ML20034G854
| ML20034G854 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/05/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hall D HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20034G855 | List: |
| References | |
| NUDOCS 9303120012 | |
| Download: ML20034G854 (5) | |
See also: IR 05000498/1992036
Text
7
-
-_
4
UtdITE D STATES
f[pR Ricgk
,
A
NUCLEAR REGULATORY COMMISSION
,
)M
-j
nrcion iv
~8
Gli RY AN PLAZA DRIVE, SUITE 400 -
-
o%
'[
AR LINGTON, T E XAS 76011 8064
g
.-
5 1993
3
l
Docket 50-498
l
50-499
!
License NPF-76
NPF-80
I
Houston Lighting & Power Company
ATTN:
Donald P. Hall, Group
J
Vice President, Nuclear
i
P.O. Box 1700
-
Houston, Texas 77251
SUBJECT:
NRC INSPECTION REPORT NO. 50-498/92-36; 50-499/92-36 (NOTICE OF
VIOLATION)
{
This refers to the inspection conducted by Mr. J. I. Tapit and the inspectors
!
identified in the attached report, of this office between December 6, 1992,
and January 16, 1993. The inspection ' included a review of activities
authorized for your South Texas Project, Units 1 and 2, facility. At the
,
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
,
Areas examined during the ic.spection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations of
,
activities in progress.
Based on the results of this inspection, certain licensee activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
i
Violation (Notice).
The first violation is of concern because it represents
five examples where the requirements of the Technical Specifications were not
1
'
adhered to.
The second violation relates to less than adequate preventive
maintenance on an important safety-related component, which caused a
subsequent valid failure of that component. The third and fourth violation
.
represent failures to satisfy the requirements of the American Society of
Mechanical Engineer's Code requirements.
)
During this inspection period, your staff identified that selected Technical
i
Specification surveillance procedures were less than adequate. Although this
constituted a violation of NRC requirements, the violations are not being
cited because the criteria in paragraph VII.B.2.of Appendix C to 10 CFR Part 2
I
of the NRC's " Rules of Practice," were satisfied. These violations were
licensee identified and your staff took prompt and effective actions to
,
correct the problem. One of the two violations was discovered during a
procedure review that was a corrective action for a previous licensee event
report. The other violation was found during an engineering review of
completed surveillance procedures.
,
/)]
[1
'}
9303120012 930305
/
ADOCK 05000498
'
G
/
.
"
-
. .
.-
-
O
,
.
,
.
'
fiouston Lighting & Power Company
-2-
l
.
t
!
!
J
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
i
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
f
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
l
The response directed by this letter and enclosed Notice are not subject to
,
the clearance procedures of the Office of Management and Budget, as required
by the Paperwork Redoction Act of 1980, PL 96-511.
,
Should you have any questions concerning this inspection, we will be pleased
'
to discuss them with you.
Sincerely,
r
ue J
.i
. Bill Beach, Director
'
Division of Reactor Projects
i
Enclosures
1.
Appendix A - Notice of Violation
2.
Appendix B.- NRC Inspection Report
50-498/92-36; 50-499/92-36 w/ attachment
i
,
cc w/ enclosures:
.i
Houston Lighting & Power Company
ATTN:
William J. Jump, Manager
l
Nuclear Licensing
P.O. Box 289
i
<
Wadsworth, Texas 77483
.l
City of Austin
Electric Utility Department
-ATTN:
J. C. Lanier/M. B. Lee
.!
P.O. Box. 1088
l
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
i
P.O. Box 1771
i
!
San Antonio, Texas 78296
,
-
.- _. _
_
_ . - . _ _-
_ _.
,
.-
-
.-
f
4
-t
I
.
. Houston Lighting & Power Company
-3-
l
l
i
4-
f
'
Newman & Holtzinger, P. C.
ATTN: Jack.R. Newman, Esq.
!
1615 L Street, NW
j
Washington, D.C.
20036
t
Central Power and Light Company
.
ATTN:
D. E. Ward /T.. M. Puckett-
P.O. Box 2121
Corpus Christi, Texas 78403
l
!
i
Records Center
-f
-
1100 Circle 75 Parkway
.
Atlanta, Georgia 30339-3064
l
Mr. Joseph M. Hendrie
50 Bellport. Lane
!
Bellport, New York 11713
j
Bureau of Radiation Control
, .
' State of Texas
1101 West 49th Street
l
j
i
a
Judge, Matagorda County
-t
Matagorda County Courthouse
{
1700 Seventh Street
Bay City, Texas 77414
i
Lice.nihg Representative
i
Housc
.ighting & Power Company
l
Suite 610
j
Three Metro Center
i
Bethesda, M.aryland 20814
l
1
Houston Lighting & Power Company
i
ATTN:
Rufus S. Scott, Associate
j
1
General Counsel
j
P.O. Box 61867
1
Houston, Texas 77208
t
.
-!
!
!
lj
i
i
-
i
u
'
I'
_
_
.
_
- ,.
.. .
-
,
,
4
51933
Houston Lighting & Power Company
-4_
!
bec to DMB (IE01)
bcc distrib. by RIV:
'
J. L. Milhoan
Resident inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
'
Project Engineer (DRP/D)
R. Bachmann, OGC, MS: 15-B-18
Section Chief (DRP/TSS)
!
G. A. Pick, SRI, WC
l
A. B. Beach
,
,
1
}
!
!
1
o
l
l
.
!
,
RIV:SRl*
RI*
DRS/MS*
DRP/D*
O:P
J1Tapia/lr
RJEvans
CEJohnson
TFStetka
Ar:86ach
2/ /93
2/ /93
2/ /93
2/ /93
3/5/93
!
- Previously concurred
,
I
_
i
- .
,
O
t
Houston Lighting & Power Company
-4-
bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
R. Bachmann, OGC, MS: 15-B-18
Section Chief (DRP/TSS)
G. A. Pick, SRI, WC
A. B. Beach
,
!
,
i
,
i
!
RIV: SRI *
RI*
DRS/MS*
DdP/D*
P-
'
JITapia/lr
RJEvans
CEJohnson
TFStetka
AiB ach
2/ /93
2/ /93
2/ /93
2/ /93
3/5/93
- Previously concurred
3.1.0031.
f
.
.
.