ML20034G617
Jump to navigation
Jump to search
| ML20034G617 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/31/1992 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20034G616 | List: |
| References | |
| NUDOCS 9303100235 | |
| Download: ML20034G617 (1) | |
Text
-
l i
I t
i i
Byron Station.
{
Environmental Protection Plan l
1992 Annual Environmental Operating Report l
ATTACHMEITI A
?
i l
Section 4.2 Environmental Monitoring Section 4.2.1 Aerial Remote Sensing _
i The aerial remote sensing program was not required for the calendar year 1992 i
per section 4.2.1.
The fifth and final operational _ survey is scheduled to be l
done during the summer of 1993.
i Section 4.1 #
a)
Confirmatory Sound Survey i
The Confirmatory Sound Survey requirements were completed in 1988.
l i
b) poise Related Complaints I
t
'I No noise related complaints were received by Commonwealth Edison j
concerning Byron Station during 1992.
_l 4
1 l
i 1
e i
1'l I
j t
i 1
(3696z/VS) 9303100235'930304 PDR ADDCK 05000454 R
PDR l