Text

{

s

' ' *[.iY *;'

o7 1MaineYankee:

fl RELIABLE ELECTRICITY FOR MAINE SINCE 1972

.s-EDISON DRIVE. AUGUSTA, MAINE 04330. (207) 622-4868 -

I March 8, 1993 MN-93-24 JRH-93-26 y

UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555 j

References:

(a)

License No. DPR-36'(Docket No. 50-309)

(b): NUREG-0020, Licensed Operating Reactor. Status: Summary Report'

Subject:

Maine Yankee Monthly Statistical Report -- February 1993--

t Gentlemen:

. Enclosed please find the Monthly Statistica1' Report for the. Maine Yankee Atomic ~-

Power -Station for February 1993.

Please contact' me should you have.any.further:'

questions.

Very truly yours',.-

?!

f N

/

6 0

James R. Hebert, Manager i

Licensing & Engineering-Support Department SJB/ jag

' Enclosure

. c.

Mr.i Thomas T.. Martin..

l Mr. Charles S. Marschall-b Mr,JE. H. Trottier'.

j

Mr. Patrick J.~ Dostie l

.' _j-

,y

.j y.~'

'i

'I

-p ff.

1

P f

l na%,m I

OPERATIEG DATA REPORT D ckat No.:

53-329 Dato:

10/Har/93 Completed By:

S.

J.

BAILEY Telephone 207-622-4868 o

1.

Unit Name.......................................

Maine Yankee 2.

Reporting Period................................

February 1993 3.

Licensed Thermal Power (HWt)....................

2700 4.

Nameplate Rating (Gross HWe)....................

920

5. Design Electrical Rating (Net MWe)..............

870 6.

Maximum Dependable Capacity (Gross HWe).........

900

7. Maximum Dependable Capacity (Net HWe)...........

860 8.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 9.

Power Level to Which Restricted, if Any (Net MWe)

10. Reasons for Restrictions, if Any:

THIS HONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 672.00 1,416.00
12. Number of Hours Reactor Was Critical...........

609.30 1,353.30 143,118.51

13. Reactor Reserve Shutdown Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

587.20 1,306.10 138,938.13

15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWH)........

1,547,875.00 3,395.425.00 326,548,348.00

17. Gross Electrical Energy Generated (MWH)........

519,790.00 1,137,450.00 107,434,910.00

18. Net Electrical Energy Generated (MWH)........

503,557.00 1,101,390.00 103,013,362.00

19. Unit Service Factor......

87.38 92.24 78.09

23. Unit Availabilty Factor..

87.38 92.24 78.09

21. Unit Capacity Factor (Using MDC Net)........

87.13 90.44 72.10

22. Unit Capacity Factor (Using DER Net)........

86.13 89.40 70.49

23. Unit Forced Outage Rate..

12.62 7.76 7.47

24. Shutdowns Scheduled Over Next 6 Honths:

Date Type Duration 8/28/93 Refeulino 57 days

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A

Docket No:

50-309 Unit Names Haine Yankee Dates.

03-03-93 Completed By:

S.J.

Bailey Telephone:

207-623-4868 Report Month: February, 1993 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES On February 1, the unit was manually shutdown to investigate increased vibration on Reactor Coolant Pump #3.

Investigation revealed the shaft key was shifting position.

The unit returned to 100% power-on February 4 and remained there for the remainder of the month.

t

1 9;

' AVER GE' DAILY UNIT POWER LEVEL FOR-FEBRUARY.1993

-l Docket No.:

50-309 Unito Maine-' Yankee 1

-i Date:

03/ Mar /93 Completed By:

S.

J.

BAILEY l

Telephones.

207-622-48681 l

L t

Day Avg. Daily Power Level Day Avg. Daily Power Level.

(MWe-Net)

(MWe-Net) j I

i r

1.

33-16 889 t

i 882~

12 0

17 i

3 9

18 882-i t

t f

4 53 19 879 i

fj

.s see 2e 88e o

8 87s 21 88..

I 7

879 22 889

.i t

8 879 23 889-i

_a

'i 9

889 24-

889 i

i i

R10 880 25

._879 i

't i

11 880 26

~881-11 2-881 27 880'

.i

I 13 879 28

'886 j

14 881-ll

.t 115.

888 I

t

^

i s

i i

}l i

,1 r

'UEIT'SHUTDONNS AND PONER REDUCTIONS Docket No.:

53-3!9 FOR FEBRUARY 1993 Unit Haine Yankee Date:

03/Har/93 i

Completed By:

S.

J.

BAILEY

[

Telephone:

207-622-4868 Page:

1 of 1 Nunber 08-93-13 Date J

930201 J

l

[

Type (1) l F.

l Duration (Hours) 84.8 I

I Reason (2)

B q

l Hathod (3) j 1

)

[

LER #

l N/A I

System Coda (4)

CB Cocponent Code (5)

PUHPIX-B On February 1, the unit was manually shutdown to in-i vestigate increas-Cause and ed vibration on Corrective Reactor Coolant Action Pump #3. Shaft key

[

was shifting position. The unit returned to 1001

~l power on Feb.

4.

1.

TYPE:

2. REASON: (cont) 4.

SYSTEH CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data l

H-Other (Explain)

Entry Sheets for 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Haintenance or Test' 1-Hanual C-Refueling 2-Hanual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source.

l E-Operator Training &

4-Other (Explain) as above.