I
..
.
,
,
MAR 0 91993
Docket No. 50-29
Mr. Jay K. Thayer
Vice President and
Manager of Operations
Yankee Atomic Electric Company
580 Main Street
Bolton, Massachusetts 01740-1398
Dear Mr. Thayer:
SUBJECT:
YANKEE ROWE INSPECTION REPORT 50-29/93-01
This refers to the safety inspection conducted by Messrs. B. Norris, N. Perry, and M. Fairtile
from January 25-28, 1993, at the Yankee Nuclear Power Station, Rowe, Massachusetts. The
inspectors focused their efforts on issues important to the health and safety of the public,
specifically since the issuance of the Possession Only License on August 5,1992, and based
their findings on observations of activities, interviews with personnel, and document reviews.
The results were discussed with Mr. N. St. Laurent, Plant Superintendent, and other members
of your staff.
Activities were generally found to be conducted safely, equipment was suitably maintained, and
safety analyses were comprehensive. The defueled Security and Emergency plans were found
to be appropriately translated into procedures, but some problems were identified with
administrative controls for your Certified Fuel Handler program. A non-cited violation was
identified concerning document control for the revised Technical Specifications, but enforcement
discretion was exercised because your corrective actions were prompt and comprehensive.
Finally, enforcement discretion was also exercised for two instances of missed Technical
Specification surveillances because of low safety significance, your corrective action, and they
are not applicable in the current plant configuration.
No reply to this letter is required, and your cooperation with us is appreciated.
Sincerely,
Original Signed Br.
James C. Unville
} g. y j'
James C. Linville, Chief
Projects Branch No. 3
Division of Reactor Projects
ny a -
(
Enclosure: NRC Inspection Report 50-29/93-01
a
.
- gr48ssZi88ljp
'ICIAL RECORD COPY
IIl
G
. - -
..
. . ,
. , - .
..
.
,
.
Yankee Atomic Electric Company
2
NAR 0 91993
cc w/ encl:
A. Kadak, President and Chief Executive Officer
N. St. Laurent, Plant Superintendent
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
T. Dignan, Esquire
J. Grant, Senior Licensing Engineer
R. Sedano, Commissioner, Vermont Department of Public Service
T. Rapone, Massachusetts Executive Office of Public Safety
R. Gelder, New England Conference of Public Utilities Commissioners, Inc.
Citizens Awareness Network
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
N. Perry, NRC Resident Inspector
K. Abraham, PAO (2 copies)
Commonwealth of Massachusetts, SLO Designee
State of Vermont, SLO Designee
.
OFFICIAL RECORD COPY
. .
.
--
-
.
.
.
.
,.
,
. .
- ,-(,
,
g 0B M
-
,
Yankee Atomic Electric Company
3
bec w/ encl:
Region I Docket Room (witti concurrences)
J. Linville, DRP
,
E. Kelly, DRP
B. Norris, DRP
-
H. Eichenholz, SRI - Vermont Yankee
,
J. Nick, DRSS
V. McCree, OEDO
M., Fairtile, NRR
S. Weiss, NRR
bec w/ Letter and Executive Summary Only:
T. Martin, RA
W. Kane, DRA
C. Hehl, DRP
J. Wiggins, DRP
R. Cooper, DRSS
W. Hodges, DRS
W. Lanning, DRS
W. Ruland, DRS
L. Bettenhausen, DRS
J. Joyner, DRSS
D. Holody, EO
OFFICIAL RECORD COPY
'
RI/DRP
/DRSS
)
RI/D
f
l'g
'
1
BNorris
RKe
EK
ille
->
03/f/93
03/05/93
03/
3
03/ /93
cnor 6.0)
G:\\YRIR9301.BSN
i