FEB 2 41993
Docket No. 50-333
Mr. Harry P. Salmon, Jr.
Resident Manager
New York Power Authority
James A. FitzPatrick Nuclear Power Plant
Post Office Box 41
Lycoming, New York 13093
Dear Mr. Salmon:
SUBJECT:
NRC INSPECTION REPORT NO. 50-333/92-24
Reference:
Cable Separation Startup 1ssue Identified by NRC Inspectors on -
October 5-14,1992 (Inspection Report No. 50-333/92-82)
This letter refers to the cable separation inspection conducted by Mr. R. J. Paolino, of this-
Office on December 7-9,1992, at the James A. Fitzpatrick Facility located in Scriba,
New York and subsequent telephone conversations with licensee personnel providing
additional test data and information for in-office review, through December 23,1992. The
.
result of this review was discussed by Mr. J. E. Beall, of this office, with members of your
staff on December 24,1992.
Areas important to public health and safety examined during this inspection are described in
the Region I inspection report, which is enclosed with this letter. Within these areas, the
inspection consisted of selective review of procedures and representative records, interview
with personnel, and observations by the inspector regarding the cable separation startup issue
identified during the October 20,1992, NRC inspection.
Within the scope of this inspection, no violations were observed.
I
-
9303040009 930224
"
ADOCK 05000333
I
0
ppg
-
.-
-.
,lL,
4
t
FEB 2 41993
-
. .
,
Mr. Harry P. Salmon, Jr.
2.
l
No response to this letter is required. Thank you for your cooperation in these matters.
Sincerely,
,
ORIGINAL S1GNED BY
WAYNE D. LANNiNG .
-
Jacque P. Durr, Chief
Engineering Branch,
Division of Reactor Safety _
Enclosure: NRC Region I Inspection Report No. 50-333/92-24
cc w/cact:
J. Brons, President '
R. Beedle, Executive Vice President - Nuclear
G. Goldstein, Assistant General Counsel
,
J. Gray, Jr., Director, Nuclear Licensing - BWR
,
Supervisor, Town of Scriba
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law -.
>
.
Director, Energy & Water Division, Department of Public Service, State of New York
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
bec w/ encl:
i
Region I Docket Room (with concurrences)
C. Cowgill, DRP
l
P. Eselgroth, DRP
R. Urban, DRP
W. Cook, SRI - FitzPatrick
G. Tracy, SRI - IP-3
V. McCree, OEDO
j
R. Capra, NRR
B. McCabe, NRR
DRS/EB SALP Coordinator
i
D. Holody, EO
'
i
- -
FEB 2 41993
.
Mr. IIarry P. Salmon, Jr.
3
.t
'
a
f
.
,
W
r
.
t
i
i
i
h . RI:DRS
RI:DR
RI:DRS
Paoli
urr
2/le'93
2Tt/93
2 [/93
OFFICIAL RECORD COPY