ML20034G972
| ML20034G972 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/28/1993 |
| From: | Maynard O, Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| WO-93-0048, WO-93-48, NUDOCS 9303120201 | |
| Download: ML20034G972 (7) | |
Text
m LF CREEK We)NUCLEAROPERATING CO
' March 9, 1993' Otto L. tAaynard vice PreMont Plant Operat ons WO 93-0048 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555
Subject:
Docket No. 50-482: February, 1993, Monthly Operating Report r
Gentlemen:
Attached is the February, 1993, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours, I
i
/
jf' ayJM Otto L. Maynard Vice President-Plant Operations OLM/jan Attaclunent I
cc:
W. D. Johnson (NRC), w/a J. L. Milhoan (NRC), w/a G. A. Pick (NRC), w/a W. D. Reckley (NRC), w/a i
93031202_. 930228
, k I
8 m / B*gt nJS W39 / Nom (3W E-8831 1
g-PDR ADOCK 05000482 An tauai opponunny empiover urme vc1
/
R PDR l/
~.Attm%mt to NO 93-0048
.i I
WOLF CREEK NUCLEAR OPERATI!G CORPTATION I
WOLF CREEK GENERATI!G STATION MatmLY OPERATIIG REPORT MONIH:
Februarv YEAR:
1993 Docket Ib. : 50-482 Faci 1ity Operating License Ib.: NPF-42 i
Report Ib.
96 b
h i
1 Prepared by:
Merlin G. Williams
[
i
-i s
f.
l 1
4 d,
Attachment to 10 93-0048 l
SUMMARY
i
'Ihe following report highlights the operating experience of Wolf Creek Generating Station for the nanth of February,1993. 'Ihis report is being provided pursuant to Technical Specification 6.9.1.8.
I.
SUMMARY
OF OPERATDG EXPFRIDCE The unit operatal at or near 100 percent power throughout the nanth of February.
t II. MMOR SAFLTY RELATED MAnnDWCE ACTIVITIES No najor safety related naintenance activities were perforned durirx; the month of February.
t i
.i 4
iblf Creek Geneating Station i
Monthly Operating Report February 1993 Page 1 of 5-l
Attachmnt to,10 93-0048 OPERATIIG DATA REPORT DOChTf 10.
50-482 NOLF CREEK GENERATIIG STICIO4 WOLF CREEK NUCLEAR OPERATIIG CORPORATION DATE 03-01-93 CW PLETED BY M. Williams TELEPHONE 316-364-8831.
OPEPATIIG STA'IUS 1.
Reporting Period:
February, 1993 Gross Hours in Reporting Period: 672 2.
Currently Authorized Power level (MWt): 3411 Max. Depend. Capacity (l@e-Net): 1131 Design Electrical Rating (l@e-Net):
1170_
3.
Power level to Khich Restricted (If Any)(MWe-Net):
N/A 4.
Reasons for restriction (If Any):
N/A his Month Yr. to Date Cumulative-5.
Number of Iburs Reactor was Critical 672.0 1416.0 52,718.5 6.
Reactor Reserve Shutdown Iburs 0.0 0.0 339.8 7.
Iburs Generator on Linc.
672.0 1416.0 52,067.8 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross herml Energy Generated (l&H) 2,288,546 4,823,189 170,352,324
- 10. Gross Electrical Energy Generated (MWH) 800,841 1,687,913 59,280,530
- 11. Net Electrical Energy Generated (MWH) 771,084 1,624,809 56,570,938
- 12. Reactor Service Factor 100.0 100.0 80.3
- 13. Reactor Availability Factor 100.0 100.0 80.8 t
- 14. Unit Service Factor 100.0 100.0 79.3
- 15. Unit Availability Factor 100.0 100.0 79.3 i
- 16. Unit Capacity Factor (Using MDC) 101.5 101.5 76.2
- 17. Unit Capacity Factor (Using Design MNe) 98.1 98.1 73.6 1
- 18. Unit Forred Outage Rate 0.0 0.0 6.3
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): Refueling Outace on March 5, 1993 for 58 days.
- 20. If Shut Down at End of Report Period, Estirated Date of Startup:
N/A Nolf Creek Generating Station Monthly Operating Report Febn nry 1993 Page 2 of 5 2
Attachmnt' to, WO 93-0048 AVEPJGE DAILY INIT PORER LEVEL Doura;r 10.
50 4,9,2 NOLF CREEK GDIERATIIG ST&"_0N NOLF CREEK NUCLEAR OPERATIfG COIPORATICN DATE 03-01-93 CGPLETED BY M. Williams TELEPHOtIE 316-364-8831 NON111 February, 1993 DAY AVERIGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL (MWe-Net)
(MNe-lbt) 1 1149 17 1147 2
1148 18 1148 3
1149 19 1148 1
~4 1143 20 1148 5
1149 21 1150 6
1141 22 1142 7
1149 23 1148 8
1149 24 1147 9
1149 25 1148-10 1148 26 1148 i
11-1148 27 1148 12 1148 28 1150 13 1149 29 N/A 14 1149 30 N/A
'15 1142 31 N/A 16 1147 i
Wolf Creek Generating Station Monthly Operating Report February 1993 Page 3 of 5 l
__ i
. Attachment to WO 93-0048 UNIT SHUTDOWN AND POWER REDUCTIONS
~
DOCKET NO..50-482-WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 03-01-93 COMPLETED BY M. Williams REPORT MONTH February. 1993 TELEPHONE 316-364-8831 TYPE HETHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /C0tEENTS No Date Sr SCHEDULED (HOURS)
(1)
OR REDUCING POWER (2)
.SUPMARY:
The unit operated at or near 100 percent power throughout the month of February.
- 1) RfASON: A EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE
.2.
MANUAL SCRAM C:
REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.
REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report February 1993 Page 4 of 5
..~
h i
I
- Attad$dnt to No 93-0048-i l
NOLF CREEK lux 2 EAR OPERATIIG CORPORATIOi NOLF CREEK GENERATIl0 STATIG1 l
UNIT 10. 1 MOlmi February, 1993
SUMMARY
OF OPERATIIG EXPERIDCE i
Listed belcw in chronological seguence is a sumary of operating experiences for this nanth which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVEtif.
February 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100 percent power.
i February 28, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100 percent power.
F I
N i
- h f
- t Wolf Creek Generating Station Monthly Operating Report _
February 1993 Page 5 of.5
.