ML20034G414
| ML20034G414 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 03/03/1993 |
| From: | Mike Franovich Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| NUDOCS 9303090483 | |
| Download: ML20034G414 (4) | |
Text
.
/ b e A 4 7 % 4.4._
'I I
/
'o, UNITED STATES NUCLEAR REGULATORY COMMISSION l
)
(
o L
p WASHINGTON, D. C. 2055 4 March 3, 1993 I
Docket No.52-002 k
i MEMORANDUM FOR:
T. Hurley G. Lainas R. Zimmerman i
F. Miraglia
.J.
Roe B. Boger l
W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio' F. Congel D. Crutchfield B. Grimes E. Butcher i
W. Travers J. Richardson W. Bateman, ED0 i
T. Gody B. D. Liaw A. Vietti-Cook i
S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:
Jerry N. Wilson, Acting Director l
Standardization Project Directorate Associate-Directorate for Advanced Reactors and License Renewal l
Office of Nuclear Reactor Regulation FROM:
Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (HUMAN FACTORS)
DATE AND TIME:
March 11, 1993 (10:15 a.m. - 5 p.m.)
LOCATION:
ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor,'.annecticut 06095-0500 PURPOSE:
Meeting to discuss the CE System 80+ human factors engineering program and emergency procedure guidelines. A proposed agenda is-enclosed.
eyen"9 ?a x em,, e aw i 's i,5 * " "
050020 l
9303090483 930303
. i PDR ADOCK 0520 2
.=
i
. March 3, 1993 PARTICIPANTS *:
NRC ABB-CE i
G. West D. Harmon i
G. Galletti B. Fuld J. O'Hara J. Rec B. Stubler i
M. Franovich l
S. Magruder l
(Original signed by)
Michael X. Franovich, Project Manager i
Standardization Project Directorate i
Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation Enclosure-Meeting Agenda j
cc w/ enclosure:
See next page l
3
- Meetings between the NRC technical staff and applicants or licensees are i
open for interested members of the public, petitioners, intervenors, or l
other parties to attend as observers pursuant to "Open Meeting Statement of i
NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1121.
i DISTRIBUTION-Docket File PDST R/F SBajwa, 12G18 RBorchardt i
PDR JNWilson TVWambach MXFranovich PShea OPA EJordan, MNBB 3701 GGrant, EDO ACRS (11), w/o encl.
P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES i
NRR Mailroom,12G18 GWest, 10D24 REckenrode, 10D24 SMagruder, 9D4 GGalletti,10D24 BPerch, 8H7 I
0FC:
LA:PDST:ADAR PM:PDST:ADAR SC: ppt:ADAR NAME: PShea g MFrg[v;Tch:sg RB[hardt
+
f DATE: 03/ 3 93
'03d/53 03/j/93 0FFICIAL DOCUMENT COPY: CM0311b.MXF
ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C.
20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006
b CE System 80+
Human Factors Meeting March 11,1993 Windsor, Connecticut Proposed Agenda 10:15 - 10:30
Introductions
10:30 - 12:00 Nuplex 80+ Tour 12:00 - 01:00 Lunch 01:00 - 02:00 Task Analysis Submittal of January 18, 1993 02:00 - 03:00 Design Features Review Methodology 03:00 - 04:00 Emergency Procedure Guidelines / Minimum Inventory 04:00 - 05:00 Wrapup Review agreements and schedule.
Discuss closure of Elements 1-4 and Markup of CESSAR.
Establish date for next meeting.
i Enclosure