ML20034G142
| ML20034G142 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/03/1993 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20034G143 | List: |
| References | |
| NUDOCS 9303090121 | |
| Download: ML20034G142 (3) | |
See also: IR 05000245/1992033
Text
,
-
._
..
-
-
--
-
Ides
3
.
.
1
l
.!
.
NR 0 31333
l
1
!
!
Docket Nos. 50-245; 50-336; 50-423
Mr. John F. Opeka
!
!
Executive Vice President-Nuclear
Northeast Nuclear Energy Company
[
P.O. Box 270
i
Hartford, Connecticut 06141-0270
t
Dear Mr. Opeka:
'i
SUBJECT:
MILLSTONE COMBINED INSPECTION 50-245/92-33; 50-336/92-35;
l
50-423/92-31
!
!
This refers to the safety inspection conducted by Mr. P. Swetland of this office on
December 23,1992, through February 2,1993, at Millstone Station in Waterford,
'j
Connecticut. The preliminary findings were discussed with Mr. S. Scace, the Unit Directors,
'!
and others of your staff at the conclusion of the inspection. Areas examined during the
.
inspection are described in the enclosed report. Within these areas, the inspection focused on
l
issues important to public health and safety and consisted of performance observations of
ongoing activities, independent verification of safety system status and design con 5guration,
,
interviews with personnel, and review of quality records.
,
!
During this inspection, you identified and corrected problems related to Unit 1 feedwater
flow transmitters and Unit 2 accident monitoring systems. We reviewed your corrective
l
actions and determined they were acceptable. We also noted the problems had minor safety
1
significance. Therefore, in accordance with Section VII.B of the Enforcement Policy,
enforcement discretion was exercised for these cases.
l
We appreciate your cooperation.
>
,
Sincerely,
,
-
,
t.
-J
l
?
080.03?.
A. Randolph Blough, Chief
[
Projects Branch No. 4
t
Division of Reactor Projects
i
Enclosure: NRC Combined Inspection Report 50-245/92-33; 50-336/92-35; 50-423/92-31
'
t
!
.!
.9303090121 930303
j
l
-PDR
ADOCK 05000245
'
0
,
y
>
i
.-.
-
.-
-
- .
-
t
!
.
a
o
ilAR 0 3 ri33
l
.
Northeast Nuclear Energy Company
2
,
cc w/ encl:
W. D. Romberg, Vice President - Nuclear, Operations Services
S. E. Scace, Vice President, Millstone Nuclear Power Station
-!
!
H. F. Haynes, Nuclear Unit Director, Unit 1
J. S. Keenan, Nuclear Unit Director, Unit 2
1
C. H. Clement, Nuclear Unit Director, Unit 3
i
R. M. Kacich, Director, Nuclear Licensing
'
D. O. Nordquist, Director of Quality Sen* ices
Gerald Garfield, Esquire
i
Nicholas Reynolds, Esquire
K. Abraham, PAO (2)
,
Public Document Room (PDR)
[
,
Local Public Document Room (LPDR)
!
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
>
State of Connecticut SLO Designee
,
!
<
,
i
j
i
l
- !,
.i
-
4-
l
l
1
!
,
j
i
!
l
1
.i
j
-
- - - .
. -
-
.
,
.
lu m 0 3 1933
Northeast Nuclear Energy Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
3. Joyner, DRSS
R. Blough, DRP
L. Doerflein, DRP
W. Raymond, SRI, Haddam Neck
P. Swetland, SRI Millstone
V. McCree, OEDO
-
DRS/EB SALP Coordinator
R. Barkley, DRP
bec w/ Report Cover Sheet and Executive Summary only:
C. Hehl, DRP
W. Hodges, DRS
R. Cooper, DRSS
J. Wiggins, DRP
W. Lanning, DRP
L. Bettenhausen, DRS
D. Holody, EO
W. Pasciak, DRSS
J. Durr, DRS
E
RI:DI
dh)PJ
RI:DY;)
-
RI:DRP
g]
h P.SWETLAND
L.DOERFLEIN
_A.BLOUGH
3 /3/93
3 /.5/93
3 >/93
/
OFFICIAL RECORD COPY
G:\\ SITES \\MILLST\\ COMB 33.123
I