-i
-
-_.
-
f'
]
.
- UNITED STATES <
, 4r
[':pa afor,{k
NUCLEAR REGULATORY COMMISSION
.
%
'[
j'
~
REG 10N IV
T
611 RYAN PLAZA DRIVE, SUITE 400
j/
ARLINGTON, TEXAS 76011-8064
. < ,
.....
MAR I 21993
Dockets: 50-072
50-407
Licenses: R-25
R-126
University of Utah
- ATTN:
D. K. Gehmlick, Reactor Administrator
= Merrill . Engineering Building, Room 3209
Department of. Mechanical Engineering
Salt Lake City, Utah 84112
SUBJECT: NRC INSPECTION REPORT. 50-072/93-01; 50-407/93-01
This refers to the inspection conducted by Dr. J. B. Nicholas and
' Dr. D. B. Spitzberg of. this office during the period February 8-12,:1993. The
.
inspection included a review of activities authorized for' the University of
Utah's AGN-201 and TRIGA reactors. At the conclusion of the inspection, the -
findings were discussed with you and those members of the university staff
identified in the enclosed report.-
Areas examined during the inspection are identified in the.. report. These
areas included the reactor operations, nuclear material control'and
accountability, radiation protection, emergency l preparedness, and physical
.
security programs. Within these areas,- the inspection consisted of selective
examination of procedures and ' representative records, interviews with .
y
. personnel, and observation.of activities in progress. The results of this :
'
'
inspection are documented in the enclosed report.,
During this inspection, it was identified thatLone of'your licensed ' senior'
q
reactor. operators had failed to complete his biennial operator requalification
requirements' by not taking the 1992 annual written operator requalification
-
examination, and this was _ in violation of Section V.A of your NRC' approved
1
reactor operator.requalification training program. .It wasialso identified
'
that another' one of your licensed senior . reactor operators had-also' failed to
complete his biennial operator requalification requirements by not~ taking his
biennial medical examination, and this was in violation'of'Section VII. of your
C.
NRC approved reactor operator requalification training program and..
10 CFR 55.53(i) requirements. These violations are'not beingicited because-
the cr.iteria in paragraph VII.B.1 of Appendix C to 10 CFR Part. 2 of the NRC's:
" Rules of Practice," were satisfied. These violations were isolated
i
DOCUMENT CONTAINS PROPRIETARY INFORMATION
. DECONTROLLED WHEN SEPARATED'FROM ATTACHMENT 2
9303220103 930312
l
-
'
ADOCK 05000072'
-
G
.PDR '
.
, _
(
o
^
..J
4.) .
,4;
m
University of Utah
-2-
occurrences and the licensee's staff took prompt and effective corrective
+
. actions to correct the problems.-
It was also identified that'your annual reactor operating report for the
reporting. period July 1,1990, through June 30, 1991, was submitted after the
deadline.of 60 days following .the 30th of June of each year,:and this was a
- '
licensee-identified violation of Technical Specification 6.10(5).. This
~
violation is not being cited because the criteria in paragraph VII.B'.2 of
Appendix C to 10 CFR Part 2 of the NRC's " Rules of Practice,"'were satisfied.
In the area of emergency preparedness, two weaknesses were identified. ione
weakness is discussed in Section.13.1.3 of the enclosed report and involved
the failure to demonstrate the capability to promptly classify. emergency.
events according to the actual or projected radiological consequences.-
specified in your emergency action level scheme. -The second weakness is
discussed in Section 13.1.4 of the report and involved the absence of an
agreement between the licensee and ambulance providers. You are requested to
provide this office, within 30 days after receipt of this letter, with your.
analysis of the weaknesses, a description of your corrective measures, and-
your schedule for completing these actions.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," .a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
However, in accordance with'10 CFR Part 2.790(d), the documentation enclosed
concerning your Physical Security Plan (Attachment 2 to the Appendix) is
exempt from disclosure. Therefore, this Attachment will not be placed in the
Public Document Room.
The responses directed by this letter are not. subject to the clearance
procedures of the Office of Management and Budget, as. required by the:
Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this inspection, we will be pleased.
to discuss them with you.
Sincerely,
'
'
-
.
h L. 'J. Callan, Director
Division of Radiation' Safety -
and Safeguards
Enclosures:
1.
Appendix - NRC Inspection Report
50-072/93-01; 50-407/93-01
2.
Attachment 1 - Persons Contacted and Exit Meeting
3.
Attachment 2 ' Physical.-Security Inspection;- PROPRIETARY INFORMATION
DOCUMENT CONTAINS PROPRIETARY INFORM ATION
DECONTROLLED WHEN SEPARATED FROM ATTACHMENT 2-
4
_
-
i.
p,
.
- ,-
lY
Unt'versity of Utah
-3-
cc without' Attachment-2 (PROPRIETARY INFORMATION):
University of Utah-
ATTN:
R. J. Pugmire
'
Associate Vice President of Research
210 Park Building
,
Salt Lake City, Utah 84112
L
University of Utah
'
i
ATTN:
G. M. Sandquist, Director
Nuclear Engineering Laboratory
Department of Mechanical Engineering
-Merrill Engineering Building, Room 3209
Salt Lake City, Utah 84112
University of Utah
ATTN:
D. M. Slaughter, Reactor Supervisor
Department of Mechanical Engineering
Merrill Engineering Building, Room 3209
Salt Lake City, Utah 84112
University of Utah
ATTN: K. J. Schiager
Radiation Safety Officer
Radiological Health-Department
100 Orson Spencer Hall
Salt Lake City, Utah 84112
Utah Department of Health
ATTN: Radiation Control Program Director
Bureau of Radiation Control
P.O. Box 16690
Salt Lake City, Utah 84116-0609
,
.-
.
.-
t
!
.
-
+
DOCUMENT CONTAINS PROPRIETARYINFORMATION'-
DECONTROLLED WHEN SEPARATED FROM. ATTACHMENT 2
,
{ 14. .
,
-
.
.
'
p 4o1
Ikn
.
.
t?
' University of Utah -
~-4
'
.
bec to DMB without Attachment 2 (PROPRIETARY INFORMATION)_ (IE01):
..s
-
,
.
' bec with copy 'of. entire _ report:
.
J. L..Milhoan
p
- B..Murray, FIPS
- J. B.1 Nicholas, FIPS
'
- D. B. Spitzberg,.FIPS
"
-*FIPS-File-
'
- RIV File-
-
.
^
becwithoutAttachment2(PROPRIETARYINFORMATION).:
- DRP-
- DRS
- MIS Coordinator
Lisa Shea, RM/ALF, (MS MNBB 4503)
'A. Adams, NRR Project ' Manager (MS 11 B20)
M. M. Mendonca, NRR Project Manager (MS 11 B20)
~:
.
- (
.,
I
la
- . i
4tl+phev
RIV:FIPSW 4-
FIPS TEC-
C:FIPS
/2f'
HQ:NRR T$r
DD:DRS'Sk
]
Y
MMMenYnca
DDChamberlain
JBNicholas:nh.
DBSpitzberg
BMurray
'5 /10' /93 -
3/18/93
h/IM3
3/10/93
3/>/93:
D:DRSS [
,
OCallan 4, -
.
'
3/(2/93
'!
4
DOCUMENT CONTAINS PROPRIETARY.INFORMATION.
'
-DECONTROLLED.WHEN SEPARATED FROM ATTACHMENT 2
.
.!
"'
,,m
- -
g:.
,
.:5
sd . c
__ fi ,
-
R
,
' University of Utah;
i
-4---
t
bccTto'.DMB1withouti Attachment 2. (PROPRIETARY?INFORMATION)!-(IE01)if
-
.
bec with copy of.-entire report:-
'
J. L. Milhoan
- *B. Murray, FIPS
.
,
- *J. B.-Nicholas, FIPS
.
' *D. B. Spitzberg, FIPS
- FIPS File
- RIV File
bec without Attachment 2 (PROPRIETARY INFORMATION):
- DRP
,
- DRS
- MIS Coordinator
Lisa Shea,'RM/ALF, (MS MNBB 4503)
.
A. Adams, NRR Project Manager (MS 11 B20)
'
M. M.' Hendonca, NRR Project Manager (MS 11 B20)
_
,
t
': !
-
t
w
,
.
-hl+p4mL-
'
RIV:FIPS W D
FIPS TPS-
C:FIPS M
HQ:NRR %
DD:0RSSk
'
E
MMMendEnca~
DDChamberlain'
l
JBNicholas:nh.
DBSpitzberg
BMurray
IIG93
yyjeL=j
y13/931
l
=_
D:DRSSQ
L
LJCallank
f/f2./93
-
i
!!
DOCUMENT CONTAINS PROPRIETARY INFORM ATION :
J"
DECONTROLLED WHEN SEPARATED FROM ' ATTACHMENT 21
a
L190003-
1
a