Forwards Insp Repts 50-245/92-33,50-336/92-35 & 50-423/92-31 on 921223-930202.Licensee Identified & Corrected Problems Re Unit 1 Feedwater Flow Transmitters & Unit 2 Accident Monitoring Sys,Therefore,No Violations Noted
ML20034G142
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/03/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20034G143 List:
References
NUDOCS 9303090121
Download: ML20034G142 (3)


See also: IR 05000245/1992033

Text

,

-

._

..

-

-

--

-

Ides

3

.

.

1

l

.!

.

NR 0 31333

l

1

!

!

Docket Nos. 50-245; 50-336; 50-423

Mr. John F. Opeka

!

!

Executive Vice President-Nuclear

Northeast Nuclear Energy Company

[

P.O. Box 270

i

Hartford, Connecticut 06141-0270

t

Dear Mr. Opeka:

'i

SUBJECT:

MILLSTONE COMBINED INSPECTION 50-245/92-33; 50-336/92-35;

l

50-423/92-31

!

!

This refers to the safety inspection conducted by Mr. P. Swetland of this office on

December 23,1992, through February 2,1993, at Millstone Station in Waterford,

'j

Connecticut. The preliminary findings were discussed with Mr. S. Scace, the Unit Directors,

'!

and others of your staff at the conclusion of the inspection. Areas examined during the

.

inspection are described in the enclosed report. Within these areas, the inspection focused on

l

issues important to public health and safety and consisted of performance observations of

ongoing activities, independent verification of safety system status and design con 5guration,

,

interviews with personnel, and review of quality records.

,

!

During this inspection, you identified and corrected problems related to Unit 1 feedwater

flow transmitters and Unit 2 accident monitoring systems. We reviewed your corrective

l

actions and determined they were acceptable. We also noted the problems had minor safety

1

significance. Therefore, in accordance with Section VII.B of the Enforcement Policy,

enforcement discretion was exercised for these cases.

l

We appreciate your cooperation.

>

,

Sincerely,

,

-

,

t.

-J

l

?

080.03?.

A. Randolph Blough, Chief

[

Projects Branch No. 4

t

Division of Reactor Projects

i

Enclosure: NRC Combined Inspection Report 50-245/92-33; 50-336/92-35; 50-423/92-31

'

t

!

.!

.9303090121 930303

j

l

-PDR

ADOCK 05000245

'

0

PDR

,

y

>

i

.-.

-

.-

-

- .

-

t

!

.

a

o

ilAR 0 3 ri33

l

.

Northeast Nuclear Energy Company

2

,

cc w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Nuclear Power Station

-!

!

H. F. Haynes, Nuclear Unit Director, Unit 1

J. S. Keenan, Nuclear Unit Director, Unit 2

1

C. H. Clement, Nuclear Unit Director, Unit 3

i

R. M. Kacich, Director, Nuclear Licensing

'

D. O. Nordquist, Director of Quality Sen* ices

Gerald Garfield, Esquire

i

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

,

Public Document Room (PDR)

[

,

Local Public Document Room (LPDR)

!

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

>

State of Connecticut SLO Designee

,

!

<

,

i

j

i

l

- !,

.i

-

4-

l

l

1

!

,

j

i

!

l

1

.i

j

-

- - - .

. -

-

.

,

.

lu m 0 3 1933

Northeast Nuclear Energy Company

3

bec w/ encl:

Region I Docket Room (with concurrences)

3. Joyner, DRSS

R. Blough, DRP

L. Doerflein, DRP

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI Millstone

V. McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, PM, NRR

G. Vissing, PM, NRR

-

V. Rooney, PM, NRR

DRS/EB SALP Coordinator

R. Barkley, DRP

bec w/ Report Cover Sheet and Executive Summary only:

C. Hehl, DRP

W. Hodges, DRS

R. Cooper, DRSS

J. Wiggins, DRP

W. Lanning, DRP

L. Bettenhausen, DRS

D. Holody, EO

W. Pasciak, DRSS

J. Durr, DRS

J. Stolz, PD I-4, NRR

E

RI:DI

dh)PJ

RI:DY;)

-

RI:DRP

g]

h P.SWETLAND

L.DOERFLEIN

_A.BLOUGH

3 /3/93

3 /.5/93

3 >/93

/

OFFICIAL RECORD COPY