V.

m

~.

ENCLOSURE I U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING REOUALIFICATION EXAMINATION REPORT REPORT NO.:

50-160/0L-93-02 FACILITY DOCKET NO.:

50-160 FACILITY LICENSE NO.:

R-97 l

FACILITY:

Georgia Institute of Technology Reactor 7

EXAMINATION DATES:

January 11-13, 1993 EXAMINER:

Paul Doy e (Chief Exa.iner)

SUBMITTED BY:

2-21-93 boy, Chi f aminer Date au APPROVED BY:

- 3 5

James L. Caldwell, Chief

/ Aate Non-Power Reactor Section Operator Licensing Branch Division of Reactor Controls and Human Factors, NRR

SUMMARY

The NRC administered a Operator Licensing Requalification Examination to one Senior Reactor Operator. The Senior Reactor Operator passed all sections of the examination.

ppfan Fe$ti v

m

i

.- REPORT DETAILS-3 1.

Examiners:

Paul Doyle y

2.

Results:

R0 SRO Total (Pass / Fail)

(Pass / Fail)

(Pass / Fail)

NRC Grading:

0/0 1/0 1/0 Facility Grading:

N/A N/A N/A 3.

Written Examination:

The NRC administered a written examination to one Senior Reactor Operator for requalification. The Senior Reactor Operator passed the written examination.

l r

4.

Operating Tests:

The NRC administered an Operator Licensing Requalification operating -

I test to one Senior Reactor Operator. The Senior Reactor Operator passed this portion of the examination.

5.

Exit Meeting:

Attendees:

Paul Doyle, Chief Examiner, Nuclear Regulatory Commission Billy Statham, Manager, Reactor Operations,-Georgia Institute of Technology During the exit meeting the examiner identified a reluctance on the part of the Senior Reactor Operator to use plant operating procedures during

}

the facility walkthrough portion of the examination. This issue was also identified during the NRC examinations administered February _26, 1990.

r i

?

_ _ pig

=,,.n-.e

--.s

+e

L

{

l Facility Comments and NRC Resolution Section B Question B.2 [1.0)

Gallontium has a biological half life of 15 days and a radiological half life of 2 days. What is the effective half life 7 a.

0.567 days b.

1.765 days i

c.

7.50 days d.

17.0 days Facility Comment b.

is the correct answer. The solution was correct and stated b as the answer. The answer sheet inadvertently stated a as the answer.

NRC Resolution Comment accepted. The answer sheet and the answer key both have been corrected to show b as the correct answer.

9 i