Text
gr i
GE Nuclear Energy Gmiten cwou
- + cnv!,ma s,n i a cw
- 5 March 16,1993 Docket No. STN 52-001 t
. Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Review Schedule - Resolution of Chapter 18 DFSER Outstanding Items
Dear Chet:
Enclosed is a copy of a GE letter addressing resolution of DFSER outstanding items originally faxed to Clare Goodman on March 12,1993. This March 16,1993 letter supersedes the March 12,1993 fax.
It should be noted that those items indicated with "AM 23" or "AM 25"(AM =
Amendment) on the right hand side of Table 1 are considered closed by GE. Following our phone call on March 22,1993, we plan to address all of the outstanding items either by marking up the SSAR (including Revision 4 to proposed Appendix 18E) or provide the rationale to eliminate specific items.
Please provide a copy of this transmittal to Clare Goodman.
Sincerel a$ Y J k Fox i
Advanced Reactor Programs cc: Norman Fletcher (DOE)
Keith Gregoire (GE)
Monty Ross (GE) h 5
JIM 57 9303250119 930316
{DR ADOCK 05200001 PDR
GE Nuclear Energy February 26,1993 cc: M. A. Ross To: J. N. Fox From: Keith E. Gregoire, LCE for ABWR SSAR Chapter 18
Subject:
Resolution of ABWR DFSER Open and Confirmatory issues and GE Positions on NRC-Proposed COL Action items
Reference:
Letter, K. E. Gregoire to J. N. Fox, " Resolution of ABWR DFSER Open and Confirmatory Issues", Feb. 9,1993 The purpose of this letter is to update and expand the information contained in the reference. Since the reference was written, information has been received from the NRC to the effect that the staff proposes switching six confirmatory issues to COL Action item classification. The contents of this letter reflect this new information.
Confirmatory & Open issues Resolvable by SSAR Markuos Those confirmatory and open issues which can be resolved by marking up appropriate passages in or adding new material to the SSAR are listed in Table 1 along with the affected SSAR section or appendix.
Table 1 SSAR Modification issue Resolutions issue Deslanation Issue Title or Descriotion SSAR Sectioit Conf. Issue No.18.3.2.1-1 Validation of Detailed Design Append.18E Cont. Issue No.18.3.2.1-2 Standard Features & Prototype Evaluation Subs.18.4.2 ig Conf. Issue No. 18.3.2.1-3 Operator Workload Append.18G AM 13 Conf. Issue No.18.3.2.1-4 Tests. Evaluations, Studies Append.18G AH 23 1
GE Nuclear Energy 1
Table 1 (Cont'd.)
Issue Deslanation Issue Title or Descriotion SSAR Section Cont. Issue No.16.3.2.1-5 Adequacy of HSI Design Requirements Append.18G m
z3 Conf. Issue No.18.3.2.2-1 SPDS Information basea on BWROG EPGs Subs.18,3 4s z3 Cont. Issue No. 18.3.2.2-2 SPDS issues See Note 1 Conf. Issue No.18.3.3-1 Standard Features Append.18G m
13 Cont. Issue No.18.4.3-1 inventory Append.18F m
25 Cont. Issue 18.5.2.1-1 RSS Design Approach Evaluation See Note 1 Open issue No.18.9.2.2-1 Process Element Guidance Documents Append.18E Open issue No.18.9.2.2.1-1 Operating Expenence Review Append.18E Cont. Issue No.18.9.2.2.8-1 Task Analysis Element to include HRA/PRA Append.18E Conf. Issue No.18.9.2.2.8-2 Evaluation of Plant Evolutions See Note 1 Note 1: This issue is being resolved by the revision of Appendix 18E and,in addition,is proposed by the Staff to be treated as a COL Action item. see also Table 2.
All of the markups intended to resolve the above issues have been completed and incorporated into the SSAR except for those in Appendix 18E.
Issues Resolvable By Means Other Than SSAR Modifications Those confirmatory and open issues which require means for resolution other than simple markups of the SSAR are listed below along with comments.
- 1. Open issue 18.9.1-1, "ITAAC/ Design Descriptian"--This issue will be resolved through the acceptance by the staff of the Tier 1 Design Certification Material (DCM).
2
GE Nuclear Energy
- 2. Confirmatory Issue 18.9.2.2.1-1, " Human Factors Program Plan"-- This issue will be resolved through the acceptance by the staff of the Tier 1 Design Certification Material and the Tier 2 SSAR materialin Appendix 18E.
- 3. Confirmatory issue 18.9.2.2.5-1, " Detailed Task Analysis"-- Resolved similarly to #2.
- 4. Confirmatory Issue 18.9.2.2.6-1, "HSI Design Requirements"-- This issue is being resolved by making it a COL Action item.
- 5. Confirmatory issue 18.9.2.2.6-2, "CRT Display Information"-- Resolved similarly to #4.
- 6. Confirmatory issue 18.9.2.2.6-3, " Alarm Suppression Criteria / Alarm Setpoints"--Resolved similarly to #4.
- 7. Confirmatory issue 18.9.2.2.7-1, " Procedure Development"-- Resolved similarly to #2.
- 8. Confirmatory Issue 18.9.2.2.8-3, " Operator Workload Analysis"--Resolved similarly to #2.
- 9. Confirmatory issue 18.9.2.2.8-4, "lTAAC-Tests & Analysis in DCM Table 3.6" Resolved similarly to #2.
- 10. Confirmatory issue 18.9.2.2.8-5, " Fully Functional Control Room Prototype"--
Resolved similarly to #1.
NRC-Proposed COL Action items in classifying the NRC-Proposed COL Action Items, the following 4 categories are used:
- 1. Not clear what the issue is. Needs review / discussion.
3
GE Nuclear Energy
- 2. Will be addressed as part of the MCR/RSS design implementation process, as defined by existing human factors engineering (HFE) DACs. GE agrees that this should be a COL Action item.
- 4. We don't agree that this should be a COL Action item.
The 16 NRC-Proposed COL Action items discussed in the DFSER and the six confirmatory issues which the NRC has recently proposed to treat as COL Action items are listed and categorized in Table 2.
Table 2 Categorization of COL Action items Designation Descriotion Category 18.2.2.2-1 Evaluate the number of operators needing access to 2
controls at the main console.
18.2.2.2-2 Specify the roles /reponsibilities of the shift supervisor 3
and assistant shift supervisor.
18.2.2.2-3 Evaluate automation strategies and their effect on 2
operator reliability.
18.3.2.2-1 Assure conformance of the SPDS design with the 2
criteria of Section 3.8a of NUREG-0737', Supplement 1.
18.3.3-1 Validate the final design of the standard design 2
features.
4
GE Nuclear Energy Table 2 (Cont'd.)
Desionation Description Cateoory 18.4.3-1 Several specific issues related to the Inventory of 1
Appendix 18F are to be addressed.
18.6-1 Provide complete local valve position indication.
4 18.7.2.2.1 Provide for operator training per 10CFR Part 50.
3 18.7.2.2-2 Address TMI Items I.C.1, "Short Term Accident 1
Analysis and Procedure Revision" and I.C.9, "Long Term Program Plan for Upgrading of Procedures".
18.7.2.2-3 Address TMI Items I.D.1, " Control Room Design 1
Reviews", l.D.4, " Control Room Design Standard" and I.D.5, " improved Control Room Instrumentation Research".
18.7.2.2-4 Address NUREG-0933 Item 125.l.3, "SPDS 2
Availability".
18.7.2.2-5 Address the human factors aspects of TMI Item I.D.3, 2
" Safety System Status Monitoring".
18.7.2.2-6 Address the following USI/GSI issues: (1) HF-4.4, 1
" Guidelines for Upgrading Other Procedures", (2) HF-5.2, " Review Criteria for Human Factors Aspects of Advanced Control Room Instrumentation", (3) B-17,
" Criteria for Safety Related Operator Actions", (4) HF-01.3.4b, " Interface Annunciators", (5) HF-01.3.4c,
" Operational Aids", (6) HF-01.3.4d, " Automation and Artificial Intelligence" and (7) HF-01.3.4e, " Computers and Computer Displays" 5
i
GE Nuclear Energy Table 2 (Cont'd.)
Desionation Description Category 18.7.2.2-7 Address the following USI/GSI issues: (1) HF-5.1, 1
" Local Control Stations", (2) HF-01.3.4a, " Local Control Stations" and (3) II.K.1(5), " Safety Related Valve Position".
18.7.2.2-8 Address the following issues, (1) HF-1.1, " Shift 1
Staffing" and (2) 1.A.1.4, "Long Term Upgrade of Operating Personnel and Staffing".
18.9.2.2.8-1 Consider malfunctions of the PGCS, as part of 2
Element 8.
Confirm. Issue SPDS Issues 1
No.18.3.2.2-2 confirm. Issue RSS Design Approach Evaluations 1
No.18.5.2.1-1 confirm. Issue HSI Design Requirements 1
No.18.9.2.2.6-1 confirm. Issue CRT Display Information 1
No.18.9.2.2.6-2 confirm. Issue Alarm Suppression Criteria / Alarm Setpoints 1
No.18.9.2.2.6-3 confirm. Issue Evaluation of Plant Evolutions 1
No.18.9.2.2.8-2 f
6