ML20034F822

From kanterella
Jump to navigation Jump to search
Forwards Integrated Plant Assessment Methodology Vol 1: Sys,Structures & Components Screening & Sys & Structure Itlr Screening Results
ML20034F822
Person / Time
Site: Calvert Cliffs  
Issue date: 03/02/1993
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034F823 List:
References
NUDOCS 9303050065
Download: ML20034F822 (2)


Text

,_

Mg Qi

~

x h-BALTIMORE U

OAS AND 4

\\.CTRIC ELE 1650 CALVERT CLIFFS PARKWAY LUSBY, MARYLAND 20657-4702

?;

RoeCRT C. DENTON Vict ParsetNT NUCLEAR ENERGY (4so) reo-44ss L

March 2,1993 U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Submittal of Systems, Structures and Components Screening Methodology Documents for License Renewal

REFERENCE:

(a)

Ixtter from Mr. R. E. Denton (BG&E) to NRC Document Control Dc.sk, dated February 25,1993, Proposed Schedule to Submit License RenewalDocuments

- Gentlemen:

As described in Reference (a), the following Jocuments are submitted for NRC review and approval:.

Systems, Structures & Components Screening Methodology Systems & Structures Screening Procedure Systi.s & Structures Screening Results We will be pleased to discuss these documents with you in detail at a future meeting.

Very truly yours, r

w l

- RED /JMO/dlm Attachments:

As Stated k UkOo$ 050003170,10002 930302 P

l gg/f j?ffpgioJ#0/

{

'}'

PDR

s 1

Document Control Desk March 2,1993 Page 2 cc:

0%thout Attachments)

D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McIran, DNR J. H. Walter, PSC OVith Attachments)

S. F. Newberry, NRC W. D. Tras ets, NRC l