Text
,
N%b t
MAR 0 3 1993 i
Docket Nos. 50-352 50-353 50-277 50-278 Mr. D. M. Smith Senior Vice President -
Nuclear I
Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk i
P. O. Box 195 Wayne, PA 19087-0195
Subject:
EMERGENCY PREPAREDNESS (EP) MEETING
Dear Mr. Smith:
This letter refers to the January 7,1993 EP meeting held, at your staff's request, between members of your staff and members of the NRC Region I staffin King of Prussia, Pennsylvania.
The purpose of the meeting was to brief the NRC on the development of a Common Eraergency Plan for Limerick and Peach Bottom. Enclosed are specific items discussed during the meeting along with a copy of your agenda.
The meeting was beneficial to clarify our understanding of your proposed Common Emergency Plan, as well as informing us of future. EP projects, planned improvements for the site each Bottom Technical Support Center.
Operational Support Centers, and upgrade of ths n Thank you for taking the time to brief us on these matters.
Sincerely, Original Signed Ey:
M bCtfC h\\Mc(
080042
%>ames H. Joyner, Chief Facilities Radiological Safety l
and Safeguards Branch Division of Radiation Safety l
and Safeguards
Enclosures:
As stated i
I a r=
9303090133 930303
) b 0FFiCR R.rIORD COPI j! L y9 fDR ADOCK 0500 7
1
F MiiR 0 31993 Philadelphia Electric Company 2
l i
cc wiencl; R. Charles, Chairman, Nucicar Review Board D. R. Helwig, Vice President - Limerick Generating Station D. B. Miller, Vice President - Peach Bottom Atomic Power Station G. Rainey, Vice President, Nuclear Services Department G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station G. J. Beck, Manager - Licensing Section J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric B. W. Gorman, Manager, External Affairs R. McLean, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition
]
J. H. Walter, Chief Engineer, Public Service Commission of Mary?and G. Madsen, Regulatory Engineer - Limerick Generating Station secretary, Nuclear Committee of the Board Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector, Limerick NRC Resident Inspector, Peach Bottom Commonwealth of Pennsylvania TMI - Alert (TMIA) l l
1 l
OFFICIAL RECORD COPY L
w m
T F
l i
l '
I!!3 03 1233 i
Philadelphia Electric Company 3
bec w/ encl:
Region I Docket Room (with concurrences)
E. Wenzinger, DRP l
C. Anderson, DRP DRS/EB SALP Coordinator V. McCree, OEDO R. Clark, NRR J. Shea, NRR l
F. Rinaldi, NRR N. Perry, SRI, Yankee Rowe l
l l
l l
l l
l i
CONCURRENCES:
ffff*7 i
McCabe oyner L
j 3/ / /93 3/.L/93 3/) /93 i
\\
l lC 9$
OFFICIAL RECORD COPY lb dW
EMERGENCY PREPAREDNESS MEETING i
Licensee:
Philadelphia Electric Company l
1 l
Facilities:
Limerick Generating Station Peach Bottom Atomic Power Station Docket Nos.:
50-352, 50-353, 50-277, 50-278 Time and Date:
1:00 p.m., January 7,1993
Subject:
Common Emergency Plan for Limerick and Peach Bottom l
Attendees:
NRC:
C. Anderson, Chief, Projects Branch No. 2, DRP l
T. Easlick, NRC Resident Inspector, Limerick l
l E. McCabe, Chief, Emergency Preparedness Section, DRSS C. Gordon, Senior Emergency Preparedness Specialist, DRSS J. Laughlin, Emergency Preparedness Specialist, DRSS l
Licensee:
C. Adams, Emergency Preparedness Manager l
S. Keenan, Supervisor, Emergency Preparedness R. Krich, Branch Head, Nuclear Licensing C. Wesley, Engineer, Licensing i
R. Brown, Emergency Preparedness Supervisor, Limerick N. Yost, Emergency Preparedness Supervisor, Acting, Peach Bottom J. Jones, Media Relations M 'Vood, Media Relations Media:
S. Tady, Times Herald A. Wood, Philadelphia Inouirer I
Topics Discussed:
- 1. Update on key Emergency Preparedness projects
- 2. Operations Support Center Task Force i
- 3. Peach Bottom Technical Support Center upgrade
- 3. Nuclear Group (Common) Emergency Plan i
I
1
[
PHILADELPHIA ELECTRIC COMPANY
/NRC REGION I EMERGENCY PREPAREDNESS MEETING JANUARY 7,1993 t
d i
4
.I a
\\
f i
AGENDA I
i i
. INTRODUCTION
.i
. UPDATE ON KEY EMERGENCY l
PREPAREDNESS PROJECTS i
. OPERATIONS SUPPORT CENTER TASK t
FORCE l
. NUCLEAR GROUP EMERGENCY PLAN 1
. CONCLUSIONS I
i i
I i
l i
I l
PECo/NRC EMERGENCY PREPAREDNESS MEETING - JANUARY 7,1993 PAGE2 I
j INTRODUCTION l
. KEY PROJECTS CRAIG ADAMS l
i
. OPERATIONS SUPPORT
- BOB BROWN j
CENTER TASK FORCE
. NUCLEAR GROUP CRAIG ADAMS EMERGENCY PLAN i
. CONCLUSION /PECO
- DISCUSSION FOLLOW-UP ITEMS 1
-l 1
I
't d
PECo/NRC EMERGENCY PREPAREDNESS MEETING - JANUARY 7,1993 PAGE 3
EMERGENCY PREPAREDNESS - KEY PROJECTS
. NUMARC EMERGENCY ACTION LEVEL REVISION
. OPERATIONS SUPPORT CENTER TASK FORCE (BOB BROWN TO DISCUSS)
. PEACH BOTTOM TSC IMPROVEMENTS (NORM YOST TO DISCUSS)
. IMPLEMENTATION OF 10 CFR 20/ EPA-400 REQUIREMENTS OTIICA ON SYS M
. COMPLETION OF PEACH BOTTOM SIREN SYSTEM
. ERO TRAINING TO ENSURE CONSISTENCY OF PERFORMANCE DURING PROJECT IMPLEMENTATION d
f f
d W
(
PECo/NRC EMERGENCY PREPAREDNESS MEETING JANUARY 7,1993 PAGE 4
OPERATIONS SUPPORT CENTER TASK FORCE i
I l
. INTERNAL ASSESSMENTS INDICATING j
OPPORTUNITIES FOR IMPROVEMENT i
. DEVELOPMENT OF ACTION PLANS FOR PEACH BOTTOM AND LIMERICK i
. ORGANIZATIONAL REVIEW j
. LONGER TERM CHANGES TO FACILITIES i
- i
. ASSESSMENT OF EFFECTIVENESS OF IMPROVEMENTS - LGS /PBAPS l
. CASUALTY CONTROL DRILLS FOR 1993 l
i i
PECo/NRC EMERGENCY PREPAREDNESS MEETING - JANUARY 7,1993 PAGE 5
]
NUCLEAR GROUP EMERGENCY PLAN -
GOALS j
. CONSOLIDATE TWO SITE PLANS INTO ONE NUCLEAR GROUP EMERGENCY PLAN
. ESTABLISH CONSISTENCY BETWEEN
{
SITE PLANS
. ELIMINATE REDUNDANT INFORMATION i
THROUGH CROSS REFERENCES (E.G.,
LIST OF RADIOLOGICAL MONITORS IN PLAN THAT ARE CONTAINED IN SECTIONS 11 AND 12 OF THE UFSAR) j
. ENSURE MAINTENANCE OF PLAN IS EFFICIENT AND SUPPORTS LONG-TERM QUALITY
. CONDUCT CONSOLIDATION UNDER PROVISIONS OF 10 CFR 50.54Q
. ISSUE FOR NRC REVIEW CONSOLIDATED PLAN IN LATE JANUARY l
. ENSURE ANY NRC KEY QUESTIONS OR CONCERNS ARE RESOLVED PRIOR TO ISSUING NEW PLAN l
PECo/NRC EMERGENCY PREPAREDNESS MEETING JANUARY 7,1993 PAGE 6
NUCLEAR GROUP EMERGENCY PLAN -
SIGNIFICANT CHANGES REDUCTION OF REDUNDANT i
DESCRIPTIONS (E.G., SECTION 3 COMPARED TO OTHER SECTIONS)
MOVE PEACH BOTTOM FACILITY DESCRIPTIONS TO UFSAR (E.G., TSC DISCUSSION)
DESCRIBE EMERGENCY ACTION LEVEL PROCEDURE AS EXTERNAL PART OF PLAN - ELIMINATE REDUNDANT MAINTENANCE OF EAL TABLES PROVIDE MORE CONCISE DESCRIPTIONS OF OFFSITE
~
ORGANIZATIONS AND PLANS. THESE i
ARE ITEMS DESCRIBED IN GREAT i
DETAIL IN THEIR SEPARATE PLANS MAKE MAXIMUM USE OF ATTACHMENTS l
THAT ARE MAINTAINED SEPARATELY STRUCTURAL ORGANIZATION OF DOCUMENT MAY REQUIRE CONSIDERABLE EFFORT FOR DETAILED REVIEW OF PLAN (E.G., PLAN VERSUS ATTACHMENTS) i PECo/NRC EMERGENCY PREPAREDNESS MEETING JANUARY 7,1993 PAGE7
l NUCLEAR GROUP EMERGENCY PLAN -
l CONCLUSIONS
. DESIRE TO STRUCTURE PLANS TO ENSURE THAT DOCUMENTS ARE MAINTAINED EFFECTIVELY AND EFFICIENTLY.
I i
i
. PHILADELPHIA ELECTRIC HAS NO l
INTENT TO DIMINISH COMMITMENTS i
OR EFFECTIVENESS OF EMERGENCY i
l PLANS.
l
. CHANGES WE WILL INTRODUCE ARE i
OPEN TO INTERPRETATION OF REVIEWER - WE WANT TO RESOLVE ANY i
EMERGENT ISSUES EXPEDITIOUSLY.
. WE WANT TO BE CLEAR ABOUT THE i
REVIEW PROCESS - LEAD ORGANIZATION, COMMUNICATION, AND SUBSEQUENT MEETINGS. SCHEDULED REVIEW MEETING (E.G.,
FEBRUARY, MARCH, APRIL) OR CONTINUING DIALOG L
PECo/NRC EMERGENCY PREPAREDNESS MEETING
- JANUARY 7,1993 PAGE 8
EARLY EARLY 1m I
im i
1994 START FINISH NOV 1 DEC 1 JAN I FEB i MAR I ATE MY i JUN l JUL 1 AUG 1 UEP I OGT 1 NOV I DEC i JAH I FEU i MAR s AFR I MAY_
PROJ CT PLAft / CD APPROVED (SMMG-2) 1DEC92 28DEC92 i
J LRE PREPARE ENGINEERING TASK PLAN PREPARE lilSTALLATION TASK PLAtt 1DEC92 28DEC92 1DEC92 28DEC92 LSE PREPARE STATIOff TASK PLAN 290EC92 7JAt193 C3 PM PREPARE / ISSUE PROJECT PLAtt FOR APPROVAL 8JAN93 14J Af193 C. PROJECT PLAtt / CD APPROVED (DY SPOtlSOR) 18JAN93 t SMMG # 2 APPROVAL FUNDitlG APPROVED 1DEC92 21 DEC92 i
PREPARE / APPROVE CAPITAL AUTHORIZATIOtt MOD NGir1EERif1G ISSUED / RECEIVED DY INST.
1SDEC92 t DRILL PREPARE / ISSUE FitlAL DES.PKG. FOR APPROVAL 22DEC92 18JAN93 19JAN93 25JAN93 '
O APPROVEilSSUE FINAL DES.PKG.
2GJAN93 8FEB93 C"3 PM REVIEW /ADC ISSUE & DISTRIDUTION OF DES.PKG.
STATIOtl PROCEDURES PREPARED
= STATION PROCEDURES PREPARED & lilDEPEt3DEllT REVIEW 9FEB93 5APR93 l
=
READY TO WORK WORK PACKAGE PREPARATIOtt / ISSUE 4MAY93 28 JUT 193
= PROC, FAB. & DELIVER FIELD MATERIALS / EQUlPMENT 6APR93 28JUN93 _
=
28JUN93 6 READY TO WORK AWARD lilSTALLATION CONTRACT
= RECEIVE BIDS FOR lilSTALLATIOtt CONTRACT 9 FED 93 15 MAR 93
=
16 MAR 93 5APR93 REVIEW UlDS & AWARD P.O.-tilSTALLATION CONTRACT a lilSTALLATION CONTRACTOR MOBILIZATION & TRAINING 13JUL93 2AUG93 2
PHYSICAL WORK COMPLETE
= PHYSICAL WORK 3AUG93 1tlOV93 l
=
A-14 CLOSURE 2NOV93 15NOV93 C 3 MAT TEST COMPLETE
= A-14 CLOSURE
=
2NOV93 3JAN94 AS BUILTS COMPLETE AS-BUILTS 2NOV93 31JAt194 l
MOD dLOSED 1 FED 94 4APR94 MOD CLOSED (FUNDitlG CLOSURE LETTER,-
""*"""*'**"4""
PHILADELPHIA ELECTRIC COMPANY u
me 7.
U
[Y[A
- -- ; C.*.?
MOD # 5310 TECH SUPPORT CDITER
[1_$
PEACH 00TTOM ATOMIC POWER STATIOil W
r.&e, w u i m. e.,
i
~. ~
e.,
. m c.,
i
-..