ML20034G350
| ML20034G350 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 02/26/1993 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Antony D NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20034G351 | List: |
| References | |
| NUDOCS 9303090368 | |
| Download: ML20034G350 (2) | |
See also: IR 05000282/1992024
Text
pamfGv
UNITED STATES
g.
S.;
NUCLEAR REGULATORY COMMISSION
y
e
Q
REGION lil
5
f
O,
&
GLEN E LLY N. f LLlNO15 60137
$9 *...*
_ _ d.
La
r C-
Docket No. 50-282
Docket No. 50-306
Northern Siates Pe=er Company
ATTN:
Mr. 3. D. Antony
Vice President, Nuclear
Ceneration
414 Nicolle: Mall
Minneapolis. MN 55401
Dear Mr. Antony:
This letter forwards the report of the announced team inspection conducted by
Messrs. E.
3.. Schweibinz, M. L. Dapas, D. C. Kosloff, C. E. Brown,
R. L. Sywater, T. J. Kobetz, and J. H. Neisler, from November 23, 1992,
through January 25. n
of activities at the Prairie Island Nuclear
Generating Plant, Units 2 and 2, authorized by NRC Operating Licenses
No. DPR-42 and No. DPR-60. This inspection was conducted serially, that is,
b
inspectors were onsite individually during different windows of the inspection
period.
We discussed our findings with Messrs. E. Watzl, M. Sellman,
G. Goering. and otner members of your staff on January 22, 1993.
Additional
debriefing meetings were held with representatives of your staff at the
conclusion af each inspection window.
The purpose of this inspection was to observe and evaluate ongoing activities
relative to various modifications including the station blackout / electrical
safeguards upgrade (SB0/ESU) modification, the independent spent fuel storage
installaticn (ISFSI), and the reactor coolant systen draindown modification.
The enclosed copy Of our inspection report identifies areas examined during
the. inspection. Within these areas, the inspection consisted of a selective
,
examination of procedures and representative records, observations, and
i
interviews with personnel .
'
No violations of EC requirements were identified during the course of this
i
inspection.
!
In accordarce with 10 CFR 2.790(a) of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
b
1
I
9303090368 930226
ADOCH 05000282
i
f
G
po
-
i
i
\\\\
\\
.
-m
. - - - -
- -
=
]
' llt.
.
.
EU .' 5 Ef;3
'
,
i
Northern States Power Company
2
-
,
!
We will gladly discuss any questions'you have concerning this inspection.
Sincerely,.
i
ff
y
W. D. Shafer, Chief
.
1
,
Reactor Projects Branch 2
i
, '
]
Enclosure:
'
'
inspection Reports
,
!' ) . 50-282/92024(DRP);
."
No. 50-306/92024(DRP)
>
cc w/ enclosure:
!
E. L. Watzl, Site Manager,
Prairie Island ~"e
i
M. Wadley, Plant
ager
DCD/DCB (RIDS)
j
OC/LFDCB
Resident inspector, Rlli Prairie
l
1sland
Resident inspector, RIII Monticello
-
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
_7
State Liaison Officer, State
of Minnesota
State liaison Officer, State
i
of Wisconsin
Prairie Island, LPM, NRR
!
.
!
I
!
~!
~
f
-;
r
!
!
!
.
--
,
'vn_
--
.-_
_
.
.
FEB 2 6 E33
!
Northern States Power Company
2
,.
!
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
hf
-
'l
W. D. Shafer, Chief
Reactor Projects Branch 2
Enclosure:
Inspection Reports
No. 50-282/92024(DRP);
No. 50-306/92024(DRP)
l
cc w/ enclosure:
E. L. Watzl, Site Manager,
!
Prairie Island Site
'
M. Wadley, Plant Manager
i
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII Prairie
Island
i
Resident Inspector, RIII Monticello
t
John W. Ferman, Ph.D.,
'
Nuclear Engineer, MPCA
!
State Liaison Officer, State
of Minnesota
State liaison Officer, State
of Wisconsin
-
Prairie Island, LPM, NRR
1
j
l
L
36
/N
,
f
RLId
RIII
RllJ
RIII
I
RIII
i
$
td4
J4 fcA
.
!
o
isS
i
nz B
Gardner
4.f Creed
Burgess
sen
r
-
ra
3
Para. 2.a,
Para. 7 Pa a. 5
2.b(I),3,& 6
74,
g\\w m
i
i
"
-