: INSPECTION NO. 50-336/92-26

This refers to your February 19,1993, correspondence in response to our

1

February 10, 1993, telephone conference.

Thank you for informing us of the corr:ctive and preventive actions documented in your

letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

i

Marvin W. Hodges, Director

Division of Reactor Safety

j

l

-!

OFFICIAL RECORD COPY

G:M29226R

9303260028 930318-

PDR

ADOCK 05000336

,

I

o

. . . -

.l

_

t

-

MAR 181993

,

Mr. John F. Opeka

2

cc:

i

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

l

i

J. S. Keenan, Nuclear Unit Director

'

R M. Kacich, Director, Nuclear Licensing

D. O. Nordquist, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2) (w/ copy ofletter dated February 19, 1993)

l

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

i

NRC Resident Inspector

State of Connecticut SLO (w/ copy of letter dated February 19, 1993)

i

!

bec'

Region I Docket Room (with concurrences)

i

J. Durr, DRS

!

J. Joyner, DRSS

R. Blough, DRP

!

M. Modes, DRS

L. Doerflein, DRP

DRS/EB SALP Coordinator

l

DRSS SALP Coordinator

W. Raymond, SP! Haddam Neck

,

-

P. Swetland, SRI, Millstone

V. McCree, OEDO

G. Vissing, PM, NRR

t

R. Barkley, DRP

.

DRS File

,

i

!

,

I

CD _

A{}.

w -

.

RI:DRS

RI:DRS

l

h

es/dmg

Durr

Ho

Ak

/

03/09/93

03//p93

03/g/93

i

OFFICIAL RECORD COPY

G:M29226R

'

i

t

i

f

.

-

_ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,s

-s

..

.

.

NORTHEAST UTILtTIES

cenni On.ces . semen sneet Bee. Connecuea

P.O. BOX 270

l

l

5

ns

HARTFORD. CONNECTICUT 06141-o270

7]*]*, ,*{**1

7

3

-

k

'IJ

(203) 665-5000

m.n

.s, -

%,a

,

February 19, 1993

Docket No. 50-336

B14380

.

Re:

10CFR2.201

Mr. Thomas T. Martin

Regional Administrator, Region I

I

U.S. Nuclear Regulatory Commission

,

475 Allendale Road

-

~

King of Prussia, PA 19406

Dear Mr. Martin:

l

Millstone Nuclear Power Station, Unit No. 2

l

Inspection Report No. 50-336/92-26

Reply to a Reouest for Additional Information

In a letter dated December 4, 1992,5 the NRC Staff transmitted the results of

several

inspections associated with the steam generator replacement at

Millstone Nuclear Power Station, Unit No. 2.

The Staff identified two

Severity Level

V violations regarding nondestructive examination

(NDE)

The first violation was associated with the

perforced using radiography.

failure to identify and disposition a linear indication on the radiographic

The second violation identified failure to follow the radiography

report.

procedure regarding back scatter of radiation during radiography.

1

In a letter dated January 13, 1993,'*8 Northeast Nuclear Energy Company (NNECO)

l

'

our reply to the Notice of Violations (NOV) pursuant to the

provided

Subsequently, in

.

provisions of 10CFR2.201, contesting both of the violations.1993, NNECO and NRC Region

a telephone conference on February 10,During that discussion, the Staff agreed that

discussed details of the issue.

the indications had no safety implications, but could be indicative of a

NNECO stated that

decrease in the quality of our NDE inspection program.

although we believe that our NDE program quality remains strong, we recognize

~

the potential benefit of additional enhancements.

Accordingly, NNECO hereby

.

(1)

J.

P. Durr letter to J.

F. Opeka, "NRC Inspection of Unit 2 Steam

Generator Replacement, NRC Region I Inspection Report No. 50-336/96,"

dated December 4, 1992.

J. F. Opeka letter to T. T. Martin, ' Millstone Nuclear Power Station,

(2)

Unit No. 2

Inspection Report No. 50-336/92-26 Reply to Notice of

Violation," dated January 13, 1993.

D

Q bOlAA W W

osu a ncy m

W Uf tf,;fj}

g

U.S. Nucitar Regulatory Cc cissica

B14380/Page 2

February- 19, 1993

provides additional information as requested, describing the supple

actions which will be taken to further reinforce 14DE inspector training.

This NOV is being added as a reference to Component Test Services Pro

The need to document all

" Contractor Training and Monitoring."and nonrelevant, will be stre

QCTS-2.17,

In

prepared by the Northeast Utilities Service Company (NUSCO) instructor

indications, relevant

ill

addition, the NUSCO employees assigned to monitor c

documentation.

A new checklist for radiography is also in

complete

preparation and will be added to the procedure.

These changes and enhancements are expected to be in place by May 1993.

If you have further questions on this issue, please contact my staff.

Very truly yours,

NORTHEAST NUCLEAR ENERGY COMPANY

FOR:

J. F. Opeka

Executive Vice President

BY:

W.D.Romberg[s/

Vice President

G. S. Vissing, NRC Project Manager, Millstone Unit No.

cc:

and 3

U.S Nuclear Regulatory Commission

Attention: Document Control Desk