Forwards Response to NRC Bulletin 90-001,Suppl 1, Loss of Fill-Oil in Transmitters Mfg by Rosemount, Per Util 900718 Response
ML20034G424
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/05/1993
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-90-001, IEB-90-1, NUDOCS 9303090492
Download: ML20034G424 (7)


Text

.

A Tennes#e vase > Auttany. Poe owe IKw no Decas. Awtuma 35UB zo]

MAR 0 51993 O.J. v e'Zennguc vee Prescent, em.wis Feny Nuaer Plant i

U.S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 - RESPONSE TO NRC BULLETIN NO. 90-01, SUPPLEMENT I - LOSS OF FILL OIL IN TRAN! 61TTERS

(

MANUFACTURED BY ROSEMOUNT t

Reference:

Letter from TVA to NRC dated July 18, 1990, " Browns Ferry Nuclear Plant - Units 1, 2, and 3 - Response to NRC Bulletin No. 90-01:

Loss of Fill-Oil in Transmitters Manufactured by Rosemount" The purpose of this letter is to respond to NRC Bulletin 90-01, Supplement 1.

TVA responded to NRC Bulletin 90-01 by letter dated July 18, 1990.

TVA has reviewed its response to NRC Bulletin 90-01 in the light of the information contained in NRC Bulletin 90-01, supplement 1.

The commitments made in this letter supersede the commitments contained in i

TVA's original submittal dated July 18, 1990. contains TVA's response to each of the reporting requirements of NRC Bulletin 90-01, Supplement 1. describes the commitnents related to this submittal.

If you have any questions, please contact G.

D.

Pierce, Interim Manager of Site Licensing, at (205) 729-7566.

Sincerely,

/

O.

. Zeringue Enclosures cc:

See page 2 1

080147

/((h

.n fI 9303090492 930305 l

PDR ADDCK 05000259 4

g PDR v

1 Q

2 U.S.

Nuclear Regulatory Commission t1AR 0 51993 Enclosures cc (Enclosures):

NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 1

Mr. Thierry M. Ross, Project Manager U.S.

Nuclear Regulatory Commission One Whita Flint, North 11555 Rockville Pike Rockville, Maryland 20852 l

Mr. B. A. Nilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l

1 i

i I

1

ENCLOSURE 1 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2 AND 3 RESPONSE TO NRC BULLETIN 90-01, SUPPLEMENT 1 LOSS OF FILL OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT The following provides TVA's response for Browns Ferry Nuclear Plant for each of the requested actions and reporting requirements of Supplement 1 of NRC Bulletin 90-01:

BACKGROUND:

)

On April 21, 1989, NRC issued Information Notice 89-42, " Failure of Rosemount Models 1153 and 1154 Transmitters" to alert the industry to a series of reported failures of transmitters manufactured by Rosemount.

Rosemount determined that the failure mechanism is a gradual loss of fill oil from the sealed sensing module of the transmitter. On March 9, 1990, NRC issued i

Bulletin 90-01, in which it requested that licensees promptly identify and j

take appropriate corrective actions for transmitter models that have the j

potential for leaking fill oil.

NRC has reviewed information obtained from licensees via event reports, and as responses to NRC Bulletin 90-01.

Other

)

information was obtained from the manufacturer, from an industry initiative supported by the Nuclear Management and Resources Council (NUMARC), from meetings with representatives of the industry, and from investigations j

sponsored by NRC.

As a result of evaluating the information, NRC confirmed that there is a rslationship between operating pressure, time in service, and l

failure rate and that this relationship should be considered when applying the i

enhanced surveillance program. A high operating pressure was the most l

dominant factor leading to a loss of fill oil.

The second dominant factor was

)

time in service; transmitters which had been in service less than 60,000 psi-months exhibite a higher failure rate.

Transmitters which had been classified by Rosemount as being in a " suspect lot" had higher failure rates than nonsuspect lots.

However, when pressure application or time in service was considered, suspect lot classifications were of lesser importance.

NRC Bulletin 90-01, Supplement I reviews information obtained by the staff and industry in evaluating Rosemount transmitters. Licensees are requested to modify their actions regarding Rosemount transmitters in consideration of the information which has been obtained since NRC Eulletin 90-01 was issued.

l Recuested Action 1:

Review plant records and identify any Rosamount Model 1153 Series B, Model l

1153 Series D or Model 1154 transmitters manufactured before July 11, 1989, that are used or may be used in the future in either safety-related systems or l

systems installed in accordance with 10 CFR 50.62 (the Anticipated Transient Without Scram (ATWS) rule).

TVA Resnonse:

Plant records have been reviewed and the transmitters meeting the criteria of Requested Action 1 have been identified for Rosemount transmitters for BFN, Units 1, 2 and 3.

Peauested Action 18:

Replace or monitor transmitters which were included in Requested Action 1, and have a normal operating pressure greater than 1500 psig.

This applies to ATWS, engineered safeguard features (ESP) and reactor protection systems (RPS) only.

Page 3 l

ENCLOSURE 1 (Continued) r IVA Response:

BFN has no transmitters meeting criteria for Requested Action la.

Recuested Action Ib:

Replace or monitor transmitters which were included in Requested Action 1, and have a normal operating pressure greater than 1500 psig.

This applies to safety-related systems which are not ATWS, (ESF) or (RPS).

l TVA Response:

BFN has no transmitters meeting criteria for Requested Action lb.

Recuested Action Ic:

Replace or monitor RPS, ESF and ATWS transmitters included in Requested Action 1 which have a normal operating pressure greater than 500 psig, and have not achieved the app opriate psi-month threshold recommended by Rosemount.

TVA Response:

BFN Unit 2 hcs replaced all but two transmitters which fall under the above category, BFN Unit 1 has 24 transmitters and BFN Unit 3 has no transmitters which fall under the category of action Ic.

BFN has instituted a special monitoring program for Unit 2 which monitors the applicable Rosemount transmitters monthly including the two transmitters which meet the criteria of action Ic.

This monitoring program will be continued until these transmitters are refur"ished or replaced. TVA will formally notify the NRC of the proposed resolution of the Rosemount transmitter issue for Unit 1 prior to Unit I startup.

Recuested Action Id:

Replace or monitor safety-related transmitters for other than RPS, ESF and ATWS applications which are included in Requested Action 1, have a normal operating pressure greater than 500 psig, od have not achieved the appropriate psi-month threshold recommended by Rosemount.

TVA Resporise:

BFN has no transmitters in this category.

Recuested Action le:

At licensee discretion, exclude from enhanced monitoring program transmitters in Requerted Action 1 which have a normal operating pressure greater than 500 psig, and anich have exceeded the psi-month threshold recommended by Rosemount.

TVA Response BFN currently has no transmitters meeting this criteria. When applicable Unit 2 transmitters reach the psi-month threshold, TVA may evaluate excluding these transmitters from the enhanced surveillance program.

Page 4 ENCLOSURE 1 (Continued) 1 Recuested Action If:

At licensee discretion, exclude from enhanced monitoring program those transmitters included in requested Action 1 that have a normal operating pressure less than 500 psig.

Exclusion is permissible provided that there is a high degree of confidence in the reliability of the function consistent with safety significance and there is a high degree of confidence in the ability to detect failures.

TVA Response:

BFN Unit 2 has 11 transmitters included in Requested Action 1 which operate at less than 500 psig.

BFN Units 1 and 3 each have 4 transmitters in this category. The remaining transmitters in this category for Unit 3 will be replaced prior to restart.

TVA will formally notify the NRC of the status and resolution of the Rosemount issue for Unit 1 prior to Unit I restart.

TVA will exercise the option to exclude certain Unit 2 transmitters from the enhanced monitoring program. Wide range torus water level, drywell pressure, and containment Atmosphere Dilution flow to the Standby Gas Treatment System transmitters normally operate at such low pressures that calibration at the normal surveillance frequency is adequate to detect a loss of oil.

TVA maintains a monthly special Rosemount monitoring program for other Unit 2 transmitters in this category.

Recuested Action 2:

Perform an evaluation of the enhanced surveillance monitoring program to ensure that the program provides measurement data with an accuracy range consistent with that needed for manufacturer criteria for determining degradation caused by loss of fill oil.

TVA Response:

The Rosemount Special Monitoring Program uses a personal computer with an analog to digital converter and analog multiplexers.

The information obtained is used to compare different channel outputs of the same variable. The effect of potential drift of the analog to digital converter is avoided by using the same converter for all readings of the same variable.

Any errors introduced by the converter would be cancelled in a comparison because the errors would be introduced in all channels. The Special Monitoring Program equipment is calibrated yearly and is capable of delivering accuracies of greater than 1 0.2%.

This accuracy is sufficient for instrument comparisons.

Page 5 ENCLOSURE 1 (Continued)

Reportina Recuirements:

The licensee is requested to provide:

1.

A statement whether the licensee will take the Requested Actions.

2.

With regard to the actions requested, the licensee should provide:

a.

A list of the specific actions that the licensee will complete to meet Item 1 of Requested Actions for Operating Reactors b.

The schedule for completing licensee actions to meet Item 1 of Requested Actions c.

When completed, a statement confirming that Items 1 and 2 of Requested Actions have been completed.

3.

A statement identifying those actions requested by the NRC that the licensee is not taking and an evaluation for the bases for not taking the requested actions.

I JVA Response:

1.

TVA will take actions requested by NRC Bulletin 90-01, Supplement 1 for Units 2 and 3.

TVA will formally notify the NRC of the resolution plan and status of the Rosemount issue for Unit 1 prior to Unit 1 restart.

2a.

For Unit 2, TVA has initiated and will continue the Special Rosemount Monitoring Program described under Requested Actions.

TVA will exercise the option to exclude certain transmitters from the monitoring program per NRC Bulletin 90-01, Supplement 1.

This applies to transmitters in Unit 2 which operate at low pressures monitoring wide range torus water level, drywell pressure, and Containment Atmosphere Dilution flow to the Standby Gas Treatment System. Those transmitters normally operate at such low pressures that the calibration of these transmitters at the normal surveillance frequency is adequate to detect a loss of oil.

TVA will replace the applicable Unit 3 Rosemount units.

2b.

Actions related to the Rosemount issue for Unit 2 have been completed. Actions related to the Rosemount issue for Unit 3 will be completed prior to Unit 3 restart.

2c.

Actions related to the Rosemount issue for Unit 2 have been completed.

3.

TVA is not taking any exceptions to NRC Bulletin 90-01, Supplement 1.

ENCLOSURE 2 BROWNS FERRY NUCLEAR PLANT (BFN)

RESPONSE TO NRC BULLETIN 90-01, SUPPLEMENT 1 COMMITMENTS 1

1.

TVA will formally notify the NRC of the resolution plan and status of the Rosemount issue for Unit 1 prior to Unit I restart.

2.

TVA will continue the Rosemount Special Monitoring program for safety related or ATWS Unit 2 Rosemount transmitters. This applies to Model 1153 Series B, Model 1153 series D, and Model 1154 Rosemount transmitters which have not been replaced (or refurbished) and which were manufactured prior to July 11, 1989.

3.

Prior to Unit 3 restart, TVA will replace or refurbish the Model 1153 Series B, Model 1153 series D, and Model 1154 Rosemount transmitters l

in Unit 3 safety-related or ATWS applications, which were manufactured prior to July 11, 1989.

I l

l i