Forwards Insp Rept 70-1257/93-02 by Augmented Insp Team on 930209-12.Enforcement Issues Not Addressed.Insp in Response to 930207 Event Re Release of Large Quantity of Low Enriched U from Normal Process Sys.Poor Procedural Compliance Noted
ML20035A084
Person / Time
Site: Framatome ANP Richland
Issue date: 03/10/1993
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Femreite B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20035A085 List:
References
NUDOCS 9303240044
Download: ML20035A084 (3)


Text

.

o f

(%g UNrrED STATES y

NUCLEAR REGULATORY COMMISSION f

E REGION V r

D 8

1450 MARIA LANE 8

WALNUT CREEK, CAUFORNIA 94596-5368 g 1 0 1933 Docket No. 70-1257 License No. SNM-1227 Siemens Power Corporation 2101 Horn Rapids Road P. O. Box 130 Richland, Washington 99352-0130 Attention: Mr. B. N. Femreite, Plant Manager

SUBJECT:

NRC INSPECTION REPORT N0. 70-1257/93-02 This refers to the special inspection conducted by the Nuclear Regulatory Commission's (NRC) Augmented Inspection Team (AIT) at your Richland facility on February 9-12, 1993. The inspection was in response to an event on February 7,1993, involving the release of a large quantity of low enriched uranium from its normal process system. At the conclusion of the inspection on February 12, 1993, the AIT discussed its findings with you and members of your staff at an open meeting.

The AIT's charter, the areas examined during this inspection, and the AIT's findings and conclusions are described in the enclosed inspection report. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the AIT.

The AIT found the cause of this event to be rooted in poor procedural compliance and communications. The AIT also identified concerns in your work control practices and in criticality safety relative to the potential for neutron moderator intrusion into your controlled process areas. The overall conclusions of the AIT are found in Section 10.0 of the enclosed report. A Confirmatory Action Letter was issued on February 12, 1993, regarding the moderation control issue. Other than the moderation control issue, we note that your investigation arrived at similar conclusions as the AIT.

This report does not address enforcement issues. Any enforcement issues evolving from this event will be handled separately.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.

9303240044 930310 PDR ADOCK 07001257

,/'

}

f C

PDR

/u v

+

2 Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely, B. H. Faulkenberry Deputy Regional Administrator

Enclosure:

NRC Inspection Report No. 70-1257/93-02 cc w/ enclosure State of Washington bec w/ enclosure:

i State of Washington Inspection File J. Martin B. Faulkenberry G. Cook R. Burnett, NMSS J. Greeves, HMSS M. Adams, NMSS M. Klasky, NMSS J. Goldberg, OGC J. Leiberman, OE W. Troskoski, OE S. Magruder, NRR R. Bellamy, RI D. Collins, RII J. Grobe, RIII C. Cain, RIV W. McNulty, 01 J. Reese D. Proulx bec w/o enclosure M. Smith h#'

REGION b

CHooke FWenslawski RSc io BFaulkenberry 3/'f /93 f/93 3/g93 3AO/93 R UEST COPY][F100fST COPY]

~ EST COPY][ REQUEST COPY][SEN TO PDR ]

(E S.

/ N0 1FYES/ / N0 1 VES / N0 if YES / N0 lI E

/ NO 1

\\

2300 t

T607

A 2

Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely

~

B. H. Faulkenberry Deputy Regional Administrator I

Enclosure:

NRC Inspection Report No. 70-1257/93-02 cc w/ enclosure:

State of Washington t

k b

T