y..
-
.,
.
. . .,
FEB 2 31993
,
,
Docket No. 50-333
Mr. Harry P. Salmon, Jr.
.
'
Resident Manager
New York Power Authority
James A. FitzPatrick Nuclear Power Plant
Post Office Box 41
Lycoming, New York 13093
SUBJECT:
NRC REGION I INSPECTION NO. 50-333/92-27
This refers to the results of the routine resident safety inspection conducted by Messrs. W.
Cook, J. Tappert, and others from December 25,1992 to January 23,1993 at James A.
,
FitzPatrick Nuclear Power Plant, Scriba, New York. A summary of the inspection findings .
'
was presented to you and members of your staff at the conclusion of the inspection.
This inspection was directed toward areas important to public health and safety. Areas
examined during the inspection are described in the NRC Region I inspection report, which
is enclosed with this letter. Within these areas, the inspection consisted 'of observation of
activities, interviews with personnel, and document reviews. The inspectors conducted
extensive observations during the plant startup and power ascension. Overall, there was
comprehensive management oversight and the startup was conducted in a slow, deliberate and
safe manner.
Overall performance during this inspection period was good. However, the inspectors found
a lack of procedural adherence in the control of a plant computer software changes to correct
a jet pump differential pressure display. We note that your corrective actions to this issue
were prompt and comprehensive and that the actual safety significance of the procedural
noncompliance was minor. Therefore, the procedural violation is not being cited in
accordance with the provisions of 10 CFR 2 Appendix C Section V.A of the Enforcement
Policy.
]
Your cooperation with us is appreciated.
Sincerely,
Curtis J. Cowgill, Chief
Projects Branch No.1
Division of Reactor Projects
-
Enclosure:
,
NRC Region I Inspection Report Number 50-333/92-27
OFFICIAL RECORD COPY,
1~/qi
93o3o40o41 93022a
,
l
ADOCK 05000333
p
C
,;.
.4
.
Mr. Harry P. Salmon, Jr.
2
.
cc w/ encl:
!
J. Brons, President
R. Beedle, Executive Vice President
J. Gray, Director, Nuclear Licensing - BWR
G. Goldstein, Assistant General Counsel
Supervisor, Town of Scriba
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
Director, Power Division, Department of Public Service, State of New York
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
K. Abraham, PAO-RI (2)
f
s
t
t
i
a
OFFICIAL RECORD COPY
~
,
1
,.
-.,
.
Mr. IIarry P. Salmon, Jr.
3
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
'
C. Cowgill, DRP
R. Urban, DRP
P. Eselgroth, DRP
G. Tracy, SRI-IP3
V. McCree, OEDO
B. McCabe, NRR
R. Capra, NRR
bec w/ Report Cover Letter and Executive Summary only
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
W. Lanning, DRS
J. Durr, DRS
L. Bettenhausen, DRS
S. Shankman, DRSS
R. Cooper, DRSS
J. Joyner, DRSS -
t
,
e
h
I:DRP
RI:DRP
RI:DRP
k[g%' Cook
Eselgroth
CCowgill
yt
MfA
!
'
9 /M /13
0/g/53
/ /
'
i
F
OFFICIAL RECORD COPY -