ML20034G927

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1993 for Dbnps,Unit 1.W/
ML20034G927
Person / Time
Site: Davis Besse 
Issue date: 02/28/1993
From: Sarsour B, Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB93-0226, KB93-226, NUDOCS 9303120112
Download: ML20034G927 (5)


Text

-. -..

^

,a

-Ww.*-.

1 t, } -' g

+-we 6+

=

TOLEDO EDISON A Centerior Energy Company 0EOO 1

March 8,.1993 KB93-0226 j

Docket.No. 50-346 License No. NPF-3 I

U.S. Nuclear Regulatory Commission.

Document Control Desk Washington, D.C.

20555 l

Gentlemen Monthly Operating Report February 1993 Davis-Besse Nuclear. Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1.for the month of February 1993.

1 If you have any questions, please contact Bilal Sarsour at (419) 321-7384.

Very truly yours J*

~

I

,/

Louis F. Storz Plant Manager Davis-Besse Nuclear Power Station BMS/ tid I

J Enclosures

}

cc: Mr A. B. Davis Regional Administrator, Region III Mr.--J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector i

Cl foN$

y l -fV l

8 3

\\,

.. ~.

i~

AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO.

50-346 UNIT Davis-Besse i

DATE March 8. 1993 Bilal Sarsour COMPLETED BY

i TELEPHONE ' (419) 321-7384 i

j.

' February'1993 MONni a

DAY AVERAGE DAILY POWER LEVEL

- DAY-AVER AGE DAILY POWER LEVEL (MWe Net)

' (MWe-Net t 754 651 g

37 I

754 628-2 jg

'754 3

39 -

627 j

4 739 627 20 729 5.

21 627-6 -

730 603 22 711 597 l

7

.3 701 598-

{

8 24 703 597 9

25 10 698 26

.596 1I 676 583 27 675 582-12 28 13 f74 29 1

14 669 30 15 651-3y f

16.

650-I f

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i (4/771

,-,4,

..~,...-_.E 4-.s r u.e..

.w

',,,+...m e,

,m,--

--m

__,,..Er.,-y m

,,,4o_

w.

-_,y

l OPERATING DATA REPORT DOCKET NO.

50-346 DATE March 8, 1993 COMPLETED BY Bilal Sarsour TELEPHONE (419)321-7384 OPERATING STATUS Davis-Besse #1 Notes

1. Unit Name:
2. Reporting Period:

February 1993 2772

3. Licensed Thermal Power (MWr):

925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

921

6. Maximum Dependable Capacity (Gross MWe):

877

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe): Power levels shown on previous page.
10. Reasons For Restrictions,If Any:

Core depletion.

This Month Yr. to-Date Cumulative

11. Hours in Reporting Period 672.0 1,416.0 127,849
12. Number Of Hours Reactor Was Critical 672.0 1,416.0 76,351
13. Reactor Reserve Shutdown Hours 0.0 0.0 5.532.0
14. Hours Generator On-Line 672.0 1,416.0 74,191.4
15. Unit Reserve Shutdown Hours 0.0 0.0 1,732.5
16. Gross Thermal Energy Generated (MWH) 1,389,105 3,389,602 184,068,725
17. Gross Electrical Energy Generated (MWH) 474,501 1,148,775 61,081,088
18. Net Electrical Energy Generated (MWH) 445,989 1,087,527 57,530,500
19. Unit Service Factor 100.0 100.0 58.0
20. ' Unit Availability Factor 100.0 100.0 59.4
21. Unit Capacity Factor (Using MDC Net) 75.7 87.6 51.3
22. Unit Capacity Factor (Using DER Net) 73.3 84.8 49.7
23. Unit Forced Outage Rate 0.0 0.0 22.6 1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Eacht:

62 dav refueline outane.

1 l

25. If Shut Down At Er.d Of Report Period, Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achieted INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPERATION (9/77)

terr smrrroms mD mwER REDucrions 50-346 ooca r no, IMIT NAME Davis-Besse 41 6

tare March 8. 1993 CoMPIETED BY Bilal Sarsour February 1993 agpoa, m TErzPnosE (419) 2n-7384 y]

.g g cause a corrective 6m c

d 1,$

g s '4 E6 Action to g

Event so.

Date g

"8 g

Prevent mecurrence 1

93-01-20 S

H NA NA NA NA Reactor power reduction continued (cont) due to end of cycle coastdown.

F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of Data 5: Scheduled A-Equipment Failure (Explain) 1-Manual Entry Sheets for Licensee Event Report (IER)

B-Maintenance or Test 2-Manual Scram File (EEUREG-0161)

C-Refuelin9 3-Automatic Scram D-Regulatory Restriction 44ontinuation from E-Operator Training & I.icense Examination Previous 7buth Exhibit I - Same Source F-Administrative 5-toad Reduction

  • Report challenges to Power Operated Relief valves G-Operational Error (Explain) 9-other (Explain)

(PoRVs) and Pressuriser Code Safety Valves (PCSVs)

II-other (Explain)

~

Operational Summary February 1993 l

Reactor power-continued to be reduced during the month of February at the rate of approximately three percent every three days due to end.of Cycle 8-coastdown.

I I

I I

i i

l t

I v

v l

i e

6 l

2

.- -